HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETv
rA
M.J"A C.K4as
Project: Date:
Planner: �' S' Traffic Operations: Engineer: s'
ems Requested
Redlinedems Being Returned
�—,
m
a
_
m
0
Other Items Required
:1,
in
�
to
,�
a
�
j
m
� "
0
Other Items being
Returned
Engineering
Y.
r
Stormwater
X.
I x
I ?-
jr,
)6
Water/Wastewater/FCLW D
Traffic Operations
Transportation Plannin
x,
iL
Transfort
Engineering Pvmt.
Light & Power
Technical Services
PFA
LA r+E1c Gevr►Th Ert (4
x
J
G
TOTALS
3
3
Other:
i
Note: All redlined items should be returned with the resubmittal/revisions.
REVISION ROUTING SHEET
ITEM:
DATE RECEIVED: r14 _
�
z
w
z
o
W
a
�
FILE: PROJECT PLANNER
ZONING
10
BUILDING INSPECTION
FORESTRY f.. ,
POLICE - JOE GERDOM
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
W EST
XCEL ENERGY cjv
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
MOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
NATURAL RESOURCES
PARK PLANNING oll,
,con. J ioE
3
4
a
Ll
t
TOTAL
(a
o1
GLlI
0.20% X- 9,0 ✓ Md