Loading...
HomeMy WebLinkAboutFORT COLLINS HIGH SCHOOL, WIRELESS TELECOMMUNICATIONS EQUIP. (CRICKET) - PDP/FDP - 11-97I - CORRESPONDENCE -Redlines must be returned with the re -submittal. One full-size copy and one 8.5 x 11 set of PDP plans will be sufficient for the re -submittal of this project.. Contact Voneen Macklin or Ginger Dodge to set up an appointment to re -submit. Please re -submit by June 20, 2001 to make the July 19th Planning and Zoning Board meeting. A PowerPoint slide presentation is typically prepared for each project that goes to Planning and Zoning Board, even those projects likely to be on the consent agenda. Is it possible to provide the photo -simulations in PowerPoint? We would also like to have the site plan in PowerPoint if possible. The slides must be submitted to Ginger Dodge by July 11, 2001. Thank you for your cooperation. If you have further questions, please don't hesitate to call me at 970.416.2138 or via email at bgrubb(a)fcgov.com. Sincerely, Brian Grubb, AICP City Planner Commi.. y Planning and Environmental rvices Current Planning City of Fort Collins June 8, 2001 Cricket Communications c/o Drew Dewhirst 6855 South Havana Street Englewood, Colorado 80112 Subject: Development Review Team Comments Fort Collins High School Wireless Telecommunications Equipment File # 11-971 Dear Mr. Dewhirst: The Development Review Team has completed its review of the above - mentioned project and offers the following comments: CURRENT PLANNING (Redlines Attached) 1. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by September 6, 2001. A 30-day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. 2. See the attached redlines for information and format revisions. We would like to see the number of sheets reduced and a more comprehensive and consolidated site plan. The site plan should show the property boundary; footprint of existing structures; outline of driveways and parking areas; edge of public streets; streets, lot lines and zoning of adjacent development; existing utilities and utility easements and landscaping. LIGHT AND POWER 3. If power for the new facility is coming from an existing meter and if the main panel is not being increased then we have no comment. If a new meter or panel change is required, contact Light and Power as soon as possible. BUILDING INSPECTION 4. See attached written comments. 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020