HomeMy WebLinkAboutMORNINGSTAR ASSISTED LIVING & MEMORY CARE - FDP - FDP130055 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPermeable Pavement Systems T-10 PERMEABLE PAVEMENT BASE COURSE FILTER LAYER SUBGRADE CAST IRON VALVE BOX WITH LOCKING LID -REMOVABLE PVC THREADED PLUG k COUPLER 3" MIN. THICK CONCRETE COLLAR 0 Figure PPS-8. Observation Well 4"0 SLOTTED PVC PIPE MEETING TABLE PPS-2 (TERMINATE PIPE AT THE BOTTOM OF THE FILTER LAYER WITH A NO INFILTRATION SECTION) BARRIER ABLE) WELL R August 2013 Urban Drainage and Flood Control District PPS-19 Urban Storm Drainage Criteria Manual Volume 3 I 1. T-10 Permeable Pavement Systems Oi,fiY'PINIiT ♦' SOLID PIPE SMRM MANHOLE Y A OR VAULT (IYP.) IrjjT To OUTLET I �SLO1TED PVC MEERNG TABLE PPS-2 ,,,CONCRETE EDGE (WHERE APPLICABLE) P:. :.- _. � • `OOMPACIED JVVMWL ECIK&Lt W A NTs B Figure PPS-7. Underdrain System Layout and Outlet Details PPS-18 Urban Drainage and Flood Control District August 2013 Urban Storm Drainage Criteria Manual Volume 3 T-10 Permeable Pavement Systems GEOMEMBRANE LINER ---- -- CONNECTION TO So FIL7 IR M%!� CONCRETE MEETING ABLE 1-/ (SEE DETAIL PPS-4)1 k12:A SEPARATOR FABRIC UNDERORAIN MEETING TABLE PPS-2 30 MIL (MIN.) SEPARATOR FABRIC (ONLY ENSURE INSTALLATION is CONSISTENT GEOMEMBRANE8ESWHEN SUBGRADE CONTAINS WITH MANUFACTURER RECOMMENDATIONS LINER PER TABLE PPS-4 ANGULAR ROCK OR an*R TMT PUNCTU MATMAL MAY RE NO -INFILTRATION SECTION Tm GF-OmaniANE uNER' PERIMETER BARRIER PERMEABLE PAVEM'311 41A'- V WN. (IF APPLICABLE) DELEVELING COURSE OF APPL;i PTH DEPENDANT ON TYPE Ir MIN. RESERVOIR (AASHTID #57 OR j"7) x--FiLTER MATERIAL MEETING TABLE PPS-1 OR SEPARATOR FABRIC IF NEEDED FOR MATERIAL COMPATIBILITY. TO BE DETERMINED BY A GEOTECHNICAL ENGINEER .FULL INFILTRATION SECTION Figure PPS-1. Permeable Pavement Sections PPS-6 Urban Drainage and Flood Control District August 2013 Urban Storm Drainage Criteria Manual Volume 3 Extended Detention Basin (EDB) T-5 FLOW LENGTH 12W OR VERTICAL COINC. ELM WALL J. LM NTS ACCESSIBLE OUTLET WITH TRASH RACK INITIAL SURCHARGE ---� URFACE PROVIDE DUW 4' MIN. NFLOW ENERGY MICROPOOL DEPTH DISSIPATON 2.5' MIN. INFLOW ARMORED BERM OR VERTICAL CONC. WALL INVERT OF TRICKLE _----- -- CHANNEL 8- MIN. PIPE) WITH BERM. USE NOTCH FOR WALL 'SOFT BOTTOM WHERE BASE FLOWS OR GROUNDWATER IS ANTICIPATED 'INCREASE WHERE BASE FLOWS ARE ANTICIPATED 4:1 SIDESLOPES WITH NO AREAS GREATER THAN 3:1. FOR AESTHETIC DESIGN. VARY SLOPES AND DESIGN ONE SIDE MILDER THAN THE OTHER. FOREBAY WITH CONCRETE OR GROUTED ROCK FLOOR. PROVIDE ENERGY DISSIPATION FOR CONCENTRATED FLOW. ® IN THE BOTTOM OF THE BASIN PROVIDE A 3% MIN. SLOPE TO THE TRICKLE CHANNEL OR MICROPOOL. NC ETE SLOPE BETWEEN 0.4 AND 1.05 EMBANKMENT WITH SPILLWAY CONCRETE TRICKLE CHARNEL RUNDOWN CONCRETE OR SOFT BOTTOM 'MICROPOOL OUTLET WORK (SEE ADDITIONAL DETAILS PROR IN FACT SHEET T-12) N S SEEPAGE CUTOFF COLLAR OF NECESSARY) Figure EDB-3. Extended Detention Basin (EDB) Plan and Profile t detarls rncludurg orifice p s and trash racks December 2010 Urban Drainage and Flood Control District EDB-11 Urban Storm Drainage Criteria Manual Volume 3 T-2 Grass Swale RESIDUAL CAPACITY FOR LARGER FLOODS FPS 4" (MIN) SANDY LOAM I LJ 1" MIN 12 MIN BOTTOM WIDTH (W) RESIDUAL CAPACITY FOR LARGER FLOODS 72" MIN. _ 2-YR WSE 4 MIN. 6" MIN /1 4' MIN. SANDY LOAM 1" MIN. D1.0' " --- T- V (2-YR) 1.0 FPS 12" 0 _z 21 7,73I 1Lai ► CONCRETE COLLAR r GRADE CONTROL ii mew ENERGY u / STRUCTURE n1 4 MIN. GRADE CONTROL STRUCTURE BEYOND • GRADE CONTROL STRUCTURE BEYOND O UNDERDRAIN AND SANDY LOAM RECOMMENDED FOR LONGITUDINAL SLOPES < 2.0%. 4" SLOTTED PIPE MEERNG TABLE GS-3 WITH CDOT CLASS C FILTER MATERIAL. ALL AROUND OR PERFORATED HOPE PIPE WITH AASHTO #67 ALL AROUND CONTAINED WITHIN GEOTEXTILE FABRIC. ASTM D4751-ADS US STD. SIEVE #50 TO #70. ASTM D4533 MIN. TRAPEZOIDAL TEAR STRENGTH 100 X 60 LBS. MINIMUM COE SPECIFIED OPEN AREA OF 4R. EXTEND GRADE CONTROL STRUCTURES INTO THE BANK A MIN. 0.5' ABOVE THE 2-YR WSE PROVIDE DOUBLE CLEAN0UT5 - WITH WATER TIGHT CAPS 0150' O.C. USE 90- SWEEP OR (2) 45- BENDS (OFFSET FROM SWALE UNDERORAIN CENTERUNE TO AVOID IMPEDING ENSURE ACCESS TO OUTLET FLOW WHEN USING A TRIANGULAR BY CLFiVJ OUT OR OTHER SECTION ACCESSIBLE STRUCTURE SWALE PROF] NTS Figure GS-1. Grass Swale Profile and Sections Design Example The UD-BMP workbook, designed as a tool for both designer and reviewing agency is available at www.udfcd.or>?. This section provides a completed design form from this workbook as an example. GS-6 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3 Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Designer: Company: Date: Project: Location: MM Interwest Consulting Group December 6, 2013 MVG - Morningstar Facility DETENTION BASIN B (NW) 3of3 6. Two -Stage Design - See Figure EDB-1 A) Top Stage (Depth Dwo = 2' Minimum) Dwo = feet Top Stage Storage: no less than 99.5%of Design Volume (0.0627 acre-feet.) Storage= acre-feet B) Bottom Stage Depth (DBs = 0.33' Minimum Below Trickle Channel Invert) DBS = feet Bottom Stage Storage: no less than 0.50%of Design Volume (0.0003 acre-feet.) Storage= acre-feet Storage = A' Depth Above WS To Bottom Of Top Stage Surf. Area=' acres C) Micro Pool (Minimum Depth = the Larger of Depth= feet 0.50 ' Top Stage Depth or 2.5 Feet) D) Total Volume: Vora = Storage from 5A + 6A + 6B Vol,o, = acre-feet (Must be > Design Volume in 1 D, or 0.063 acre-feet.) 7. Basin Side Slopes (Z, horizontal distance per unit vertical) Z = (horizontal/vertical) Minimum Z = 4, Flatter Preferred 6. Dam Embankment Side Slopes (Z, horizontal distance) Z = (horizontal/vertical) per unit vertical) Minimum Z = 3, Flatter Preferred 9. Vegetation (Check the method or describe "Other") Native Grass Irrigated Turf Grass Other: Notes: UD-BMP v2.06.x1s, EDB - NW POND 12/6/2013, 10:29 AM Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 2 of 3 Designer: MM Company: Interwest Consulting Group Date: December 6, 2013 Project: MVG - Morningstar Facility Location: DETENTION BASIN B (NW) iii) Type of Screen (Based on Depth H), Describe if "Other" I S.S. #93 VEE Wire (US Filter) Other: iv) Screen Opening Slot Dimension, Describe if "Other" I i 0.139" (US Filter) Other: v) Spacing of Support Rod (O.C.) Type and Size of Support Rod (Ref.: Table 6a-2) vi) Type and Size of Holding Frame (Ref.: Table 6a-2) inches D) For 2' High Rectangular Opening (Refer to Figure 6b): 1) Width of Rectangular Opening (W) W =( inches ii) Width of Perforated Plate Opening (W.. = W + 12") Ww. =' inches iii) Width of Trashrack Opening (W,,,,;,,) from Table 6b-1 Wo nft =1 -inches iv) Height of Trash Rack Screen (HTR) HTR =; inches v) Type of Screen (based on depth H) (Describe if "Other") Klemprm KPP Series Aluminum Other: vi) Cross -bar Spacing (Based on Table 6b-1, KlempTM KPP inches Grating). Describe if "Other" Other: vii) Minimum Bearing Bar Size (KlempTM Series, Table 61b-2) Based on depth of WOCV surcharge) 4. Detention Basin length to width ratio (L/W) 5 Pre -sedimentation Forebay Basin - Enter design values A) Volume (3%to 5%of Design Volume from 1D) acre-feet (3% - 5% of Design Volume (0.0019 - 0.0032 acre-feet.) B) Surface Area acres C) Connector Pipe Diameter inches (Size to drain this volume in 5-minutes under inlet control) D) Paved/Hard Bottom and Sides yes/no UD-BMP v2.06.x(s, EDB - NW POND 12/6/2013, 10:29 AM Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility 1 Designer: Company: Date: Project: Location: MM Interwest Consulting Group December 6, 2013 MVG - Morningstar Facility DETENTION BASIN B 1. Basin Storage Volume la = 47.00 % A) Tributary Area's Imperviousness Ratio (i = la / 100) i =1 0.47 B) Contributing Watershed Area (Area) Area = 3.180 acres C) Water Quality Capture Volume (WQCV) WQCV =; 0.20 (watershed inches (WQCV =1.0 ' (0.91 ' 13 - 1.19. Iz + 0.78 ' 1)) D) Design Volume: Vol = (WQCV / 12)' Area' 1.2 Vol =i 0.0630 , acre-feet 2. Outlet Works A) Outlet Type (Check One) X Orifice Plate Perforated Riser Pipe Other: B) Depth at Outlet Above Lowest Perforation (H) H = 1.95 feet C) Recommended Maximum Outlet Area per Row, (Aa) Ao =i 0.2 square inches D) Perforation Dimensions: i) Circular Perforation Diameter or D =. 0.500 inches ii) Width of 2" High Rectangular Perforations W =' inches E) Number of Columns (nc, See Table 6a-1 For Maximum) nc =z 1 number F) Actual Design Outlet Area per Row (k) Aa =' 0.2 square inches G) Number of Rows (nr) nr =,` 6 number H) Total Outlet Area (A,,) Ap, _ 1.2 'square inches 3. Trash Rack A) Needed Open Area: A, = 0.5' (Figure 7 Value) ' Ae, A, =1 4-2 square inches B) Type of Outlet Opening (Check One) i X < 2" Diameter Round 2" High Rectanaular Other: C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): i) Width of Trash Rack and Concrete Opening (W..) from Table 6a-1 Wiz _' 3 inches ii) Height of Trash Rack Screen (HTR) HTR =� 54 inches UD-BMP v2.06.xls, EDB - NW POND 12/6/2013, 10:29 AM Designer: Company: Date: Project: Location: Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 3 of 3 MM Interwest Consulting Grout December 6, 2013 MVG - Morningstar Facility DETENTION BASIN A (SW) 6. Two -Stage Design - See Figure EDB-1 A) Top Stage (Depth Dwo = 2' Minimum) Dwo = feet Top Stage Storage: no less than 99.5% of Design Volume (0.0215 acre-feet.) Storage= acre-feet B) Bottom Stage Depth (DBS = 0.33' Minimum Below Trickle Channel Invert) DBS = feet Bottom Stage Storage: no less than 0.5%of Design Volume (0.0001 acre-feet.) Storage= acre-feet Storage = A " Depth Above W S To Bottom Of Top Stage Surf. Area=l acres C) Micro Pool (Minimum Depth = the Larger of Depth= feet 0.50 ' Top Stage Depth or 2.5 Feet) D) Total Volume: Vol,, = Storage from 5A + 6A + 6B Vol,, =i acre-feet (Must be> Design Volume in 1D, or 0.0216 acre-feet.) 7. Basin Side Slopes (Z, horizontal distance per unit vertical) Z = (horizontal/vertical) Minimum Z = 4, Flatter Preferred 8. Dam Embankment Side Slopes (Z, horizontal distance) Z = (horizontal/vertical) per unit vertical) Minimum Z = 3, Flatter Preferred 9. Vegetation (Check the method or describe "Other") Native Grass Irrigated Turf Grass Other: Notes: UD-BMP v2.06.xis, EDB - SW POND 12/6/2013, 10:28 AM Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 2 of 3 Designer: MM Company: Interwest Consulting Group Date: December 6, 2013 Project: MVG - Morningstar Facility Location: DETENTION BASIN A (SW) iii) Type of Screen (Based on Depth H), Describe if "Other" I S.S. #93 VEE Wire (US Filter) Other: iv) Screen Opening Slot Dimension, Describe if "Other" 0.139" (US Filter) Other: v) Spacing of Support Rod (O.C.) inches Type and Size of Support Rod (Ref.: Table 6a-2) vi) Type and Size of Holding Frame (Ref.: Table 6a-2) D) For 2" High Rectangular Opening (Refer to Figure 6b): 1) Width of Rectangular Opening (W) W =i inches ii) Width of Perforated Plate Opening (W.. = W + 12") Ww. _`. inches iii) Width of Trashrack Opening (W,,,;,,o) from Table 6b-1 W�rwv =i -inches iv) Height of Trash Rack Screen (HTR) HTR =1 - - inches v) Type of Screen (based on depth H) (Describe if "Other") I KlempTm KPP Series Aluminum Other: vi) Cross -bar Spacing (Based on Table 6b-1, KlempTm KPP I ( inches Grating). Describe if "Other" Other: vii) Minimum Bearing Bar Size (Klemp'" Series, Table 6b-2) Based on depth of WQCV surcharge) 4. Detention Basin length to width ratio (L/W) 5 Pre -sedimentation Forebay Basin - Enter design values A) Volume (3%to 5%of Design Volume from 1D) acre-feet (3% - 5% of Design Volume (0.0006 - 0.0011 acre-feet.) B) Surface Area acres C) Connector Pipe Diameter inches (Size to drain this volume in 5-minutes under inlet control) D) Paved/Hard Bottom and Sides yes/no UD-BMP v2.06.xls, EDB - SW POND 12/6/2013, 10:28 AM Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Designer: MM Company: Interwest Consulting Group Date: December 6, 2013 Project: MVG - Morningstar Facility Location: DETENTION BASIN A (SW) 1. Basin Storage Volume A) Tributary Area's Imperviousness Ratio (i = 1./ 100 ) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) (WQCV =1.0' (0.91 ' 13 - 1.19. 12 + 0.78 " p) D) Design Volume: Vol = (WQCV / 12) " Area " 1.2 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Recommended Maximum Outlet Area per Row, (A.) D) Perforation Dimensions: i) Circular Perforation Diameter or ii) Width of 2" High Rectangular Perforations E) Number of Columns Inc, See Table 6a-1 For Maximum) F) Actual Design Outlet Area per Row (k) G) Number of Rows (nr) H) Total Outlet Area (A,) 3. Trash Rack A) Needed Open Area: A, = 0.5' (Figure 7 Value)' Pe, B) Type of Outlet Opening (Check One) C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): I) Width of Trash Rack and Concrete Opening (W...) from Table 6a-1 ii) Height of Trash Rack Screen (HTR) 1. = 38.00 % i =' 0.38 Area = 1.240 acres WQCV =; 0.17 watershed inches Vol = 6.0216 'acre-feet X Orifice Plate Perforated Riser Pipe Other: H = 1.60 feet k = 0.1 square inches D =. 0.500 inches W = inches nc 1 number Ao =' 0.2 'square inches nr= 5 number k, = 1.0 square inches A, = 35 square inches X < 2" Diameter Round 2" High Rectangular Other: Wes, -3 'inches HTR 54 inches UD-BMP v2.06.xls, EDB - SW POND 12/6/2013, 10:28 AM _rL rotuNnwtevuo fl II_I I 50 25 0 50 SCALE: 1"= 100_ — uua�sls cou�rr --- F J Ll_ J _-- JJ I I I L I COLL/ND.V.EPUOr covaas I I L_J Il I J I I II I I JJ _—� I PIu+r9)W" w (N) �NRC 3� RCP ivv (s) ,) M a PCP wv {E) ux�vu.ac C/ WMW., C4I rdo WI1MW.r ,lor�do 80550 P :(9T0)61a0000 F.: (970) 674J000 I R T E R W E R T C 0 N 5 U L T I N G G R 0 U opt L ( Co NOAL O \R. aiuni�arWla "raaR / G 1 4C e y \ COLL/NOALEPUOB7/ / J / st I I I _ — — � y� ,row—aa.o LID BASIN AREA EXHIBIT NEW IMPERVIOUS AREA: 2.15 acre MINIMUM AREA TO BE TREATED: Oa acre BASIN AREA I - GRASS SWAIE 0.31 acre BASIN AREA 2-GLASS SWAIE 0.50 acre BASIN AREA 3-GRAVEL DRYWEUS: 0.54 acre BASIN AREA 4A -PERVIOUS PAVERS 0.12 acre BASIN AREA 4B-PERVIOUS PAVERS 0.11 acre BASIN AREA 4C-PERVIOUSPAVERS 0.10 acre TOTAL AREA TREATED: t!fi8� acre MVG - MORNINGSTAR LID AREA EXHIBIT DATE CREATED: 12/23/13 APPENDIX D WATER QUALITY ME LOCATION: MVG - Morningstar PROJECT NO: 1173-105-00 COMPUTATIONS BY: MHM SUBMITTED BY: INTERWEST CONSULTING GROUP DATE: 10/1/2013 t* of berth Equation for flow over a broad crested weir _ Q = CLH H where C = weir coefficient = 2.6 4 elevtltlotl H = overflow height L = length of the weir The pond has a spill elevation equal to the maximum water surface elevation in the pond Design spillway with 0.5 It flow depth, thus H = 0.5 ft Size the spillway assuming that the pond outlet is completely clogged. SW Detention Pond 0 (100) = 4.5 cfs (peak flow into pond) Spill elev = 70.00 ft = 100-year WSEL Min top of berm elev.= 70.50 Weir length required: L= 5 It Use L . 5 K v = 1.01 ft/s NW Detention Pond 0 (100) = 12.3 cfs (peak flow into pond) Spill elev = 67.40 It = 100-year WSEL Min top of berm elev.= 67.90 Weir length required: L = 13 ft Use L = 13 h v = 1.42 ft/s Pond Design Point 0(100) (cfs) Weir Length Available(ft) Min. Spill Height (ft) Approx. Velocity (ft/s) SW Detention Pond A 5 5 0.49 1.01 NW Detention Pond B 12 13 0.51 1.42 spillway, detentionAs EXTENDED DETENTION BASIN B (NW) Proposed Detention Pond - Stage/Storage LOCATION: MVG - Morningstar PROJECT NO: 1173-105-00 COMPUTATIONS BY: MHM SUBMITTED BY: INTERWEST CONSULTING GROUP DATE: 10/1/2013 WO WSEL- 100-yr WSEL- SPILL WA Y - TOP OF BERM - V = 1/3 d (A + B + sgrt(A`B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Stage (Elev) Surface Area (Ft^2) Incremental Storage (Ac-ft) Detention Storage (Ac-ft) Total Storage (Ac-ft) 62.80 0 63.0 180 64.0 2168 0.02 0.02 64.5 3813 0.03 0.00 0.06 65.0 5458 0.05 0.05 0.11 66.0 7535 0.15 0.20 0.26 67.0 9287 0.19 0.39 0.45 67.25 9871 0.05 0.45 0.51 67.4 10235 0.03 0.48 0.54 67.9 0 0.04 0.52 0.58 Total Storage Req'd Storage 0.540 > 0.377 detention.xls Interwest Consulting Group DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: MVG MORNINGSTAR - EXTENDED DETENTION BASIN B (NW) PROJECT NO: 1173-105-00 COMPUTATIONS BY: MM DATE: 10/1/2013 Equations: Area trib. to pond = 3.18 acre Developed flow = Qp = CIA C (100) = 0.59 Vol. In = Vi = T C I A = T Qo Developed C A = 1.9 acre Vol. Out = Vo =K QPo T Release rate, QPo = 1.2 cfs storage = S = Vi - Vo K = 0.9 (from fig 2.1) Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67") rainfall Storm Duration, T (min) Rainfall Intensity, I (in/hr) Qp (cfs) Vol. In Vi (ft) Vol. Out Vo (ft) Storage S (ft) Storage S (ac-ft) 5 9.95 18.7 5600 335 5266 0.12 10 7.77 14.6 8743 670 8073 0.19 20 1 5.62 10.5 12655 1339 11315 0.26 30 4.47 8.4 15090 2009 13081 0.30 40 3.74 7.0 16840 2679 14162 0.33 50 3.23 6.1 18202 3349 14853 0.34 60 2.86 5.4 19316 4018 15297 0.35 70 2.57 4.8 20258 4688 15570 0.36 80 2.34 4.4 21077 5358 15719 0.36 90 2.15 4.0 21800 6027 t 773� <eg-M 100 1.99 3.7 22450 6697 15753 0.36 110 1.86 3.5 23039 7367 15672 0.36 120 1.75 3.3 23579 8036 15543 0.36 130 1.65 3.1 24078 8706 15372 0.35 140 1.56 2.9 24542 9376 15166 0.35 150 1.48 2.8 24976 10046 14931 0.34 160 1.41 2.6 25384 10715 14669 0.34 170 1.35 2.5 25769 11385 14384 0.33 180 1.29 2.4 26133 12055 14078 0.32 Required Storage Volume: 15773 ft3 0.36 acre-ft detention.xls,FAA-100yr NW POND EXTENDED DETENTION BASIN A (SW) Proposed Detention Pond - Stage/Storage LOCATION: MVG - Morningstar PROJECT NO: 1173-105-00 COMPUTATIONS BY: MHM SUBMITTED BY: INTERWEST CONSULTING GROUP DATE: 10/1/2013 WO WSEL- 100-yr WSEL- SPILLWAY- TOP OF BERM - V= 1/3d (A+B+sgrt(A'B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Stage (Elev) Surface Area (Ft^2) Incremental Storage (Ac-ft) Detention Storage (Ac-ft) Total Storage (Ac-ft) 66.7 0 67.0 199 0.00 0.00 0.000 68.0 673 0.01 0.00 0.010 68.5 2151 0.02 0.03 0.025 69.0 3630 0.03 0.06 0.058 69.70 5386 0.07 0.13 0.130 70.00 6151 0.04 0.17 0.170 70.50 0 0.02 0.19 0.193 Total Storage Req'd Storage 0.193 > 0.130 detention.xls Interwest Consulting Group DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: MVG MORNINGSTAR - EXTENDED DETENTION BASIN A (SW) PROJECT NO: 1173-105-00 COMPUTATIONS BY: MHM DATE: 10/1/2013 Equations: Area trib. to pond = 1.24 acre Developed flow = Qp = CIA C (100) = 0.49 Vol. In = Vi = T C I A = T Qo Developed C A = 0.6 acre Vol. Out = Vo =K Qpo T Release rate, Oao = 0.5 cfs storage = S = Vi - Vo K = 0.9 (from fig 2.1) Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67") rainfall Storm Duration, T (min) Rainfall Intensity, I (in/hr) OD (cfs) Vol. In Vi (ft) Vol. Out Vo (ft) Storage S (ft) Storage S (ac-ft) 5 9.95 6.0 1814 131 1683 0.04 10 7.77 4.7 2831 261 2570 0.06 20 1 5.62 3.4 4098 522 3576 0.08 30 4.47 2.7 4887 783 4104 0.09 40 3.74 2.3 5454 1045 4409 0.10 50 3.23 2.0 5895 1306 4589 0.11 60 2.86 1.7 6255 1567 4688 0.11 70 2.57 1.6 6561 1828 4733 0.11 80 2.34 1.4 6826 2089 4736 0. 1 90 2.15 1.3 7060 2350 4710 0.11 100 1.99 1.2 7270 2611 4659 0.11 110 1.86 1.1 7461 2873 4589 0.11 120 1.75 1.1 7636 3134 4502 0.10 130 1.65 1.0 7798 3395 4403 0.10 140 1.56 0.9 7948 3656 4292 0.10 150 1.48 0.9 8088 3917 4171 0.10 160 1.41 0.9 8220 4178 4042 0.09 170 1.35 0.8 8345 4439 3906 0.09 180 1.29 0.8 8463 4701 3762 0.09 Required Storage Volume: 4736 ft3 0.11 acre-ft detention.xls,FAA-100yr SW POND Cross Section for WOO West Drainage Easement Cross-section Protect l)escnphon . ............. . . Flow Element: Irregular Section Friction Method: Solve For. Manning Formula Normal Depth wow Roughness Coefficient: 0.019 Channel Slope: 0.00600 Normal Depth: 1.53 ft Elevation Range: 0.00 to 7.85 It Discharge: 150.20 fels -r 1.63 It -L i38.63 ft Vs L H.1 Worksheet for WOO West Drainage Easement Cross-section Worksheet for Q100 West Drainage Easement Cross-section �' '� p 4 b'•,+� � ��� �3r� �� �s(,r ��,,"�rPy�R�'e'�',u'4���3i��I�p�� . . � i�r� � i3.a udrhtRi7�A`�1e-i�.-,x;SW �fi�.,v� «'x edis:�t�titsF.r�'.�m��C1 �'k�i�'.�` L� G �• aifi (?1zi_`YiGN� x1t �IU �YS,+^:'?14.S�k44n��'.�'.;x�`5u Flow Element: lrreguler Section Friction Method: Manning Formula Solve For. Normal Depth Channel Slope: 0.00600 Wit Discharge: 150.20 fN/s Current Roughness Weighted Meth( Improvedt-otters Open Channel Weighted Roughnes: Improvedl_otters Closed Channel Weighted Roughne Hortons Roughness Coefficient: 0.019 Water Surface Elevation: 1.53 ft Elevation Range: 0.00 to 7.85 ft Flow Area: 29.48 ft2 Wetted Perimeter. 38.76 ft Top Width: 38.63 ft Normal Depth: 1.53 ft Critical Depth: 1.55 ft Critical Slope: 0.00566 ft/ft Velocity: 5.09 f /S Velocity Head: 0.40 ft Specific Energy: 1.94 ft Froude Number. 1.03 Flow Type: Supercrttical (•0+25, 2.15) (-0+02, 0.17) 0.025 017) 10+.02 9 `17) 0 013 � Y (0+02, 0.17) (0+21, 1.55) 0.025 (0+21, 4.55) (0+25, 5.35) 0.025 James ]EL Si Tart and Assocaates, Ine. Consulting Engineers March 15, 1978 STORM DRAINAGE SWALE COLLINDALE SECOND FILING, The swale that exists at the Easterly side of Collindale, Second Filing will receive drainage from the following areas: Foothills Meadow Apartments - 16 Acres: Warren Shores - 23 Acres North Shore P.U.D. - 10 Acres Warren Lake Park - 26 Acres Collindale, First Filing - 11 Acres . TOTAL 86 Acres Of the above areas, North Shore P.U.D. does have onsight detention and the Warren Lake Park will.not increase the runoff, due to development, to a great extent. The runoff for a 100 year frequency storm would be as follows: ."Foothills.Meadows Q 0.8 x 4.2 x 16 =• 54. c.f.s. ' Warren Shores Q = 0."6 x 4.2 x 23 = 58 c:f.s North Shore P.U.D. Q '0.4.x 5 x 10 =. 20 c.f;s. Warren Lake Park Q = 0.4.x 5. x 26 = 52 c.f.s Collindale. Q = 0.6 x 5 x 11 = 33 c.f.s. TOTAL = 217 c.f.s The swale would be as shown below to carry the 100 year storm. Sox �'� G r� � x �ooG�� � . _ .. �P -. Y:'P �.�•'r.S� ' = 23oG�=5 /ja �i✓N..rGr aarsc iu��u.�' mr F+�i2 e o,.,v�nwt Therefore; it is determined that Buildings C. D, E, and F as shown on the site plan would not be damaged during 4,100 year frequency storm.,. a Richard A. Rutherford, P.E. L.S. OFFICE-214 NORTH 110%VES O r.0: BOX 429 O FORT COLLINS. COLORADO 805220 O 1F.I.E11110NE AREA SOX.M9.9931 APPENDIX C HYDRAULIC COMPUTATIONS SUMMARY PROPOSED DRAINAGE SUMMARY TABLE Design Point Tributary Sub -basin Area (ac) C (2) C (10) C (100) tc (2) (min) to (10) (min) to (100) (min) 0(2)tot (cfs) 0(10)tot (cfs) G(100)tot (cfs) DRAINAGE STRUCTURE /REMARKS A SW A SW 1.24 0.39 0.39 0.49 12.0 12.0 11.1 1.0 1.7 4.5 B (NW) B (NW) 3.18 0.47 0.47 0.59 14.1 14.1 14.1 2.9 4.9 12.5 Page 1 SUMMARY EXISTING DRAINAGE SUMMARY TABLE Design Point Tributary Sub -basin Area (ac) C (2) C (10) C (100) tc (2) (min) tc (10) (min) to (100) (min) G(2)tot (cfa) 0(10)tot (efa) 0(100)tot (efa) DRAINAGE STRUCTURE /REMARKS 1 OVERALL SITE 4.41 0.20 0.20 0.25 13.3 17.2 17.2 1.7 2.6 6.7 Page 1 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 100-yrstorm, Cl= RATIONAL METHOD PEAK RUNOFF (100-YEAR) MVG MORNINGSTAR 1173-105-00 MM 12/ 19/2013 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Point Area Design. A (ac) C Cf tc (min) i (new) (in/hr) Q (100) (cfs) from Design Point Q (100) (cfs) 0(100)tot (cfs) A (SW) 1.24 0.49 11.1 7.43 4.5 4.5 B NW 3.18 0.59 14.1 6.70 12.5 12.5 Q=CiA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow-PDP.xIs Q100 Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: PROJECT NO: COMPUTATIONS BY DATE: 10-yr storm, Cf = RATIONAL METHOD PEAK RUNOFF (10-YEAR) MVG MORNINGSTAR 1173-105-00 MM 12/19/2013 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) C Cf tc (min) i (new) (in/hr) Q (10) (Cfs) from Design Point O (10) (cfs) Q(10)tot (cfs) A SW 1.24 0.39 12.0 3.52 1.7 1.7 B NW 3.18 0.47 14.1 3.28 4.9 4.9 Q=CfCiA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow-PDP.xls 010 Interest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: PROJECT NO: COMPUTATIONS BY DATE: 2-yr storm, Cf = RATIONAL METHOD PEAK RUNOFF (2-YEAR) MVG MORNINGSTAR 1173-105-00 MM 12/19/2013 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) C Cf tc (min) i (new) (in/hr) Q (2) (Cfs) from Design Point Q (2) (Cfs) Q(2)tot (Cfs) A SW 1.24 0.39 12.0 2.06 1.0 1.0 B NW 3.18 0.47 14.1 1.92 2.9 2.9 Q=CtCiA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Flow-PDP.xIs Q2 Interest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 100-yr storm MVG MORNINGSTAR 1173-105-00 MM 12/19/2013 C1= 1.25 STANDARD FORM SF-2 TIME OF CONCENTRATION - 100 YR SUB -BASIN DATA INITIAL /OVERLAND TIME TRAVEL TIME / GUTTER OR CHANNEL FLOW 00 to CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) C'Cf Length (it) (4) Slope (%) (5) ti (min) (6) Length (ft) (7) Slope I%) (8) n Manning rough. Val. (ft/s) (9) It (min) (10) tc = ti+d (11) Total L (It) (12) tc=(I/180)+10 (min) (13) (min) (14) A SW 1.24 0.39 0.49 125 2.0 9.7 240 2.00 0.016 2.8 1.4 11.1 365 12.0 11.1 B NW 3.18 0.47 0.59 345 2.0 13.6 385 1.50 0.016 2.5 2.6 16.2 730 14.1 14.1 EQUATIONS: tc=ti+tt ti=[1.87(1.1-CC,)Los]/S'' tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of If + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves Flow-PDP.zIs TOC-100 Interest Consulting Group 1218 West Ash, Suite C Windsor, Colorado STANDARD FORM SF-2 TIME OF CONCENTRATION - 10 YEAR LOCATION: MVG MORNINGSTAR PROJECT NO: 1173-105-00 COMPUTATIONS BY: MM DATE: 12/19/2013 10-yr storm C1= 1.00 SUB -BASIN DATA INITIAL /OVERLAND TIME (it) TRAVEL TIME / GUTTER OR CHANNEL FLOW (II) to CHECK (URBANIZED BASIN) FINAL to REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) Length (it) (4) Slope (%) (5) ti (min) (6) Length (it) (7) Slope (%) (8) n Manning 1 rough. Vol. (@/s) (9) it (min) (10) to- li + It (11) Total (t) (12) tc-(1/180)+10 (min) (13) (min) (14) A SW 1.24 0.39 125 2.0 11.3 240 2.00 0.016 2.8 1.4 12.7 365 12.0 12.0 B (NW 3.18 0.47 345 2.0 16.8 385 1.50 0.016 2.5 2.6 19.4 730 14.1 14.1 EQUATIONS: It; =ti+Ill ti=[1.87(1.1-CC,)L0'I/S"3 It = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check min. tc = 5 min. due to limits of OF curves Flow-PDPAs TOC-10 STANDARD FORM SF-2 TIME OF CONCENTRATION - 2 YEAR LOCATION: MVGMORNINGSTAR PROJECT NO: 1173-105-00 COMPUTATIONS BY: MM DATE: 12/ 19/2013 2-yr storm Cl = 1.00 SUB -BASIN DATA INITIAL /OVERLAND TIME(tl) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) to CHECK (URBANIZED BASIN) FINAL to REMARKS DESIGN POINT SUBBASIN(s (1) Area (ac) (2) C (3) Length (k) (4) Slope (`Y) (5) ti (min) (6) Length (k) (7) Slope (%) (8) n Manning rough. Val. (k/s) (9) it (min) (10) tc = ti+k (11) Total L (k) (12) tc=(V780)+10 (min) (13) (min) (14) 1 A (SW) 1.24 0.39 125 2.0 11.3 240 2.00 0.030 1.5 2.6 13.9 365 12.0 12.0 2 B (NW) 3.18 0.47 345 2.0 16.8 385 1.50 0.030 1.3 4.9 21.6 730 14.1 14.1 EQUATIONS: tc=ti+tt ti=[1.67(1.1-CCiI)L0.5]/S.113 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: RUNOFF COEFFICIENTS & % IMPERVIOUS M VG MORNINGSTAR 1173-105-00 MM 12/6/2013 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt): Concrete: Roofs: Gravel: Lawns (fiat Q%, heavy soil): Runoff coefficient C % Impervious 0.95 100 0.95 96 0.95 90 0.50 40 0.20 0 SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.ft) PAVED AREA (sq.tt) CONCRETE AREA (sq.ft) ROOF AREA (sq.it) GRAVEL AREA (sq.ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) % Impervious REMARKS A (SW) 1.24 53,825 0 4,097 18,131 0 0.39 38 Roof, SW portion of site B (NW) 3.18 138,360 37,019 6,401 24,869 0 0.47 47 Parking, Roof, remainder of site E uai ns - Calculated C coefficients & % Impervious are area weighted C=£.(Ci Ai)/At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's Flow-PDP.xls Cval 10.00 9.00 8.00 7.00 a m i c 6.00 ( Co 5.00 W H Z 4.00 J J Q LL 2 3.00 C 2.00 1.00 0.00 4- 0.00 RAINFALL INTENSITY -DURATION -FREQUENCY CURVE 10.00 20.00 30.00 40.00 50.00 STORM DURATION (minutes) — 2-Year Storm - - - 10-Year Storrs —100-Year Stonn Figure RA-16 City of Fort Collins Rainfall Intensity -Duration -Frequency Curves (13) Section 5.0 is deleted in its entirety. (14) Section 6.0 is deleted in its entirety. (15) Section 7.0 is deleted in its entirety. (16) Section 7.1 is deleted in its entirety. (17) Section 7.2 is deleted in its entirety. (18) Section 7.3 is deleted in its entirety. (19) Section 8.0 is deleted in its entirety. (20) Table RA-1 is deleted in its entirety. RLol 60.00 Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt 0.95 Concrete 0.95 Gravel 0.5 Roofs 0.95 Recycled Asphalt 0.8 Lawns, Sandy Soil: Flat <2% 0.1 Average 2 to 7% 0.15 Steep >7% 0.2 Lawns, Heavy Soil: Flat <2% 0.2 Average 2 to 7% 0.25 Steep >7% 0.35 (4) A new Section 2.9 is added, to read as follows: 2.9 Composite Runoff Coefficient Drainage sub -basins are frequently composed of land that has multiple surfaces or zoning classifications. In such cases a composite runoff coefficient must be calculated for any given drainage sub -basin. The composite runoff coefficient is obtained using the following formula: ,f J(C;*A,) C = "t A (RO-8) Where: C = Composite Runoff Coefficient C; = Runoff Coefficient for Specific Area (A) A; = Area of Surface with Runoff Coefficient of C;, acres or fee t2 n = Number of different surfaces to be considered At= Total Area over which C is applicable, acres or feet2 (5) Anew Section 2.10 is added, to read as follows: 41 1 III I OMM I J6' NCP A1M.197JI 111,.19573 lNv/)196d624'AP lNV /$I I9666 21' IMP 9:J I �,. 1?" PIC� \ lNV (f) /I AYAI(ABIC I L� I I /I l \. \/NV.,965 ] I I II I I I, I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I I I I I L_____J I IL \ I I \ �\ I. iRIENOEDJ� - - l OR IEIENnp II 1 ] BA N QOGG\ \ N(LMY 1[1L fAAt� /v 11 �.__.-ae�>•� I'f///i� � i/i �-..ate_ _ � ��\�� \I - I �I cb�� I / I I I I / \\ \\•\\-t / \\ \\ \ i 4H51 I---' I P 1 0 F — l I--- I _I I I I I I I I I I I I I s ro fb}- \ \ __ s'41 � \r )TIENOED iDEIENTW BASIN B P� YC / Mc) I. \ K9) \ // FPI / ___I I_ Iy I I I I I �l 1 O T 6, O \^ I I I I I I I I 0 I III N � I I / \o 0 A 0 / \\ \\\ / /.A�/ \ \ / � A 40 20 0 40 80 SCALE: 1"= 40' LEGEND EXISTING MINOR CONTOUR _XXXX� EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR --40001_ PROPOSED MAJOR CONTOUR PROPOSED DIRECTION OF OVERUND FLOW PRONSED DRAINAGE BASIN DIVIDE LINE A DRAINAGE BASIN ID MAJOR STORM RUNOFF COEFFICIENT DRAINAGE BASIN AREA. ACRES Fr JIT CONSTRUCTION ENTRANCE O` SILT FENCE P-1 ` IP_2 OJ STORM DRAIN INLETPROTECTON •(S) ` WATTLE (SWALE. ETCH. OR VEGETATED FLOWUNE) WATTLE (GUTTER PROTECTONI NOTES: 1. SEE DETAIL SHEET 5 (DT-5) FOR SPILLWAY CROSS SECTIONS CALL UTILITY NOTIFICATION CENTER OF COLORADO 811 CAL 2-BUSINESS DAYS IN ADVANCE BEFORE W)U OIC. GRADE. CR EXCAVATE FOR THE MARKING OF UNDERGRWND MEMBER UTUTES. DRAINAGE SUMMARY TABLE C..N. TdbNM Afi. C(2) c(101 CI100) fs(21 t9110) tc I1N) Opryel 116NOt 2 211w)mt Wli..ln lnl p. Im FI Iminl It CI Nt.l In.l A ISWI AIS1Y IN 0]9 O]3 OM 130 120 If. 10 I.] .5 B(NW) B(MN ].IB 0.6 OAB I J %O H Z z g w 0 R J 0. X 0 U. JU. m a G J W 0 Q Ir W U wwX . C u. J> O)> Of a 0) Cl 0 p 0 a \ p U U a PRDJ.N0. 11]}105 DR APPENDIX B HYDROLOGIC COMPUTATIONS oWns FCMaps GIs 0.5 0 0.27 0.5 W GS_1984_W eb_Mercator_Auxi liary_Sphere City of Fort Collins - GIS This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. Legend FEMA Floodplain ■ FEMA High Risk - Floodway ❑ FEMA High Risk - 100 Year ❑ FEMA Moderate Risk -100 / City Floodplains . City High Risk - Floodway ❑ City High Risk -100 Year ❑ City Moderate Risk -100 Year ❑ Parks ❑ Natural Areas L� City Limits Notes T7N R69W LAKESHERWOOD HORSETOO ITE �i■■m■►///7l//QI WARREN PARK SECTION 36 31 NONE mom p AY] COLLINDALE GOLF COURSE WARIEN LAKE (mil U Q a 0 MVG MORNINGSTAR m VICINITY MAP SCALE: 1 '=1000' APPENDIX A VICINITY MAP, AND FLOODPLAIN MAPS A 5. CONCLUSIONS 5.1 Compliance with Standards All computations that have been completed within this report are in compliance with the COFC Storm water Criteria Manual, the COFC Master Drainage Plans, and the COFC floodplain regulations. All floodway information is in compliance with Chapter 10 of the City of Fort Collins Municipal Code and all State and Federal regulations. 5.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater quantity and quality treatment of proposed impervious areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 6. REFERENCES 1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated June 2001, and Volume 3 dated September 1999. 3. ICON Engineering, Inc., "McClelland's Creek Master Drainage Plan Update", dated November 20, 2000 (Revised March 2003). 4. Kumar & Associates, Inc., "Geotechnical Engineering Study Proposed MVG- Morningstar Assisted Living and Memory Care Facility Northwest Corner of East Horsetooth Road and Lochwood Drive, Fort Collins, Colorado" dated November 12, 2013 and a Supplemental Memorandum December 10, 2013. 8 areas carrying flow away from the building or sheet flow over -top the sidewalk. Remaining Sub -basin A flow will be collected and routed through a Grass Swale along the south edge of the property and two (2) Gravel Dry Wells in the bottom of the Extended Detention Basin A, which is located just southwest of the proposed building. Once the run-off is treated, the outlet structure discharges into the existing concrete channel to the west of the site, eventually reaching McClelland's Channel. Sub -Basin A is calculated to have a 2-year, 10-year, and 100-year discharges of 1.0, 1.7, and 4.5 cfs, respectively. Sub -Basin B includes the remaining approximately 3.18 acres located northeast of Sub - basin A within the site, including the north half of the proposed building downspouts. A portion of the east side building down -spout run-off as well as that immediately adjacent to the southeast side of the proposed building will be collected in a proposed Grass Swale before entering the site's private storm drain system. The north side building down -spout run-off as well as that immediately adjacent to the north, northeast, and northwest sides of the building shall sheet flow to the northwest to the proposed Extended Detention Basin B. Parking and access road run-off will sheet flow to the northwest or enter the site's storm drain system, which also drains into Extended Detention Basin B. Several rows of parking spaces are proposed to be constructed with Pervious Pavers to treat small areas of runoff. Once the flow reach Extended Detention Basin B they are again treated and released through a water quality outlet structure into the existing drainage ditch flowing northeast into McClelland's Channel. Sub -basin B is calculated to have a 2-year, 10-year, and 100-year discharges of 2.8, 4.8 and 12.3 cfs, respectively. 4.3 Drainage Summary The percent impervious weighted average of the entire site is 48.7%. All proposed site runoff follows existing drainage flow patterns while adding a level of water quality to the discharge. Drainage facilities located outside of the right of way (including the rain garden, water quality pond, proposed storm sewer system and the detention basin outlets) will be maintained by the owners of the property. The property owner shall also be responsible for maintaining the portion of the common drainage channel located on the subject property. 7 the City of Fort Collins Drainage Criteria. 3.5 Floodplain Regulations Compliance No work is proposed within an existing floodplain. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The proposed MVG-Morningstar site was designed to treat run-off as close to the point - source as possible, while also minimizing the length of drainage routing to the most feasible extents of the site. The proposed site shall be divided into two sub -basins based on design points A and B. The proposed drainage design follows the existing drainage pattern of southeast to northwest. The project will consist of an Assisted & Memory Care Complex building with a footprint of approximately 43,000 SF, a parking area for patients and employees, an access lane, sidewalks and landscaped areas. Proposed site run-off is directed to a series of LIDs and an extended detention basin at one of the two design points before being released off -site. Each extended detention basin shall be equipped with a Water Quality Outlet Structure, designed specifically for that sub -basin, to treat and release the run-off into the existing concrete ditch at or below historic run-off rates. Both of the extended detention basins serving as water quality basins shall also act as on - site detention areas for the proposed construction. The on -site detention shall hold the proposed 100-year run-off and release it at the historic 2-year storm release rate. 4.2 Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Sub -Basin A includes the southern portion of the property, excluding the existing drainage ditch, and the south half of the downspouts from the proposed building, and is approximately 1.24 ac. From the downspouts, flow will be routed through vegetated 6 0.02 ac-ft and 0.06 ac-ft, respectively. Water quality volumes for both basins shall be provided in the proposed designs of Extended Detention Basins A and B. Final water quality volumes are presented in the Appendix D and calculated using the method recommended in the "Urban Storm Drainage Criteria Manual". 3.4 Hydraulic Criteria Using methods described in the City of Fort Collins Drainage Criteria, it was determined that Sub -basins A and B are required to detain 0.11 and 0.36 ac-ft respectively, in addition to the water quality volumes referenced in section 3.3 of this report. Sub -Basin A The proposed Extended Detention Basin A meets the water quality requirement for storage at elevation 4968.50 and the 100-yr storm detention at elevation 4969.70. A 5 foot long spillway shall be constructed at elevation 4970.00. A water quality outlet structure shall be utilized in releasing flows at or below historic rates into an 18" RCP culvert that shall discharge into a proposed Rip Rap lined channel before entering the existing concrete channel along the west boundary of the site. Sub -Basin B Runoff from the existing adjacent roadways shall be collected in a proposed Type `R' Inlet along Lochwood Drive, south of the northernmost Morningstar site access. This runoff will be piped in 18" and 24" RCP pipes in the site's storm drain system to the Extended Detention Basin B. Downspout runoff from the southeast portion of the building as well as that runoff adjacent to the southeast portion of the building will be collected in a small proposed rain garden infiltration area before entering the site's storm drain system. Runoff from the parking areas and the runoff adjacent to the northeast, north, and northwest sides of the building shall sheet flow overland toward Extended Detention Basin B. The proposed Extended Detention Basin B meets the water quality requirement for storage at elevation 4964.50 and the 100-yr storm detention at elevation 4967.00. A 13 foot long spillway shall be constructed at elevation 4967.40. A water quality outlet structure shall be utilized in releasing flows at or below historic rates into a 24" RCP culvert which shall discharge into a proposed Rip Rap lined channel before entering the existing concrete channel to the northwest of the site. All hydraulic calculations are presented in Appendix C and prepared in accordance with 5 spout runoff before conveying the water to the second water quality treatment basin. Pervious Pavers are located within Sub -basin B upstream of Extended Detention Basin B to help reduce total runoff by allowing water to infiltrate. Extended Detention Basin B also shall be equipped with a Water Quality Outlet Structure designed to allow sediments to settle while releasing treated flows at or less than historic rates. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Rip -Rap shall be used at the outlet of both Extended Detention Basins as well as the two points where a majority of water will enter Extended Detention Basin B. The Rip Rap shall be stabilized in place. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post - construction runoff control and pollution prevention / good housekeeping. It will be the responsibility of the contractor to develop a procedural best management practice for the site. 3.3 Hydrologic Criteria Runoff computations were prepared for the 2-year and 10-year minor and 100-year major storm frequency utilizing the rational method. The Modified FAA method was used to determine preliminary detention volumes for the proposed extended detention basins. All hydrologic calculations associated with the basins are included in Appendix B of this report. Sub -Basin A will encompass 1.24 acres, 38% of which will be impervious, and is calculated to have 2-year, 10-year, and 100-year discharges of 1.0, 1.7, and 4.5 cfs, respectively. Sub -basin B will encompass 3.18 acres, 47% of which will be impervious, and is calculated to have 2-year, 10-year, and 100-year discharges of 2.9, 4.9 and 12.5 cfs, respectively. The water quality storage volumes in Sub -basin A and Sub -basin B were calculated to be 4 for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). See the LID Area Exhibit in Appendix D. Runoff for the site will be split around the proposed building's southeast corner to the west and north, respectively. Sub -Basin A Runoff directed to the west will be routed south of the building through a Grass Swale to an extended detention basin, herein referred to as "Extended Detention Basin A" equipped with a Water Quality Outlet Structure which will release flow into the existing concrete drainage ditch along the west edge of the property. Extended Detention Basin A will also be constructed with Gravel Dry Wells along the flow line of the basin to help slow the basin's time of concentration and serve as supplemental Low Impact Development (LID) measures. Sub -Basin B Runoff directed to the north will be routed through another Grass Swale thereby reducing runoff from impervious surfaces over permeable areas to slow runoff and increase the time of concentration and promote infiltration. Runoff from portions of the parking lot shall drain across Pervious Pavers before entering a second extended detention basin, herein referred to as "Extended Detention Basin B". Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release Sub -Basin A Extended Detention Basin A utilizes a Grass Swale, Gravel Dry Wells and a Water Quality Outlet Structure designed to allow sediments to settle while releasing treated flows at or less than historic rates. Sub -Basin B A Grass Swale located southeast of the main building entrance shall collect the down- tj 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the McClelland's Creek Master Drainage Basin. The entire site currently drains to an existing concrete drainage ditch along the west and northwest property boundary. James H. Stewart and Associates performed a drainage study on this drainage in March of 1978 and determined the 100-year storm to produce 217.0 cfs. However, the updated 2010 SWMM model for the basin shows a 2-year storm run-off of 20.6 cfs and a 100-year storm run-off of 150.2 cfs. See Appendix B for existing site hydrologic computations. 2.2 Sub -basin Description The existing site has a historic runoff of 1.7 cfs and 6.7 cfs for the 2-year & 100-year run- off event, respectively, with a historic 2-year release rate of 0.39 cfs/acre. The site will be divided into 2 sub -basins for proposed construction activities. Sub -basin A will consist of approximately 1.24 ac and will be collected in a small extended detention basin located southwest of the proposed building before releasing into the existing drainage ditch to the west. Sub -basin B consists of approximately 3.18 ac and drains to the northwest corner of the property where it will be collected in a second extended detention basin before releasing into the existing concrete drainage ditch west of the property. Once the run-off enters the existing ditch, it will flow northeast eventually reaching McClelland's Channel. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual" specifications. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Development Criteria Reference and Constraints Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process 2 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The MVG-Morningstar Assisted & Memory Care Project development is located in southeast Fort Collins. It is located in the Southwest Quarter of Section 30, Township 6 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in Appendix A. The project is located west of Lochwood Drive, north of E. Horsetooth Road, and bounded on the west and north sides by existing residential lots. An existing drainage ditch with an existing 25 ft Drainage Easement runs along the west edge of the property, dividing it from the residential properties. 1.2 Description of Property The property consists of approximately 4.42 acres of land. The existing land currently drains from southeast to northwest at approximately a 2% grade. The land is currently vacant with mild sloping terrain and covered with natural dry -land vegetation across the entire site. The only offsite flow entering the site is through an existing concrete drainage ditch originating at the Southwest corner of the property and conveys runoff to the northeast. There is an existing 25' drainage easement accompanying the existing concrete ditch, extending from the existing flowline 25' to the west. An additional 25' drainage easement is proposed, extending from the flowline 25' to the east, to make the entire Drainage Easement 50' wide up to the Tract A -Utility & Drainage Easement. The channel is not mapped by FEMA, but the project is located in Zone X of FEMA FIRM Panel 08069C 1000F. The Geotechnical Report and Supplemental Memorandum by Kumar and Associates dated November 12, 2013 and December 10, 2013, respectfully, indicate the presence of groundwater at approximate depths of 8 to 9 feet below existing grade. However, based on the recommended drilled pier design, a building perimeter drain system is not required. The poorly draining onsite materials do present the need for a supplementary underdrain system for the proposed site LID's. I TABLE OF CONTENTS TABLEOF CONTENTS............................................................................................................ iii 1. GENERAL LOCATION AND DESCRIPTION................................................................ 1 1.1 Location...........................................................................................................................1 1.2 Description of Property................................................................................................. 1 2. DRAINAGE BASINS AND SUB-BASINS.......................................................................... 2 2.1 Major Basin Description................................................................................................ 2 2.2 Sub -basin Description.................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA...................................................................................... 2 3.1 Regulations......................................................................................................................2 3.2 Development Criteria Reference and Constraints...................................................... 2 3.3 Hydrological Criteria..................................................................................................... 4 3.4 Hydraulic Criteria.......................................................................................................... 5 3.5 Floodplain Regulations Compliance............................................................................. 6 4. DRAINAGE FACILITY DESIGN....................................................................................... 6 4.1 General Concept............................................................................................................. 6 4.2 Specific Flow Routing.................................................................................:.................. 6 4.3 Drainage Summary........................................................................................................ 7 5. CONCLUSIONS.................................................................................................................... 8 5.1 Compliance with Standards.......................................................................................... 8 5.2 Drainage Concept........................................................................................................... 8 6. REFERENCES...................................................................................................................... 8 APPENDIX VICINITY MAP AND FLOODPLAIN MAPS......................................................................... A HYDROLOGIC COMPUTATIONS..........................................................................................B HYDRAULIC COMPUTATIONS..............................................................................................0 WATERQUALITY..................................................................................................................... D iii December 23, 2013 Mr. Wes Lamarque City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Final Drainage Report for MVG-Morningstar Assisted & Memory Care Project Dear Wes, I am pleased to submit for your review and approval, this Final Drainage Report for the MVG- Morningstar Assisted & Memory Care Project development. I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Mark Morrison, E.I.T. ii Reviewed By: Robert Almirall, P.E. Colorado Professional Engineer No. 33441 •4 n FINAL DRAINAGE REPORT MVG-MORNINGSTAR ASSISTED & MEMORY CARE PROJECT, : ) Prepared by: Interwest Consulting Group 1218 West Ash, Suite C Windsor, Colorado 80550 (970)674-8488 Prepared for: MVG — MS (Fort Collins) LLC, A Colorado Limited Liability Company c/o MVG Development 1509 York Street Denver, CO 80206 December 23, 2013 Job Number 1173-105-00