Loading...
HomeMy WebLinkAboutBELLA VISTA - PDP - 45-01A - CORRESPONDENCE -Project: U-z-.L, Planner: E Engineer: c- Ittmt Requested Site I land Plat I Ely I Drainage R t Other Items Rt uired Redlined Items Being Returned Site land I Plat Utility Drainage R t I Other lamsBeing Returned . = Engineering Stormwater Water/Wattewate x Traff(Operationt rrant. Planning iramOrt Natural Bennet Park Planning m Department: Water Wastewater Issue Contact: Jeff Hill TOPIC: Utility plans Number: 94 Created: 2/22/2002 Repeat comment 3/16/03: Water mains may not be joint deflected to a depth of 8 feet. Use fittings to lower the proposed 8-inch water main in East Horsetooth Road. Provide all information necessary for the lowering. Now that the storm sewer and water main have been raised to the bury depth of 6.5 feet, joint deflection is the preferred method of lowering. If a fitting lowering is still to be used then provide a complete detail of the lowering. It is unclear whether joint deflection is being used at this crossing. It was our understanding that the storm sewer would be raised eliminating the need for lowering the water main, but the profile looks the same as last round of review. Please clarify This item has been scheduled for an administrative public hearing on the evening of Thursday, April 10, 2003, in the City Council chambers. The hearing will begin promptly at 5:30 p.m. and the Bella Vista PUP is second on the agenda (following the Maple Hill PDP). Please submit to the City the number of copies of all documents as shown on the attached Revision Routing Sheet as soon as possible. Be sure and return all of the red - lined plans when you submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yours Truly, eil Steve Olt City Planner Page 3 j Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: Drainage Reports Number: 180 Created: 3/17/2003 Please provide three signed and stamped copies of the drainage report, including plans in the back for approval. Topic: Easements Number: 165 Created: 11/20/2002 Please provide a copy of the drainage easement on the Aspen Leaf Apartments property for our records, if this easement has been secures. The easement will be needed prior to approval of final plans. Topic: Utility plans Number: 179 Created: 3/17/2003 Please add detail of storm/sanitary sewer crossing on storm line G. Provide as much clearance as possible. Department: Transportation Planning Issue Contact: Tom Reiff Topic: General Number: 176 Created: 3/12/2003 Follow - Up Comment to # 170 (3-12-03) Concerns have arisen from Engineering regarding the potential for blind pedestrians to wonder out onto the bike path and East Horsetooth Road. Please make the following corrections to address this issue: 1. Instead of having the bike path continue directly in line with the access ramp and the crosswalk, swing the path northward to intersect with the sidewalk at or near 90 degrees (see red lines). Then the area vacated by the path can be used to clearly mark the sidewalk and bike path with landscaping (see red lines). This will also require the proposed raised planter to shift eastward. 2. Please remove the walkway connection to the bike path from the building's main south entrance to physically separate the bike path and sidewalk. 3. It is important that the concrete pour where the on street bike lane transitions to the off street path be constructed flush with NO lip or seam that may cause a cyclists to lose balance or control of their bike. See red lines for additional comments.. Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility plans Number: 178 Created: 3/16/2003 Sheet 15: How much clearance is between the storm and sanitary (outside of pipe to outside of pipe)? Can storm be raised? May need detail showing method of protecting the sanitary depending on the clearance. Page 2 1` 6 a STAFF PROJECT REVIEW City of Fort Collins Stanford Development, LLC Date: 3/25/2003 c/o Cityscape Urban Design - Eldon Ward 3555 Stanford Road, Suite 105 Fort Collins, CO.80525 Staff has reviewed your submittal for BELLA VISTA PUP, TYPE I (LUC), and we offer the following comments: ISSUES: Department: Engineering Topic: Genera/ Issue Contact: Marc Virata Number: 158 Created: 11/19/2002 Coordinate the name of the project, is it "Bellavista PDP" or "Bella Vista PDP" or "Bellavista PDP"? Ensure that the title is consistent on all documents. [1/15] "Bella Vista" is still shown on the site/PDP plans. [2/20] repeat comment (site/landscape plans differ from utility/plat). Number: 181 Created: 3/21/2003 The letter of intent was received and is acceptable. Copies of the actual signed easement, (recorded at the county with reception numbers) is required prior to the submittal of mylars. Please indicate the reception number(s) for the easement on the plat. Also, please remove the City Acceptance provision from the document, as it is a private easement agreement between two parties outside of the City. Topic: Street Design Number: 71 Created: 2/18/2002 Three variance requests were received regarding Bella Vista from Northern Engineering. The variance requesting the reduction in sight distance along Stanford Drive, the variance to reduce the driveway spacing from 660' to 610', and the variance to reduce the utility easement along East Horsetooth Road were all viewed favorably upon by the City Engineer. Final approval of these variance requests will occur with completion of the designs for Horsetooth Road and Stanford Road that are acceptable to the City and the utilities. [2/27] The three variance requests were approved by the City Engineer and can be indicated as such on General Note #58. No additional notice or follow up will be made, unless requested. Page 1