Loading...
HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - CORRESPONDENCE - LEGAL COMMUNICATIONTIMOTHY J. DOW, MBA, JD PATRICIA T. DOW, CPA, JD, LLM* MAYO SOMMERMEYER, PC** OF COUNSEL • ALSO ADMITTED TO PRACTICE LAW M NEBRASKA ••ALSO ADMITTED TO PRACTICE LAW M W YOMMG THE Dow LAw FIRM, LLC ATTORNEYS AND COUNSELORS AT LAW P.O. BOX 1578 FORT COLLMS, COLORADO 80522-1578 (970) 498-9900 Via Hand Delivery Ted Shepard City of Fort Collins Current Planning 281 N. College Ave. Fort Collins, CO 80524 FAX: (970) 498-9966 E-MAIL: dow@dowlawfim.com January 27, 2003 Re: Project #29-OOA Maple Hill PDP — Type I (LUC) Our Client: Windsor Reservoir & Canal Company Dear Mr. Shepard: N 7 CLOCK TOWER SQUARE 323 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO 80524 2312 CAREY AVENUE D M �RT63T 41 JA N 2 8 2003 D The Windsor Reservoir & Canal Company (WRCC) is the owner of the ditch that generally runs along the easterly boundary of the referenced project, sometimes known as the No. 8 Outfall. On behalf of WRCC, I have reviewed the submission as submitted by you with your Comment Sheet dated January 15, 2003. The drawings and data submitted did not address the stormwater issues of importance to our client. I was able to work directly with the engineer and obtain the appropriate drawings and other technical information needed such as the sub - basin information. I would like to complement Keith Sheaffer and his team at TST, Inc. Consulting Engineers for an excellent job in providing the information that we need to make a comfortable decision concerning the impact of development on our ditch. If all developers and their engineers were willing to work as closely as these people have with us, the end product would be much better, well-defined and more certain, and everyone's comfort level would be significantly enhanced! I have reviewed drawings 69 of 130 and 56 of 130 on Job #953-003, revision date 11/18/02. I have also reviewed drawings 3-7 of 7 on the same project with the same revision date. Detailed design and full analysis data was also submitted, particular attention is directed to the NeoUDS results summary project description: ST-1, being page 1 of 3 — sub -basin information. The sub -basin information peak flow shows that 10 cfs will burden the ditch. WRCC hereby approves the drawings as referenced above as to their design and general configuration as it impacts our ditch. We also approve and agree to accept a stormwater developed inflow of 10 cfs into the ditch as referenced above. r This arrangement will need to be reduced to a formal agreement reflecting a few details concerning timing of the project, coordination with the ditch company and the consideration to be paid by the developer at a later date. From a planning standpoint, if you have any questions or concerns, please do not hesitate to get ahold of me. MS/hb PC: Tom Dougherty Keith Sheaffer Donn Engel Yours very truly, MAYO SOMME EYER, P.C. 1l�Iayo Som perm yer