HomeMy WebLinkAboutRIDGEVIEW CLASSICAL SCHOOL, REVISED PHASE IV ADDITION - SITE PLAN ADVISORY REVIEW - 16-01B - CORRESPONDENCE - (3)Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 22 Created: 4/18/2006
[4/18/06] No Comment
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
&'Qlbq Suukv-
Shelby Sommer
Associate City Planner
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
ARCHITECTURAL RESOURCE GROUP, PC Date: 05/02/2006
1828 WALLENBERG DR
FT COLLINS, CO 80526
Staff has reviewed your submittal for RIDGEVIEW CLASSICAL SCHOOLS REVISED
PHASE IV ADDITION SITE PLAN ADVISORY REVIEW, and we offer the following
comments:
ISSUES:
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
Number: 23 Created: 4/26/2006
[4/26/06] The acceptance language on the deed needs to be changed to the acceptance
line for a deed being accepted by the planning and zoning board. Since this project went to
the planning and zoning board for a hearing the deed must follow the same process.
I am working on having the legal checked.
Provide signed copy of the deed along with the TDRF application, TDRF processing fee
($250 check made out to the City of Fort Collins) and filling fee ($21 check made out to
Larimer County Clerk and Recorder) with the mylars.
Department: PFA
Topic: Fire
Number: 14
Issue Contact: Carle Dann
Created: 3/30/2006
[4/26/06] Thank you for addressing the Emergency Access Easement issue. Per my
comment at Conceptual Review, we're requesting that you provide rollover curbs on the
median at the Lemay entrance.
[3/30/06] ACCESS: A fire lane is required. The property does not appear to be platted,
based on information available from City Engineering. Therefore, the fire lane needs to be
designated as Emergency Access Easement on the plat. The fire lane shall be visible by
painting and signage, and maintained unobstructed. A fire lane plan shall be submitted for
approval prior to installation. The fire lane must be designed as a flat, hard, all-weather
driving surface (asphalt or concrete) capable of supporting fire apparatus weights. The fire
lane shall have appropriate maintenance agreements that are legally binding and
enforceable. The fire lane shall maintain the required minimum width of 20 feet throughout
the length of the fire lane. Contact Carle Dann at Poudre Fire Authority for details regarding
the route, painting and signage of the fire lane.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic. Stormwater
Number: 16 Created: 3/31/2006
[4/28/06] Reminder comment.
[3/31/06] Is there an existing drainage easement that needs to be vacated with the building
addition? The new, detention pond area should also be in a drainage easement if it is not
already in one.
Page 1