HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - CORRESPONDENCE -Quality Control Division, WQCD-PE-B2, 4300 Cherry Creek Drive South, Denver, Colorado 80222-1530. Attention:
Permits and Enforcement Section. Ph: (303)692-3590.
Statement of facilities City is responsible for inspecting/maintaining
Please add the alignment of all existing and proposed drainage facilities to the utility plan
ST-4(, ST-5,1S_T-6, andthebaker irrigation lateral are all below the requiredslopeof 0.4% please revise Oa,✓
PO. TlLA'' rOl4N.S �J1II WG ®G4�/V�^��.1-Yv vv�'Vw�l.7" V
NO in G'z---it +1 v ass 4 n 5- l Lv W r" PIC, v SG S
Be sure and return all 6f your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Ted Shepard
City Planner
Page 2
— t 4 eeel 1644e-� �i�-k E— �v� e � e(,� t �j
�wttni�✓'R'�''ve. (-�eat✓�vt� -
STAFF PROJECT REVIEW
Citvof Fort Collins
VF RIPLEY Date: 2/26/2003
LOUISE HERBERT
401 W. MOUNTAIN AVE. #201
FT. COLLINS, CO 80521
Staff has reviewed your submittal for MAPLE HILL PDP - TYPE I (LUC) #29-OOA, and we
offer the following comments:
4 glee of
ISSUES: I
Department: Engineering Issue Contact: Dave Stringer
Topic: plat
Number: 87 Created: 2/25/2003
Page 2/7 is the reference note correct, or is there another note 3 that I don't see?
Number: 88 Created: 2/25/2003
page 4/7 Are any easements need for lot 1 Block 32? If so show them on this plat, otherwise easements will need to be
processed prior to building permit issuance for thiis lot. Move street name out from under match line so it is readable
Number: 89
Page 5 of 7, Change Street C to Maple Hill Drive
Topic: Utility Plans
Created: 2/25/2003
Number: 90 Created: 2/25/2003
Page 21/130 What is dark line along east edge of lots 1-12? Remove or identify as ??
Number: 91 Created: 2/25/2003
Page 24/130 Need to meet with Engineering, Street Oversizing and Stormwater to discuss phasing plan
Number: 92 Created: 2/25/2003
Page 28/130 If detail applies to all defelection/lowering situations add Typical to text. Also should move note so it is
easily identifiable. Maybe into Tract I area, use larger text
Number: 93 Created: 2/25/2003
Page 29/130 Show length of PVC stub pipe onto PR1 property. Will need off -site easements for stubs onto their
property
Department: Stormwater Utility
Topic: Utility Plans
Number: 94
Issue Contact: Basil Harridan
Created: 2/25/2003
Please change local enity to City of Fort Collins
Swale D-D has a slope of 1.7% and is grass lined however per City of Fort Collins standards an swalle less than 2.0%
slope must be concrete lined, please change
The plans show a club house being build please add finished floor elevations
Please provide a cross section of the spillway complete with spot elevations
Please clearly label the high point elevetions
Please add the following to the General Notes:
If dewatering is used to install utilities, a State Construction Dewatering Wastewater Discharge Permit is required if
discharge is into a storm sewer, channel, irrigation ditch, or any waters of the United States.
All construction activities must comply with the State of Colorado permitting process for "Stormwater Discharges
Associated with Construction Activity." For information, please contact the Colorado Department of Health, Water
Page l