Loading...
HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - SUBMITTAL DOCUMENTS - ROUND 1 - VARIANCE REQUESTY January 28, 2003 Mr. Dave Stringer City of Fort Collins Engineering Department 281 N. College Ave. PO Box 580 Fort Collins, CO 80522-0580 Re: Maple Hill Storm Sewer cover variance request Project No.: 0953-003 Dear Dave, This letter is regarding the Maple Hill storm sewer minimum cover variance request. Due to site constraints associated with the existing Larimer/Weld No.8 irrigation outlet elevation, the proposed 100-year discharge and existing topographic elevations for the development, the proposed Maple Hill project has one area of storm sewer that does not meet the minimum cover criteria of the LCUASS manual. Storm sewer line ST5 and 5B (intersection of Maple Hill Drive and Thoreau Drive) have between. 1.00-1.88 feet of cover, instead of the recommended 2.0 feet as stated in Section 12.2.2 of the LCUASS manual, this is a 0.12-1.00-foot difference. Per our conversation with you on January 8, 2003, it was stated that the installation of a stabilization fabric (geo fabric), per the City of Fort Collins Construction Standards, would be supported and approved by the City of Fort Collins Engineering Department. This stabilization fabric will be installed within the intersection of Maple Hill Drive and Thoreau Drive to mitigate vibration degrigation of the street base course and asphalt. The stabilization fabric will be installed by the developer and will not result in any additional capital or maintenance costs to the city. The installed fabric will not create any safety, welfare or public health issues, nor will it reduce the design life of the public streets. The allowance of the variance will create a better design of all storm sewer and drainage facilities, resulting in reduced negative affects created by storm generated runoff. We appreciate you review and approval of said variance. If you have any questions or concerns, please feel free to give our office a call. t— x KGS/sjk TST, INC. 748 Whalers Way - Building D Consulting Engineers Fort Collins, CO 80525. (970) 226.0557 Metro (303) 595-9103 Fax (970) 226-0204 Email into@tstine.com www.tstinc.com