HomeMy WebLinkAboutCHRISTIAN BROTHERS AUTOMOTIVE - PDP - PDP170018 - SUBMITTAL DOCUMENTS - ROUND 1 - TDR APPLICATIONCity of
F6rt Collins
Site Address:
Job Valuation: $0.00 Category:
Transactions
Check CK#006605 05/18/2017
Receipt issued: 05/18/2017 Total Paid to Date
Fee Description Account Code
Development Review Fee 1000A44040
Mailings 1000.444050
PFA Development Review 8400,444999
Fee
Sign Posting 1000 444050
Transportation Dev Review 902010.444030
Community Development & Neighborhood Services
28i N. College Ave Fort Collins, CO 80522
970.221.676o 970.224.6134 -.fax
PermitlProject#: PDP170018
Applied: 06/18/2017
Type: Project Development Plan
Amount Paid
Comments
Paid with check #006605
$7,754.00
$7,754.00
Fee Amount
Amount Paid
Date Paid
Amount Due
$3,887 00
$3,887.00
05/18/2017
$0.00
$31.50
$31.50
05/18/2017
$0.00
$250.00
$250,00
05/18/2017
$0.00
$50.00
$50 00
05/18/2017
$0.00
$3,535.50
$3,535.50
05/18/2017
$0.00
TOTAL FEES: $7,754.00 $7,764.00 $0.00
TOTAL BALANCE DUE AS OF 05/18/2017: 0.00
Fee Amounts are valid for date of this document only. Fees subject to change without notice.
Form Revised May 2011
FO1'of t C011lflS Transportation Development Review Fee Date Received/ Paid
Total Amount Pal
P0� Project Name: Christian Brothers Automotive
Project Location: 1500 Academy Court Date:
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
Fee structrtre amount due
C Overall Development Plan (CDP) S500 each
I- Final Development Plan (FDP)
This fee includes 2 rounds of review $1000 each
C Additional round of review $ 500 each
❑ Annexation $20 X acres - + $250 =
The maximum fee for each annexation document/ filing shall be S2,000
❑ Minor Amendment S 159 each
❑ Major Amendment $2,500 each
❑ Re -zone $200 each
❑ Modification to Land Use Code $200 each
❑ Wireless Telecommunication Equipment (WTE) $65 each
❑ Road Projects acres (of roadway) X $3,500 =
❑ Vacation of Easement(s) '•' # of vacations _ X $400 =
❑ Vacation of Right(s)-of--Way ••• # of vacations _ X $800 =
❑ Dedication of Easement(s) and/or Right(s)-of--Way •••
# of dedications _ X $250 =
X Project Development Plan (PDP) or Basic Development Review
Project requiring Transportation Services Review and/or utility plan review.
This fee includes 3 rounds of review.
Detached Single Family $160 per unit
# of units X $160 -
Multifamily or other residential units S 115 per unit
# of units X $115 =
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
4 995sq ft x $025 - 1,248.75
Size of the development (area being planed or if not being
platted size of parcel accompanying all development
improvements) $250 per acre 1,147 acres X S 250 = 286.75
Project fee $2,000 each $2M
Total of above amounts 3,535.50
If this fm amount exceeds $30,000 then the fee amount shall be adjusted with the
following formula: $30,000 + % (the amount over 30,000
The maximum fen for any residential ONLY project shall be S500 per residential unit
This check should be used to verify the fen smount (does not apply to mixed -use
developments). POP fm shall be the leaner of this amount m the above calculated
amount. # of residential units x S500 =
If this fen amount equals or exceeds S65,000 then the City Manager shall have the ability
to reduce the fen aruounL
General Information:
Owners Name(s)•
Christian Brothers Automotive Corn
Street address:
17725 Katy Freeway Suite 200
City/State/zip: Houston, TX 77094
Telephone:281,675,6105 Fax:
Applicants/ Consultants Firm Name:
Baseline Engineering Corp.
Contact: Todd Rand
Street address:
4007 S Lincoln Avenue, Suite 405
City/State/ zip: Loveland, CO 50537
Telephone: 970-353-7600 Fax: ext 312
Certification:
By signing this permit 1 acknowledge that I am acting with
the knowledge, consent, and authority of the owners of the
property (including all owners having legal or equitable
interest in the real property, as defined in Section 1-2 of the
City Code; and including common areas legally connected
to or associated with the property which is the subject of
this application) without whose consent and authority the
requested action could not lawfully be accomplished.
Pursuant to said authority, I hereby permit City officials to
enter upon the property for purposes of inspection.
Name (please printleir
Airtis C
Signature: �—
Telephone: 281.675.6105
Foot Notes:
When a development project involves a change of use for a
building, the charge per square foot shall apply to the portion of
the overall building size for which the change of use is proposed,
provided that the new use generates more traffic than the existing
case, as determined by the cum, Institute of Transportation
Engineers Trip Generation. If the new use does not generate mom
traffic than the existing use then the charge per square foot for
shall apply only to the net additional building size (if any).
These fees do not include the cost of filing fees fm the recording of
the Development Agreement When a Development Agreement or
Amendment Agreement is entered into the Developer shall be
responsible for the coat of recording the document Said filing fees
shall be calculated and provided when the signed document is
returned to the City for signatures and filing.
Reduction for affordable bowing - a copy of the City letter certifying/ authorizing the ••• This fee does not include the cost of filing fees. Filing
affordable housing shall be provided with this application. Amount of rductim to be fees shall be determined at the time of final document
applied _ _ submittal and will be required prior to filing.
Total owed for PDP S3,535.50 cc: Christie White, Engineering
2012 form Development Review Engineering