Loading...
HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - CORRESPONDENCE - (6)68 Street 1 needs to align on northern end with Lind development street. 69 Bike/ped easement for connection to the east of the site is shown. Is this project escrowing funds to build future b/p connection? Department: Zoning Issue Contact: Gary Lopez Topic: zoning 3 General notes indicates max. building height of 2.5 stories. We'd prefer to see foot dimensions as one story per LUC 3.8.7 (13)(3) could mean as much as 25'. Expectations and consistency require max. height be measured in feet. Based on elevation samples, maybe 30' max. for single family be stated instead. 4 Any proposal for 2 story detached garages? If so no single family detached unit can be created from them. 5 Landscaping note excluding parkway areas from CO/CO issuance not acceptable. Those areas must be secured prior to release of CO. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, TED SHEPARD City Planner Page 7 Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals on a contrasting background. ( Bronze numerals on brown brick are not acceptable). 97 UFC 901.4.4 60 Water Supply: No residential building can be greater then 400 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 800 feet along an approved roadway. Each hydrant must be capable of delivering 1000 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2 NOTE: Current proposed hydrant locations will meet PFA requirements. 61 Street Names: Street names shall be verified and reviewed in accordance with Larimer County Urban Area Street Standards prior to being put in service. Department: Transportation Planning Issue Contact: Mark Jackson Topic: General 62 Development phasing lines on site plan make it very difficult to view sidewalk and trail connections, dimensions. 63 Where trail combines with sidewalk system, minimum width is 8'. Can combined sidewalk/trail be 10' to match trail width? Note: 1-100 scale makes it very difficult to measure sidewalk and trail widths. 64 Show appropriate crosswalk marking on Collector -arterial intersections and near neighborhood center & neighborhood park. See redline comments. 65 Street 5 is labeled as a residentail local street on its sothern end of the development. This street is a collector on the Master Street Plan. 66 Where does the trail go or connect to at the southeastern end of the development? 67 Would like to see a site plan that clearly shows bike lane and crosswalk markings, bike lane, trail and sidewalk widths. Would like to see a detail of the grade - separated trail crossing of CR-52 (to be built as part of this project coordinated with Lind development). Page 6 I 89/130 Install RCP pipe at east end of street C to accomidate storm water flows 42 97/130 Show existing facilites and how existing streets and drives will connect with new construction, may need profile of each 43 98/130 Provide cross section of private drive from Cty Rd 11 to Cty Rd 52 including New Cty Rd 11 construction 44 Provide details and cross section of Baker Irrigation Laterial adjacent to Cty Rd 11 45 99/130 sidewalks need to align with each other and ramps Topic: street utility x-sections plan 46 104/130 Show typical percent slope on x-sections 47 Appears several off -site slope and construction easements are needed 48 112/130 Need to construct a minimum of 36 foot pavement section for Country Club Road Note on plans to be bulit by others 49 115/130 Off -site easements Show irrigation laterial in street intersection x-sections, show 2 foot flat area behind back of sidewalk, Did you calculate public water storm flows in drainge report to accomidate slope from street to swale? Topic: water utility plan 31 33/130 Note refers to sanitary sewer, this is water plan sheet 32 35/130 Provide a typical water line lowering deatil for each size of pipe, including thurst blocking, tie backs, fittings and etc. Department: PFA Topic: General 59 Issue Contact: Michael Chavez Page 5 21 Why vacate portions of existing County Club Road? Just Vacate the whole thing and rededicate with this plat. County Club will not be vacated until after approval of this project Topic: sanitary sewer utility plan 33 36/130 May need more seperation with storm sewqer, work with Boxelder and City Storm Water Utility Topic: storm sewer utility plan 34 56/130 bury depth of pipe is not sufficent LCUASS 12.2.2 (typical comment where it may apply) 35 59,60,66,67,689,70/130 LCUASS 12.2.2 53 23/130 provide x-section of berm between ponds Topic: Street Names 2 Include street names on plat with next submital Topic: street utility plan 36 71/130 need to identify where curb cuts will be on Collector Street with vertical C&G. If bulder installs at later date they will be subject to permit fees and penalittes for cutting new street (typical comment where needed) 37 77/130 General typical comment where it applys. Move curve data/data and elevations from each other so information is readable 38 79/130 Clarify with detail information being provided 39 81/130 Can't read information provided 40 87/130 refer to LCUASS 8.2.4 and figure 8.17 as street intersections connect to Arterial Street system 41 Page 4 23 Need to install pipe alomg drainage ara along Cty Rd 52 with this project. Work out repay/prepay with Lind. If this project and Lind are not built together it will be difficult for Lind to install 24 Where are cross sections are shown as detail, identify where the detail applies 25 Need off -site easement for southen pipe into number 8 ditch 26 sheet 18 /130 better identify deal percent slope in pond, appears steep Topic: plat 13 Add statement about any existing easements to be vacated with this plat (if Needed) 14 Is there a provate street with this project? If not remove note 15 Title needs to be Maple Hill being a replat of Nineteenth Green Planed Unit Development 16 Need to look at Tract statements as it relates to future building sites. Not sure you want to dedicate all of tracts as easements 17 dedicate typical 15 public easement adjacent to County Rd 11 and 52 18 show any existing easements that will stay from old plat 19 Is eastern boundary line the same as ditch easement line if so label, also show eastern most easement line of number 8 ditch 20 See sheet 4/7 for comments about buldings in tracts shown as easements Page 3 52 All streets need to align with Lind property as shown on their PDP submital 54 Site phasing plan will be determined by City Storm Water and Engineering Department needs, ie turn arounds, detention facilites and etc. 55 For Engineering this is a good set of plans, mostly detail stuff to work out. Keith, Good Job! Topic: General, Cty Rd 52 56 Cty Rd 52 cover sheet only add notes as appropriate for this job, otherwise use statement to the effect that all general notes as stated in LCUASS Appendix E apply 57 CS 130, indicate section lines for CTY Rds 11 and 52 58 CS 260 remove proposed from plans at under pass this facility will be built with this project. Make sure Gradding on Maple Hill Plans match what you are proposing work with Keith at TST Engineering Topic: Overall utility plan 27 sheet 26/130 detail too small can not read see LCUASS Apendex E- 6 scannibility 28 27/130 PFA wouls like some hydrants on eastside of Cty Rd 11 at intersections 29 General comment, refer to detail sheet and number for casing and waterline lowerings 30 Extend proposed utility services to property line or onto adjacent properties with associated easements Topic: Overlot Grading 22 Need off -site easement for pipe at number 8 ditch Page 2 STAFF PROJECT REVIEW City of Fort Collins VF RIPLEY Date: January 10, 2003 LOUISE HERBERT 401 W. MOUNTAIN AVE. #201 FT. COLLINS, CO 80521 Staff has reviewed your submittal for MAPLE HILL PDP - TYPE I (LUC) #29-OOA, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Ginger Dodge. Topic: Street Names 1 A list of proposed street names must be submitted for review and entry in the Larimer County Street Inventory System. Department: Engineering Issue Contact: Dave Stringer Topic: detail sheet 50 124/130 Where is service disconnect detail being used? Provide water deflection detail 51 125/130 clen up details as redlined Topic: General 7 Provide Plan and profile of Baker irrigation Laterial. Need to see this pipe as it crosses roadways 8 Baker laterial can not be in a public easement. It most be in private easement 9 Baker laterial owners need to sign utility plans and plat 10 need signatures of Larimer County on utility plans 11 refer to LCUASS Apendix E-6 for quality of plans for scanability 12 see comments for general notes sheet 2/130 Page 1