HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - CORRESPONDENCE - REVISIONS (3)6) Letter: Number 8 outlet, Eaton ditch. From Dave Stringer, City of Fort Collins
Engineering Department. Dated 8/14/01.
7) Letter: Variances. From Matt Delich, Traffic and Transportation Engineering.
Dated 11/12/02.
8) Memorandum: Meeting minutes concerning collector street connections and
trail alignment. From Linda Ripley , VF Ripley Associates. Dated 10/24/01.
9) Letter: Concerning collector street connections and trail. From Mark Jackson,
City of Fort Collins, Transportation Planning. Dated 11/1/02.
10) Email: Vine / Lemay and APF. From Eric Bracke, City of Fort Collins,
Traffic Engineering. Dated 3/29/01.
11) Letter: Interim street improvements at Vine and Lemay.
From Fraizer Walsh, TST Engineers. Dated 2/15/02.
12) Country Club Road Slope Easement Dedication Letter of Intent. From Kenneth
Forbes. Dated 4/4/03.
13) Document: Minor Amendments and Alternative Compliances for Maple Hill.
From TST Engineers. Dated 4/3/02.
Please call if you have any questions.
Yours Sincerely,
Louise Herbert
VF Ripley Associates
\/ r�iPIe-YASSOCIATES ]NO
Landscape Architecture Urban Design Planning
April 3, 2003
Ted Shepard
Fort Collins Current Planning Department
281 North College Avenue
Fort Collins, CO 80524
Dear Ted,
Re: Maple Hill Project Development Plan (P.D.P).
Please find attached copies of the following documents and drawings for the hearing on
April 10, 2003.
A) Drawings.
1) Two sets of I l x 17 of VF Ripley plans and elevation drawings.
(11 sheets).
2) Two sets of 24 x 36 of TST Engineers — East Vine Drive and North Lemay
Avenue (4 sheets).
B) Documents. Two sets of the following documents:
1) Letter: Re: Review of Demolition Proposal, Gillespie Farm Buildings, 2404
N. County Road 11. From Karen McWilliams, City of Fort Collins, Advance
Planning Department. Dated 8/6/01.
2) Letter: Confirmation on the land acquisition for a public park
and public trial system. From Craig L. Foreman, City of Fort Collins, Cultural,
Library, Recreational Services. Dated 4/3/03
3) Slope Easement Dedication ( Poudre School District R-1 Property -
County Club Road). Dated 4/2/03.
4) Stormwater Easement Agreement ( Larimer and Weld Irrigation Property -
North Easement). Dated 4/l/03.
5) Letter: Windsor Reservoir and Canal Company. From The Dow Law Firm, LLC
Dated 1/27/03.
Phone 970.224.5828 Fax 970.224.1662
401 West Mountain Ave. Suite 201
Fort Collins, CO 80521-2604
Oripley.com