HomeMy WebLinkAboutBELLA VISTA - PDP - 45-01A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETpV
Project: __-1
Planner: Ste` C�i
Engineer:
TraMc Operations: �- -,c Z—� , ��< <
Date:
Items Requested
Redlined Items Being Returned
Site I [and I Plat Utility I Drainage R t Other Items Required
Site I land Plat I Utili Drainage R t Other Items Being Returned
Stormwater
vz
Water/Wastewate
L
Traffic Operations
-2<
XL
Trans. Planning
x
S.S ILA
Transfort
Natural Resourtti
Park Planning
t
Totals
Other:
Mote: All redlined items should be returned with the resubmittal/ revisions.
-*C� ck� aAe-a�4w"4ice.
Revisions Routin
Item: [#4*- - l l �` f
Date: i,/�
F
PROJECT PLANNEREERING: PAVEMENTGING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCOBOXELDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R-O.W. PLANNING
WATER CONSERVATION '
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE/THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
b
r �
g Sheet
'!4\
Rey. 5-07-97