HomeMy WebLinkAboutBELLA VISTA - PDP - 45-01A - CORRESPONDENCE -Project: U-z-.L,
Planner: E
Engineer: c-
Ittmt Requested
Site I land Plat I Ely I Drainage R t Other Items Rt uired
Redlined Items Being Returned
Site land I Plat Utility Drainage R t I Other lamsBeing Returned . =
Engineering
Stormwater
Water/Wattewate
x
Traff(Operationt
rrant. Planning
iramOrt
Natural Bennet
Park Planning
m
Department: Water Wastewater Issue Contact: Jeff Hill
TOPIC: Utility plans
Number: 94 Created: 2/22/2002
Repeat comment 3/16/03: Water mains may not be joint deflected to a depth of 8
feet. Use fittings to lower the proposed 8-inch water main in East Horsetooth Road.
Provide all information necessary for the lowering. Now that the storm sewer and
water main have been raised to the bury depth of 6.5 feet, joint deflection is the
preferred method of lowering. If a fitting lowering is still to be used then provide a
complete detail of the lowering. It is unclear whether joint deflection is being used at
this crossing. It was our understanding that the storm sewer would be raised
eliminating the need for lowering the water main, but the profile looks the same as last
round of review. Please clarify
This item has been scheduled for an administrative public hearing on the evening of
Thursday, April 10, 2003, in the City Council chambers. The hearing will begin
promptly at 5:30 p.m. and the Bella Vista PUP is second on the agenda (following the
Maple Hill PDP).
Please submit to the City the number of copies of all documents as shown on the
attached Revision Routing Sheet as soon as possible. Be sure and return all of the red -
lined plans when you submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970)221-6341.
Yours Truly,
eil
Steve Olt
City Planner
Page 3
j
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Drainage Reports
Number: 180 Created: 3/17/2003
Please provide three signed and stamped copies of the drainage report, including plans
in the back for approval.
Topic: Easements
Number: 165 Created: 11/20/2002
Please provide a copy of the drainage easement on the Aspen Leaf Apartments
property for our records, if this easement has been secures. The easement will be
needed prior to approval of final plans.
Topic: Utility plans
Number: 179 Created: 3/17/2003
Please add detail of storm/sanitary sewer crossing on storm line G. Provide as much
clearance as possible.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 176 Created: 3/12/2003
Follow - Up Comment to # 170 (3-12-03) Concerns have arisen from Engineering
regarding the potential for blind pedestrians to wonder out onto the bike path and East
Horsetooth Road. Please make the following corrections to address this issue: 1.
Instead of having the bike path continue directly in line with the access ramp and the
crosswalk, swing the path northward to intersect with the sidewalk at or near 90
degrees (see red lines). Then the area vacated by the path can be used to clearly mark
the sidewalk and bike path with landscaping (see red lines). This will also require the
proposed raised planter to shift eastward. 2. Please remove the walkway connection to
the bike path from the building's main south entrance to physically separate the bike
path and sidewalk. 3. It is important that the concrete pour where the on street bike
lane transitions to the off street path be constructed flush with NO lip or seam that
may cause a cyclists to lose balance or control of their bike. See red lines for
additional comments..
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: Utility plans
Number: 178 Created: 3/16/2003
Sheet 15: How much clearance is between the storm and sanitary (outside of pipe to
outside of pipe)? Can storm be raised? May need detail showing method of protecting
the sanitary depending on the clearance.
Page 2
1`
6
a STAFF PROJECT REVIEW
City of Fort Collins
Stanford Development, LLC Date: 3/25/2003
c/o Cityscape Urban Design - Eldon Ward
3555 Stanford Road, Suite 105
Fort Collins, CO.80525
Staff has reviewed your submittal for BELLA VISTA PUP, TYPE I (LUC), and we offer
the following comments:
ISSUES:
Department: Engineering
Topic: Genera/
Issue Contact: Marc Virata
Number: 158 Created: 11/19/2002
Coordinate the name of the project, is it "Bellavista PDP" or "Bella Vista PDP" or
"Bellavista PDP"? Ensure that the title is consistent on all documents.
[1/15] "Bella Vista" is still shown on the site/PDP plans.
[2/20] repeat comment (site/landscape plans differ from utility/plat).
Number: 181 Created: 3/21/2003
The letter of intent was received and is acceptable. Copies of the actual signed
easement, (recorded at the county with reception numbers) is required prior to the
submittal of mylars. Please indicate the reception number(s) for the easement on the
plat. Also, please remove the City Acceptance provision from the document, as it is a
private easement agreement between two parties outside of the City.
Topic: Street Design
Number: 71 Created: 2/18/2002
Three variance requests were received regarding Bella Vista from Northern
Engineering. The variance requesting the reduction in sight distance along Stanford
Drive, the variance to reduce the driveway spacing from 660' to 610', and the variance
to reduce the utility easement along East Horsetooth Road were all viewed favorably
upon by the City Engineer. Final approval of these variance requests will occur with
completion of the designs for Horsetooth Road and Stanford Road that are acceptable
to the City and the utilities.
[2/27] The three variance requests were approved by the City Engineer and can be
indicated as such on General Note #58. No additional notice or follow up will be made,
unless requested.
Page 1