Loading...
HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - CORRESPONDENCE - REVISIONSThe service disconnect detail has been removed. The water line deflection detail has been provided, see sheet 124. 51 125/130 clean up details as redlined. All detail sheets have been "cleaned up" per the redline comments, see sheet 125. Topic: General 7 Provide Plan and profile of Baker irrigation Lateral. Need to see this pipe as it crosses roadways. Plan and Profiles of the Baker Lateral have been provided on sheets 70A and 70B. 8 Baker lateral cannot be in a public easement. It must be in private easement. The Baker lateral has been placed in a private easement please see the plat and sheets 70A-B. 9 Baker lateral owners need to sign utility plans and plat. Signature blocks for the Baker Lateral owner's have been provided on Sheet 1 of the Utility Plans and Sheet 1 of the plat. 10 need signatures of Larimer County on utility plans. The Larimer County signature block has been provided on Sheet 1 of the Utility Plans. 11 Refer to LCUASS Appendix E-6 for quality of plans for scan ability. Acknowledged and provided, see all sheets. 12 See comments for general notes sheet 2/130. TST, Inc. has contacted Mr. Dave Stringer and he stated that our notes match the October LCUASS manual and are the most current. All other redlines on the note sheet have been updated. See sheet 2. Page 2 Maple Hill Street Names: Collector Streets: Maple Hill Drive — new name Thoreau Drive — new name Forcastle Drive — existing street name Country Club Road — existing street name Barharbor — existing street name Residential Streets: Ashland Lane Ballard Lane Cambria Lane Clarion Lane Clearfield Lane Marshfield Lane Muir Lane Milton Lane Somerset Lane Sunbury Lane Waterbury Lane End of comments. TST, Inc. will provide all of the redlined utility plans to the respective utility jurisdictions. Due to the minimal comments from the City of Fort Collins, ELCO and Boxelder, and TST, Inc. ability to adequately revised and respond to said comments. TST, Inc. is requesting to submit mylars for jurisdictional signatures and approval. TST, Inc. is more than willing to work with each department to make this happen. If you have any questions or concerns, please feel free to contact me immediately so that we can promptly respond. Thank you for your consideration. We look forward to working with you further during the development review process. Yours Sincerely, Louise Herbert VF Ripley Associates Iherbert@vfavfr.com Keith G. Sheaffer, PE 226.0557 (P) 226.0204 (F) 218.9520 (C) ksheaffer@tstinc.com Page 13 Department: Zoning Issue Contact: Gary Lopez Topic: zoning 3 General notes indicate max. building height of 2.5 stories. We'd prefer to see foot dimensions as one story per LUC 3.8.7 (13)(3) could mean as much as 25'. Expectations and consistency require max. height be measured in feet. Based on elevation samples, maybe 30' max. for single family be stated instead. Building height dimensions have been revised and numbers rounded. This was discussed and agreed with Gary Lopez on 01/17/03 4 Any proposal for 2 story detached garages? If so no single family detached unit can be created from them. No. Acknowledged. 5 Landscaping note excluding parkway areas from CO/CO issuance not acceptable. Those areas must be secured prior to release of CO. Acknowledged. The landscape note #9 under plant notes has been removed from the Landscape Plan. This item will be addressed at Final Compliance. Department: Forestry Issue Contact: Tim Buchanan (Separate letter — see attached) 1 The Landscape Plan needs to show all the actual street tree locations along all of the streets. Current Planning has checked this item with Forestry and it has been verbally confirmed to VF Ripley Associates that this can be addressed at Final Compliance. Items 2 to 4. Landscape notes. These have been revised and added to the Landscape Plan. 5 Street trees species. Street tree species have been revised in accordance with the redlines and current City of Fort Collins Street Tree list (August 2002). Page 12 64 Show appropriate crosswalk marking on Collector -arterial intersections and near neighborhood center & neighborhood park. See redline comments. Acknowledged. These are shown on the Site and Landscape Plans. See also TST Engineer's striping plan. 65 Street 5 is labeled as a residential local street on its southern end of the development. This street is a collector on the Master Street Plan. Acknowledged. This has been corrected. 66 Where does the trail go or connect to at the southeastern end of the development? The Public Trial will connect to the Poudre School District site to the south in accordance with the Mountain Vista Subarea Plan. 67 Would like to see a site plan that clearly shows bike lane and crosswalk markings, bike lane, trail and sidewalk widths. Would like to see a detail of the grade - separated trail crossing of CR-52 (to be built as part of this project coordinated with Lind development). Please see TST Engineer's striping plan for crosswalk and bike lane width dimensions. Please see VF Ripley's drawing titled " Access and Public Trial Detail Areas" for trail and sidewalk widths. Sear Brown will provide plans and details on the grade -separated trail crossing of CR-52. 68 Street 1 needs to align on northern end with Lind development street. This has been revised and is aligned. 69 Bike/ped easement for connection to the east of the site is shown. Is this project escrowing funds to build future b/p connection? The applicant will ecrow funds for this future connection. Page 11 Department: PFA Topic: General Issue Contact: Michael Chavez 59 Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 97 UFC 901.4.4 Acknowledged. 60 Water Supply: No residential building can be greater then 400 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 800 feet along an approved roadway. Each hydrant must be capable of delivering 1000 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2 NOTE: Current proposed hydrant locations will meet PFA requirements. Acknowledged. 61 Street Names: Street names shall be verified and reviewed in accordance with Larimer County Urban Area Street Standards prior to being put in service. Acknowledged. Department: Transportation Planning Issue Contact: Mark Jackson Topic: General 62 Development phasing lines on site plan make it very difficult to view sidewalk and trail connections, dimensions. An additional drawing titled "Access and Public Trail Detail Areas" by VF Ripley Associates has been provided which illustrates specific sections of the trail as discussed with Transportation Planning. 63 Where trail combines with sidewalk system, minimum width is 8'. Can combined sidewalk/trail be 10' to match trail width? Note: 1-100 scale makes it very difficult to measure sidewalk and trail widths. The majority of the trail is 10 feet wide. Please see attached Public Trail narrative. Again, a detail sheet as identified in item 62 above has been provided for clarification. Page 10 Topic: street utility x-sections plan 46 104/130 Show typical percent slope on x-sections. Acknowledged and provided, see sheet 104. 47 Appears several off -site slope and construction easements are needed. Acknowledged, all off -site easements were provided in the previous submittal and will be re -submitted with this submittal. If any department would like copies of the applicable easements and exhibits please give me a call and I will provide the requested copies (226.0557). 48 112/130 Need to construct a minimum of 36-foot pavement section for Country Club Road Note on plans to be built by others. Acknowledged and provide. 49 115/130 Off -site easements Show irrigation lateral in street intersection x-sections, show 2 foot flat area behind back of sidewalk, Did you calculate public water storm flows in drainage report to accommodate slope from street to swale? TST, Inc. is showing the new location, see Baker Lateral plan and profile (sheets 70A and B), the existing pipe will be removed and placed out of the proposed ROW per your request. TST, Inc. has accounted for all storm water runoff for both on -site and off -site contributions. Topic: water utility plan 31 33/130 Note refers to sanitary sewer, this is water plan sheet. All notes have been updated for their respective sheets. Sewer notes on sewer sheets, etc., the overall utility has notes for water, storm and sanitary sewer. 32 35/130 Provide a typical water line lowering detail for each size of pipe, including thrust blocking, tiebacks, fittings and etc. Acknowledged, detail has been provided on sheet 124. Page 9 39 81/130 Can't read information provided. Acknowledged and revised. 40 87/130 refer to LCUASS 8.2.4 and figure 8.17 as street intersections connect to Arterial Street system. The slopes in question are NOT in the intersections and only within the PCR's (curb returns) of the curb and gutter. These slopes will not adversely effect the drive ability of the road, nor create monetary costs in maintenance or repairs. 41 89/130 Install RCP pipe at east end of street C to accommodate storm water flows. Curb and gutter has been extended to these swales, the flows will be intercepted and conveyed by the gutter section to inlets, therefore, no additional conveyance system is needed. 42 97/130 Show existing facilities and how existing streets and drives will connect with new construction, may need profile of each. Facilities have been shown and existing tie-ins have been provided on the grading plans for CR 11. 43 98/130 Provide cross section of private drive from Cty Rd 11 to Cty Rd 52 including New Cty Rd 11 construction. Acknowledged, and have been provided on the cross-section detail, see detail sheets. 44 Provide details and cross section of Baker Irrigation Lateral adjacent to Cty Rd 11. Baker Lateral has been plan and profiled, see sheets 70A and 70B. 45 99/130 sidewalks need to align with each other and ramps. Acknowledged and provided. Page 8 All storm sewer has been revised and all lines except ST-5 and 5B have the minimum cover. ST-5 and 5B cover issues have been worked out with Mr. Basil Hamden and Mr. Dave Stringer. TST, Inc. has provided a variance request with this submittal identifying the issue and resolution approved by both City departments. 35 59,60,66,67,689,70/130 LCUASS 12.2.2. Acknowledged and revised. See previous comment. 53 23/130 provide x-section of berm between ponds. Cross-section has been provided with this storm sewer plan and profile, see sheet 69 (ST-6). Also, note has been provided on the overall utility plan. Topic: Street Names 2 Include street names on plat with next submittal. r- - Acknowledged and provided. See item 1 under Current Planning. Topic: street utility plan 36 71/130 need to identify where curb cuts will be on Collector Street with vertical C&G. If builder installs at later date they will be subject to permit fees and penalties for cutting new street (typical comment where needed). Acknowledged and provided on all applicable street sheets. 37 77/130 General typical comment where it applies. Move cure data/data and elevations from each other so information is readable. Acknowledged and revised, see applicable street sheets. 38 79/130 Clarify with detail information being provided. Typical street cross-section has been provided on each street sheet. Page 7 17 dedicate typical 15 public easement adjacent to County Rd 11 and 52. Acknowledged and has been provided. 18 show any existing easements that will stay from old plat. Acknowledged and has been provided. 19 Is eastern boundary line the same as ditch easement line if so label, also show. eastern most easement line of number 8 ditch. Acknowledged, and TST, Inc. has labeled all non -congruent sections of the Maple Hill boundary and the No. 8 ditch. Due to the fact that the No. 8 ditch property is fee simple, TST, Inc. has not shown the eastern boundary due it being off -site. 20 See sheet 4/7 for comments about buildings in tracts shown as easements. Acknowledged and revised. 21 Why vacate portions of existing County Club Road? Just vacate the whole thing and rededicate with this plat. County Club will not be vacated until after approval of this project. Acknowledged, see plat, sheets 1-7. Topic: sanitary sewer utility plan 33 36/130 May need more separation with storm sewer, work with Boxelder and City Storm Water Utility. Acknowledged, TST, Inc. has coordinated with all jurisdictions and utility separation has been approved by each. Topic: storm sewer utility plan 34 56/130 bury depth of pipe is not sufficient LCUASS 12.2.2 (typical comment where it may apply). Page 6 Acknowledged, and TST, Inc. has worked out all issues with Mr. Basil Hamden, Stormwater Utilities for construction plans and language. 24 Where are cross -sections are shown as detail, identify where the detail applies. TST, Inc. is putting all applicable cross -sections on each street plan and profile sheet for better clarification. 25 Need off -site easement for southern pipe into number 8 ditch. Acknowledged, all off -site easements were provided in the previous submittal and will be re -submitted with this submittal. If any department would like copies of the applicable easements and exhibits please give me a call and I will provide the requested copies (226.0557). 26 sheet 18 /130 better identify deal percent slope in pond, appears steep. Acknowledged, TST, Inc. will provide, see sheet 18. Topic: Plat 13 Add statement about any existing easements to be vacated with this plat (if Needed). Acknowledged, and has been provided on the plat, see sheets 1-7 of plat. 14 Is there a private street with this project? If not remove note. Acknowledged, no private streets and note has been removed. 15 Title needs to be Maple Hill being a replat of Nineteenth Green Planed Unit Development. Acknowledged and has been done. 16 Need to look at Tract statements as it relates to future building sites. Not sure you want to dedicate all of tracts as easements. Acknowledged. Page 5 Topic: Overall utility plan 27 sheet 26/130 detail too small cannot read see LCUASS Appendix E- 6 scan ability. Acknowledged, please see sheets 1-130. 28 27/130 PFA would like some hydrants on eastside of Cty Rd 11 at intersections. TST, Inc. has meet with Mr. Ron Gonzales, PFA, and Ron stated that we had to provide additional fire hydrants on median side of the new CR11, TST, Inc. has provided all of the required hydrants, see overall utility plan. 29 General comment, refer to detail sheet and number for casing and waterline lowerings. TST, Inc. has provided a water line lowering/casing detail see sheet 124. 30 Extend proposed utility services to property line or onto adjacent properties with associated easements. Acknowledged, see overall utility plan and applicable sanitary, storm and street plan and profile sheets. Topic: Overlot Grading 22 Need off -site easement for pipe at number 8 ditch. Acknowledged, all off -site easements were provided in the previous submittal and will be re -submitted with this submittal. If any department would like copies of the applicable easements and exhibits please give me a call and I will provide the requested copies (226.0557). 23 Need to install pipe along drainage area along Cty Rd 52 with this project. Work out repay/prepay with Lind. If this project and Lind are not built together it will be difficult for Lind to install. Page 4 52 All streets need to align with Lind property as shown on their PDP submittal. Acknowledged, streets align with the Lind Property. See sheets Utility plans. 54 Site phasing plan will be determined by City Storm Water and Engineering Department needs, i.e. turn arounds, detention facilities and etc. Acknowledged. TST, Inc. has been coordinating with the different utility divisions and has revised the phasing plans per their applicable comments. See sheets 24- 25. 55 For Engineering this is a good set of plans, mostly detail stuff to work out. Keith, Good Job! Thank you, our team appreciates your acknowledgement of the work we have done on this project. Topic: General, Cty Rd 52 56 Cty Rd 52 cover sheet only add notes as appropriate for this job, otherwise use statement to the effect that all general notes as stated in LCUASS Appendix E apply. Sear Brown will provide an updated revised plan set with the applicable revisions. 57 CS 130 , indicate section lines for CTY Rds 11 and 52. Sear Brown will provide an updated revised plan set with the applicable revisions. 58 CS 260 remove proposed from plans at under pass this facility will be built with this project. Make sure Grading on Maple Hill Plans match what you are proposing work with Keith at TST Engineering. Sear Brown will provide an updated revised plan set with the applicable revisions. TST, Inc. has coordinated with Sear Brown to match the information provided by Sear Brown. Page 3 STAFF PROJECT REVIEW City of Fort Collins February 4, 2003 Response to Staff comments dated 01/10/03. We have reviewed the Staff comments and have following comments: Ted Shepard — Current Planning Ginger Dodge — Current Planning Dave Stringer — Engineering Michael Chavez — PFA Mark Jackson — Transportation Planning Gary Lopez — Zoning Tim Buchanan - Forestry VF RIPLEY LOUISE HERBERT 401 W. MOUNTAIN AVE. #201 FT. COLLINS, CO 80521 ISSUES: Department: Current Planning Topic: Street Names Date: January 10, 2003 Issue Contact: Ginger Dodge 1 A list of proposed street names must be submitted for review and entry in the Larimer County Street Inventory System. A list of proposed Street Names is attached. The list has been submitted and street names checked and reserved with Current Planning. All proposed names are shown on the Site and Landscape Plans. TST, Inc. has provided the proposed street names on all "Utility Plans for Maple Hill" see sheets 1-130. Department: Engineering Topic: detail sheet Issue Contact: Dave Stringer 50 124/130 Where is service disconnect detail being used? Provide water deflection detail. Page 1 CX9,4e( f- 0 (/NO /LESIs0AIM 7p ! J*TRouNO GGM M £NTd