Loading...
HomeMy WebLinkAboutBELLA VISTA - PDP - 45-01A - CORRESPONDENCE - (13)e. Trucks need 13'6" overhead clearance. 7. Light and Power: a. There is existing power available on the west side of the site. b. A C1 form will need to be filed for the commercial component of the project. c. This project will need a utility coordination meeting. d. Normal development fees apply. 8. Transportation: a. The project will require a Traffic Impact Study (TI5) that addresses site access, and all modes of transportation including automobile, bicycle, pedestrian, and transit. Contact Kathleen Reavis for the pedestrian scope and Eric Bracke for the automobile scope. b. You are showing good internal pedestrian circulation within the site. c. Keep the pedestrian and parking areas separate. 9. Advance Planning: a. MMN Zoning is appropriate. 10. Park Planning: a. The neighborhood and community parkland fees are based on square footage of each unit, and are due at the time of building permit. b. A fee schedule was given to you at the meeting. _ - 11. Current Planning: a. . Refer to Section 3 (General Development Standards), and Section 4.4 (LMN Zoning District) in the Land Use Code for the standards that apply to your propose development. The Land Use Code is available to view on the internet at www.ci.fort-collins.co.us/CITY HALL/CODES. b. Because this is a mixed -use building, the Building Standards that apply are Sections 3.5.1 Building and Project Compatibility, and 3.5.3 Mixed -Use, Institutional, and Commercial Buildings. c. The Residential Building Standards in 3.5.2 do not apply to this project because it is a mixed -use building. d. Section 3.5.3(B)(2) requires that the building maintain a build -to line along both Stanford (no more than 15 feet) and Horsetooth (10 to 25 feet), and that there can be no vehicle use area between the building faces and the street. Exceptions can be permitted for patios, courtyards, or plazas between the building and the street. e. Building bays must be established along the facades at least every 30 feet. f. Primary entrances must be clearly defined. g. Base and top treatments are required along all facades. 4 pedestrian, and transit. Contact Kathleen Reavis for the pedestrian scope and Eric Bracke for the automobile scope. f. A median may be necessary on Horsetooth to control right-in/right-out access. g. A median may need to be required in Stanford if full -movement access is not allowed. h. As shown, there are some sight distance concerns at the Stanford access. i. You will be required to have a Development Agreement, a Development Construction Permit, and Utility Plans. 4. Water & Wastewater Utility: a. There is a 12-inch water main in Stanford; and a 20-inch water main on the south side of the property along Horsetooth. b. There is an 8-inch sanitary sewer running diagonally across corner of the site with a 15 foot easement on each side of the line. It may be.alright to put a patio over this sewer line. c. Separate water & sewer services will be needed for.the residential and commercial portions of the project. d. The water conservation standards for landscape and irrigation will apply to this project, and Plant Investment Fees and water rights are due at time of building permit. e. There may be some repays due. 5. •Natural Resources: a. If there any prairie dogs on site, they will have to be relocated or humanely eradicated. b. Trash enclosures should accommodate recycling containers of sufficient size to accommodate the type of recycling appropriate for the building use (cardboard, cans, plastics, etc.), and dumpsters must be enclosed within a fenced or walled area.. c. We ask that a single trash hauler be used to minimize traffic impacts. d. Native grasses and plant materials should be used wherever appropriate, and bluegrasses should be minimized. e. If construction lasts for more than 6 months, you will have to file a permit for fugitive dust control with.Larimer County. 6. Fire Department: a. Address must be visible from the street using a minimum 6" numerals on a contrasting background. b. The required fire hydrant capacity is 1500 g.p.m @ 20 p.s.i. c. Buildings 3 stories or more are required to be fire sprinklered. d. The fire trucks will need a 50 foot curb radius (25 foot inside radius). 3 COMMENTS 1. Zoning Department: a. Parking is limited to a maximum number for the commercial uses and is required to have a minimum number of spaces for the residential uses. b. The residential parking requirements are based on the number of bedrooms per unit. c. MMN is the appropriate zoning for the site based on the structure plan designation. d. Provide bicycle parking and handicap parking. e. Provide trash enclosures. f. Street trees will be required at 30 to 40 foot spacing intervals along both Stanford Road and Horsetooth Road. g. "Contextual" height requirements are base on abutting properties. The Marriott may or may not be considered abutting. 2. Stormwater Utility Department, a. This site is in the Foothills drainage basin where the new development fee is $6,525/acre and is subject to the runoff coefficient reduction. b. The site is in inventory grid #8N. c. The standard drainage and erosion control reports and plans are required and they must be prepared by a professional engineer registered in Colorado. d. There is a stormsewer outfall system at the corner of Stanford and Horsetooth but that may be the higher end of the site. If the site drains to the east of this outfall, then an outlet into Horsetooth is an option but the street capacity may limit the outf all release rate. If the Stanford/Horsetooth outf all is to be used, a capacity analysis of that outf all would be needed unless the Standard 2 year historic release rate is used. Horsetooth street capacity may also be a limitation if used to drain from the east end of the site back to Stanford/Horsetooth. e. Water quality extended detention is required to treat the runoff. 3. Engineering Department: a. Street Oversizing Fees are $1.75 to $3.70 per square foot gross leasable area for business uses, and $1021 per dwelling unit. Check with Matt Baker for the specific amount of this fee for your project. b. Additional street right-of-way and utility easements must be dedicated along Stanford Road (to collector without parking standards) and Horsetooth Road (to arterial standards). c. We will have to evaluate the access points on Stanford and Horsetooth. d. Sidewalk, curb, and gutter will be required along Stanford and Horsetooth. e. The project will require a Traffic Impact Study (TI5) that addresses site access, and all modes of transportation including automobile, bicycle, 2 CONCEPTUAL REVIEW STAFF COMMENTS City of Fort Collins. MEETING DATE ITEM:' APPLICANT: LAND USE DATA: April 3, 2000 Mixed -Use residential and commercial building at the northeast corner of Stanford Road and Horsetooth Road. Eldon Ward Cityscape Urban Design Inc. 3555 Stanford Road, Suite 105 Fort Collins, CO 80525 Request is for 78 dwelling units with 18,000 square feet of non -'residential floor' area including a 10,000 square foot roof garden, a 144 space parking structure, an exercise room and meeting room/lounge. The parking structure is partially below the building and partially below a roof deck. There is also some surface parking along Horsetooth Road. DEPARTMENTAL CONTACTS: Current Planning- Troy Jones 221-6750 Advance Planning- Doug Moore 221-6226 Zoning Department- Jenny Nuckols 221-6760 Engineering Department- Tim Blandford 221-6605 Street Oversizing Coordinator- Matt Baker 221-6605 Poudre Fire Authority- Ron Gonzales 221-6570 5tormwater Utility- Glen Schlueter 224-6065 Water & Sewer Utilities- Roger Buffington 221-6854 Natural Resources Development Planner Kim Kreimeyer 221-6750 Light and Power Monica Moore 221-6700 Transportation Services (ped. & transit) Kathleen Reavis 224-6140 Transportation Services (traffic) Eric Bracke 224-6062 Transfort (local bus service) Gaylene Rossiter 224-6195 Park Planning Craig Foreman 221-6618 COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO80522-0580 (970) 221-6750 CURRENT PLANNING DEPARTMENT 1: . City of Fort Collins Community Planning and Environmental Services Current Planning Eldon Ward Cityscape Urban Design Inc. 3555 Stanford Road, Suite 105 Fort Collins, CO 80525 April 10, 2000 Dear Mr. Ward: For your information, attached is a copy of the Staff's comments concerning the Bella Vista mixed -use project presented before the Conceptual Review Team on April 3, 2000. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to -these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, 1 Trfoy . Jones City Planner cc: Eric Bracke, Streets Department Stormwater Department Project Planner 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020