Loading...
HomeMy WebLinkAboutLEMAY AVENUE CRAFT BREWERY & SELF-STORAGE FACILITY - FDP - FDP160005 - CORRESPONDENCE - REVISIONS (3)Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson()fcgov.com Topic: General Comment Number: 1 Comment Originated: 02/19/2016 02/19/2016: A landscape plan shall contain accurate and identifiable hydrozones, including a water budget chart that shows the total annual water use, which shall not exceed fifteen (15) gallons per square foot over the site. If you have questions contact Eric Olson at eolson@fcgov.com or 970-221-6704. JR Response: Addressed Comment Number: 2 Comment Originated: 02/19/2016 02/19/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson(@fcqov.com JR Response: An Irrigation Plan will be submitted at time of building permit. Department: Water -Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarguecbfcgov.com Topic: General Comment Number: 1 Comment Originated: 02/24/2016 04/06/2016: Please adjust the sewer to be under the pan and centered in the easement. 02/24/2016: Please adjust the sanitary main so the main is centered within the 30 foot utility easement. See redlines. JR Response: Addressed. Comment Number: 2 Comment Originated: 02/24/2016 04/06/2016: The eastern most service needs a label. 02/24/2016: Please add and label all the 4-inch fire services to include a thrust block. JR Response: Addressed. Comment Number: 5 Comment Originated: 02/24/2016 04/06/2016: The waterline crossing near MH 4-2 may need to be lowered to provide more clearance once more information is obtained. 02/24/2016: Please show the water main crossings on the storm sewer profiles. There are two crossings that are unknown if any conflicts exist. JR Response: Addressed. Comment Number: 6 Comment Originated: 04/06/2016 04/06/2016: 10 feet of separation is required between the proposed storm sewer and the existing water main in Buckingham Street. JR Response: Addressed, the storm sewer was moved. Topic: Construction Drawings Comment Number: 11 04/05/2016: There are line over text issues. See redlines. 02/24/2016: There are line over text issues. See redlines. JR Response Addressed. Topic: Lighting Plan Comment Number: 7 04/05/2016: No plans were provided for review. 02/24/2016: No comments. Topic: Plat Comment Originated: 02/24/2016 Comment Originated: 02/24/2016 Comment Number: 13 Comment Originated: 04/05/2016 04/05/2016: Please add standard City language as noted. See redlines. JR Response: Addressed. Comment Number: 14 Comment Originated: 04/05/2016 04/05/2016: Please add new title commitment information as available. JR Response: Updated title order and date. Comment Number: 15 Comment Originated: 04/05/2016 04/05/2016: Please provide current acceptable monument records for the aliquot corners shown. These should be emailed directly to Jeff at 4county(a.fcgov.com JR Response Monument records were delivered Comment Number: 16 Comment Originated: 04/05/2016 04/05/2016: Please change "property" to "record" in the property corner descriptions. See redlines. JR Response: "Property" was removed from property corner descriptions. Comment Number: 17 Comment Originated: 04/05/2016 04/0512016: Please show record & measured bearings 7 distances as marked. See redlines. JR Response: All corners were found and accepted which eliminates the need for "record" and "measured". Topic: Site Plan Comment Number: 4 Comment Originated: 02/24/2016 04/05/2016: Some of the titles in the sheet index do not match the titles on the noted sheets. See redlines. 02/24/2016: Some of the titles in the sheet index do not match the titles on the noted sheets. See redlines. JR Response: Addressed. Department: Traffic Operation Contact: Martina Wilkinson, 970.221.6887, mwilkinson(&fcgov.com Topic: General Comment Number: 1 Comment Originated: 02/24/2016 04/06/2016: Just one minor change remaining. Everything else looks good! 02/24/2016: striping redlines are ready. These need to be re -reviewed prior to mylar. JR Response: Addressed. Comment Number: 8 Comment Originated: 04/01/2016 04/01/2016: No changes on behalf of Light & Power since the February review. If there are questions, please contact Light & Power Engineering if you have any questions at 221-6700. Please reference our policies, development charge processes, and use our fee estimator at http://www. fcgov.com/utilities/business/builders-and-developers. JR Response: Noted. Department: Stormwater Engineering Contact: Mark Taylor, 970-416.2494, mtaylor(a)fcgov.com Topic: Floodplain Comment Number: 12 Comment Originated: 03/30/2016 03/30/2016: Please add notes to the Plat and to the Site Plan, stating that the entire site is within the FEMA-regulatory Poudre River 500-year floodplain, and At -Risk Population and Essential Service Facilities are not allowed. JR Response: Addressed. Contact: Wes Lamarque, 970-416-2418, wlamarque(dUcgov.com Topic: General Comment Number: 5 Comment Originated: 02/24/2016 04/06/2016: Repeat Comment. 02/24/2016: LID sizing calculations are required in the drainage report to verify that the bio-swales and the bio-retention ponds are sized correctly for the area draining to them. Also, the LID exhibit should help clarify not only how each basin is being treated with multiple treatments, but verify that these treatments were sized appropriately. JR Response: Addressed. Comment Number: 13 Comment Originated: 04/06/2016 04/06/2016: Please label concrete pans on the grading plan. JR Response: Addressed. Comment Number: 14 Comment Originated: 04/06/2016 04/06/2016: Two pond outfall structures are on the detail sheets. The City standard detail is the preferred one. JR Response: Addressed. Department: Technical Services Contact: Jeff County, 970.221-6588, icountya(�fcgov.com Topic: Building Elevations Comment Number: 6 Comment Originated: 02/24/2016 04/05/2016: No plans were provided for review. 02/24/2016: No comments. if building located within 1000ft to train tracks. 3. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required. 4. Low VOC interior finishes. JR Response: Galloway Architect had the Building Pre -Submittal meeting on April 28th 2016. Department: Light And Power Contact: Coy Althoff, CAlthoff(d)fcaov.com Topic: General Comment Number: 1 Comment Originated: 02/23/2016 02/23/2016: 3-phase electric service is available to this facility. The nearest underground vault with open positions is located on the S.W. corner of N. Lemay Ave. and Buckingham St. JR Response: Noted Comment Number: 2 Comment Originated: 02/23/2016 02/23/2016: New development, electric capacity fee, building site charges and any system modification charges will apply to this development. JR Response: Noted Comment Number: 3 Comment Originated: 02/23/2016 02/23/2016: Streetlights are placed along public streets by light and power. A 40' separation on both side of the light is required between canopy trees and streetlights. A 15' separation on both sides of the light is required between ornamental trees and streetlights. 'NOTE: Due to the overhead high voltage power transmission lines running along the West side of Lemay Ave. street lights would be placed on the East side of Lemay; therefore it is not necessary to depict their locations on your final plans. Please work with light and power engineering for the streetlight locations along Buckingham St. JR Response: Noted. Comment Number: 4 Comment Originated: 02/23/2016 02/23/2016: Transformer locations shall be within 10' of a paved surface and must have a minimum of an 8' clearance from the front side and a T clearance around the sides and rear. (1000 kVA up to 2500 kVA requires 4' around the sides and rear.) JR Response: Addressed. Comment Number: 5 Comment Originated: 02/23/2016 02/23/2016: Contact Light & Power Engineering to coordinate meter locations for this facility. JR Response: Noted. Comment Number: 6 Comment Originated: 02/23/2016 02/23/2016: Please provide a one line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be found at: http://zeus.fcoov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf JR Response: Noted. Comment Number: 7 Comment Originated: 02/23/2016 02/23/2016: Please contact Light & Power Engineering if you have any questions at 221-6700. Please reference our policies, development charge processes, and use our fee estimator at http://www.fcoov. com/utilities/business/builders-and-developers. JR Response: Noted Department: Internal Services Contact: Russell Hovland, 970.416-2341, rhovland(cbfcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated 02/1912016: Building Permit Pre -Submittal Meeting: Pre -Submittal meetings are required to assist the designer/builder by assuring, early on in the design, that the new commercial or multi -family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi -family projects are advised to call 416-2341 to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2012 International Building Code (IBC) 2012 International Residential Code (IRC) 2012 International Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (IPC) as amended by the State of Colorado 2014 National Electrical Code (NEC) as amended by the State of Colorado Fort Collins has amendments to most of the codes listed above. See the fcgov.com web page to view them. Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load:100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC. 2. Multi -family and Condominiums 3 stories max: 2012 IECC residential chapter. 3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial chapter. Project specific concerns: 1. Upgraded insulation is required for buildings using electric heat or cooling. 2. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min. 02/19/2016 Comment Number: 15 Comment Originated: 04/06/2016 04/06/2016: Make sure the plat is included in the Utility Plans for mylar, since it's listed in the sheet index. JR Response: Plat will be included Comment Number: 16 Comment Originated: 04/06/2016 04/06/2016: A variance request is needed for the minimum parkway width reduction. JR Response: A variance was requested and approved. Comment Number: 17 Comment Originated: 04/06/2016 04/06/2016: Please update the City of Fort Collins General Note 19 and Strom Drainage Note 2 to include the correct date of the study JR Response: Addressed. Comment Number: 18 Comment Originated: 04/06/2016 04/06/2016: Portions of the drainage easements are not shown on the plat. The plat shows a drainage easement beneath the pervious pavers. A drainage easement isn't needed unless it is for detention, rain gardens or bio-swales. Work with stormwater to see if these easements are required. JR Response: Addressed. Comment Number: 19 Comment Originated: 04/06/2016 04/06/2016: Verify with PFA to verify if the No Parking, Fire Lane signs along the building is sufficient. Not sure how this works if plans call for that area as a loading zone to the storage units. The Emergency Access Easement limits may need to be adjusted. JR Response: Emergency Access easement limits were adjusted. Comment Number: 20 Comment Originated: 04/06/2016 04/06/2016: More spot elevations are needed for the intersection detail of Buckingham Street and Lemay Avenue. See redlines. JR Response: Addressed Comment Number: 21 Comment Originated: 04/06/2016 04/06/2016: There Buckingham Street profile exceeds the max grade break. Please adjust. JR Response: Addressed. Comment Number: 22 Comment Originated: 04/06/2016 04/06/2016: A City signature block, legend is needed on Sheet 18. JR Response: Addressed. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanancDfcgov.com Topic: Landscape Plans Comment Number: 4 Comment Originated: 02/25/2016 02/25/2016: Some discussion at the site meeting to review trees near PRPA lines may have suggested that the 5 Austrian Pines be changed to Bosnia Pine for their smaller mature size. Please review meeting notes to see if that was the case. Thank you. JR Response: Addressed. Building C and Bulding B. JR Response: Addressed, no parking signs added. Comment Number: 2 Comment Originated: 02/24/2016 02/24/2016: Portions of the Certificate of Dedication Statement is missing on the Plat. Please provide more information. JR Response: The full "Certificate of Dedication" was added to plat cover. Comment Number: 5 Comment Originated: 02/24/2016 04/06/2016: As proposed, engineering will not support the minimum cover shown over the storm pipe. This will need to be looked at further. Use of a pan, raising the street, increasing the cross slope of the street or other options need to be considered. A formal variance request will be needed, detailing the justification of the proposed design. 02/24/2016: Cover over stormsewer in Buckingham Street as well as Lemay Avenue does not meet the minimum cover. As proposed Engineering would not support the design. Other solutions will be needed to achieve more cover over the stormlines. A pan be used across Buckingham Street along Lemay? It is unsure how cover will be met at the inlet on Buckingham and the pipe to the north to the New Belgium site. JR Response: A variance was requested and the design of Buckingham was adjusted. Comment Number: 6 Comment Originated: 02/24/2016 02/24/2016: The transition length on Buckingham Street is measured from the flowline on Lemay Avenue. Please adjust the intersection detail and the profile details on Buckingham Street. JR Response: Addressed. Comment Number: 7 Comment Originated: 02/24/2016 04/06/2016: Radius for Arterial Street is 25'. 02/24/2016: Show radius for the proposed ramp at the SW corner of Lemay and Buckingham. See redlines. Show cross slopes on the intersection detail as well. JR Response: Addressed Comment Number: 10 Comment Originated: 02/24/2016 04/06/2016: Since Buckingham Street is being rebuilt, consider raising the elevation of the street/site to provide more cover over Utilities in Buckingham Street. 02/24/2016: Is Buckingham Street being rebuilt from the property line on the west to Lemay Avenue on the east? JR Response: Addressed Comment Number: 13 Comment Originated: 02/24/2016 04/06/2016: Provide actual cross slopes for both Buckingham Street and Lemay Avenue. Stating typical 2% is not sufficient. 02/24/2016: Show the existing and proposed cross slopes for each cross section for the provided cross sections for Lemay and Buckingham (Sheets 16 and 17) JR Response: Addressed. Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/d"eve/0pmentreview April 8, 2016 Ken Merritt V � L/ rI S JR PLANNING & ENGINEERING Q� S{ 2900 S COLLEGE AVE SUITE 3C�G Fort Collins, CO 80525 RE: Lemay Avenue Craft Brewery & Self -Storage Facility, FDP160005, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard cDfcgov.com Topic: General Comment Number: 4 Comment Originated: 04/05/2016 04/05/2016: The latest set of plans indicates that the LID basins along Lemay have been removed in accordance with the direction from Stormwater. While this is a positive aspect from the Stormwater management perspective, it does result in less landscaping along Lemay. Would the applicant consider making up for this reduction in plant material by adding in random clusters of the smaller or narrower varieties of Spruce trees? Perhaps clusters of Bacheri, Hoopsi or Iseli Fastigiate could be planted between the groups of Ornamentals to contribute to the streetscaping along North Lemay Avenue. JR Response: Trees added along Lemay Avenue. Department: Engineering Development Review Contact: Marc Ragasa, 970.221.6603, mragasa(&fc4ov.com Topic: General Comment Number: 1 Comment Originated: 02/24/2016 02/24/2016: Check with Poudre Fire Authority regarding the Emergency Access Easement boundaries. Parking is not allowed in emergency access easements. This also applies to the loading area between shown between