Loading...
HomeMy WebLinkAboutCHRISTIAN BROTHERS AUTOMOTIVE - PDP - PDP170018 - SUBMITTAL DOCUMENTS - ROUND 1 - TDR APPLICATIONCity of F6rt Collins Site Address: Job Valuation: $0.00 Category: Transactions Check CK#006605 05/18/2017 Receipt issued: 05/18/2017 Total Paid to Date Fee Description Account Code Development Review Fee 1000A44040 Mailings 1000.444050 PFA Development Review 8400,444999 Fee Sign Posting 1000 444050 Transportation Dev Review 902010.444030 Community Development & Neighborhood Services 28i N. College Ave Fort Collins, CO 80522 970.221.676o 970.224.6134 -.fax PermitlProject#: PDP170018 Applied: 06/18/2017 Type: Project Development Plan Amount Paid Comments Paid with check #006605 $7,754.00 $7,754.00 Fee Amount Amount Paid Date Paid Amount Due $3,887 00 $3,887.00 05/18/2017 $0.00 $31.50 $31.50 05/18/2017 $0.00 $250.00 $250,00 05/18/2017 $0.00 $50.00 $50 00 05/18/2017 $0.00 $3,535.50 $3,535.50 05/18/2017 $0.00 TOTAL FEES: $7,754.00 $7,764.00 $0.00 TOTAL BALANCE DUE AS OF 05/18/2017: 0.00 Fee Amounts are valid for date of this document only. Fees subject to change without notice. Form Revised May 2011 FO1'of t C011lflS Transportation Development Review Fee Date Received/ Paid Total Amount Pal P0� Project Name: Christian Brothers Automotive Project Location: 1500 Academy Court Date: Type of Submittal Please indicate the type of application submitted by checking the box preceding the appropriate request(s). Fee structrtre amount due C Overall Development Plan (CDP) S500 each I- Final Development Plan (FDP) This fee includes 2 rounds of review $1000 each C Additional round of review $ 500 each ❑ Annexation $20 X acres - + $250 = The maximum fee for each annexation document/ filing shall be S2,000 ❑ Minor Amendment S 159 each ❑ Major Amendment $2,500 each ❑ Re -zone $200 each ❑ Modification to Land Use Code $200 each ❑ Wireless Telecommunication Equipment (WTE) $65 each ❑ Road Projects acres (of roadway) X $3,500 = ❑ Vacation of Easement(s) '•' # of vacations _ X $400 = ❑ Vacation of Right(s)-of--Way ••• # of vacations _ X $800 = ❑ Dedication of Easement(s) and/or Right(s)-of--Way ••• # of dedications _ X $250 = X Project Development Plan (PDP) or Basic Development Review Project requiring Transportation Services Review and/or utility plan review. This fee includes 3 rounds of review. Detached Single Family $160 per unit # of units X $160 - Multifamily or other residential units S 115 per unit # of units X $115 = Commercial, Industrial, Retail, and/or Non residential building square footage $0.25 per square foot 4 995sq ft x $025 - 1,248.75 Size of the development (area being planed or if not being platted size of parcel accompanying all development improvements) $250 per acre 1,147 acres X S 250 = 286.75 Project fee $2,000 each $2M Total of above amounts 3,535.50 If this fm amount exceeds $30,000 then the fee amount shall be adjusted with the following formula: $30,000 + % (the amount over 30,000 The maximum fen for any residential ONLY project shall be S500 per residential unit This check should be used to verify the fen smount (does not apply to mixed -use developments). POP fm shall be the leaner of this amount m the above calculated amount. # of residential units x S500 = If this fen amount equals or exceeds S65,000 then the City Manager shall have the ability to reduce the fen aruounL General Information: Owners Name(s)• Christian Brothers Automotive Corn Street address: 17725 Katy Freeway Suite 200 City/State/zip: Houston, TX 77094 Telephone:281,675,6105 Fax: Applicants/ Consultants Firm Name: Baseline Engineering Corp. Contact: Todd Rand Street address: 4007 S Lincoln Avenue, Suite 405 City/State/ zip: Loveland, CO 50537 Telephone: 970-353-7600 Fax: ext 312 Certification: By signing this permit 1 acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection. Name (please printleir Airtis C Signature: �— Telephone: 281.675.6105 Foot Notes: When a development project involves a change of use for a building, the charge per square foot shall apply to the portion of the overall building size for which the change of use is proposed, provided that the new use generates more traffic than the existing case, as determined by the cum, Institute of Transportation Engineers Trip Generation. If the new use does not generate mom traffic than the existing use then the charge per square foot for shall apply only to the net additional building size (if any). These fees do not include the cost of filing fees fm the recording of the Development Agreement When a Development Agreement or Amendment Agreement is entered into the Developer shall be responsible for the coat of recording the document Said filing fees shall be calculated and provided when the signed document is returned to the City for signatures and filing. Reduction for affordable bowing - a copy of the City letter certifying/ authorizing the ••• This fee does not include the cost of filing fees. Filing affordable housing shall be provided with this application. Amount of rductim to be fees shall be determined at the time of final document applied _ _ submittal and will be required prior to filing. Total owed for PDP S3,535.50 cc: Christie White, Engineering 2012 form Development Review Engineering