HomeMy WebLinkAboutLOFTS AT CAMPUS WEST (THE) - PDP/FDP - 28-97 - SUBMITTAL DOCUMENTS - ROUND 5 - DRAINAGE REPORTAPPENDIX IV
Stuffer Envelope
Existing Conditions Plan
Grading Plan
Drainage and Erosion Control Plan
Alley Plan and Profile
Variance Request Letter
.iLE 5
CIRCULAR PIPE FLOW CAPACITY
Full Floor (cubic feet per second)
Mannings "n"= 0.013
Dia. *Conv. % Slope (feet per 100 feet)
(in.) Factor 0.02 0.05 0.10 0.20 0.35 0.50 0.75 1.00 1.25 1.50 1.75 2.0 2.5 5.0 10.0 20.0
3 0.884 0.012 0.020 0.028 0.040 0.052 0.062 0.077 0.088 0.099 0.11 0.12 0.12 0.14 0.20 0.28 0.40
4 1.903 0.027 0.043 0.060 0.085 0.113 0.135 0.165 0.190 0.213 0.23 0.25 0.27 0.30 0.43 0.60 0.85
5 3.451 0.049 0.077 0.109 0.154 0.204 0.244 0.299 0.345 0.386 0.42 0.46 0.49 0.55 0.77 1.09 1.54
6 5.611 0.079 0.125 0.177 0.251 0.332 0.397 0.486 0.561 0.627 0.69 0.74 0.79 0.89 1.25 1.77 2.51 .
8 12.084 0.171 0.270 0.382 0.540 0.715 0.854 1.047 1.208 1.351 1.48 1.60 1.71 1.91 2.70 3.82 5.40
10 21.91 0.31 0.49 0.69 0.98 1.30 1.55 1.90 2.19 2.45 2.68 2.90 3.10 3.46 4.90 6.93 9.80
12 35.63 0.50 0.80 1.13 1.59 2.11 2..52 3.09 3.56 3.98 4.36 4.71 5.04 5.63 7.97 11.27 15.93
15 64.60 0.91 1.44 2.04 2.89 3.82 4.57 5.59 6.46 7.22 7.91 8.55 9.14 10.21 14.44 20.43 28.89
18 105.04 1.49 2.35 3.32 4.70 6.21 7.43 9.10 10.50 11.74 12.87 13.90 14.86 16.61 23.49 33.22 46.98
21 158.45 2.24 3.54 5.01 7.09 9.37 11.20 13.72 15.85 17.72 19.41 20.96 22.41 25.05 35.43 50.11 70.86
24 226.22 3.20 5.06 7.15 10.12 13.38 16.00 19.59 22.62 25.29 27.71 29.93 31.99 35.77 50.59 71.54 101.17
27 309.70 4.38 6.93 9.79 13.85 18.32 21.90 26.82 30.97 34.63 37.93 40.97 43.80 48.97 69.3 97.9 138.5
30 410.17 5.80 9.17 12.97 18.34 24.27 29.00 35.52 41.02 45.86 50.24 54.26 58.01 64.85 91.7 129.7 183.4
36 666.98 9.43 14.91 21.09 29.83 39.46 47.16 57.76 66.70 74.57 81.69 88.23 94.33 105.46 149.1 210.9 298.3
42 1006.1 14.23 22.50 31.82 44.99 59.5 71.1 87.1 100.6 112.5 123.2 133.1 142.3 159.1 225.0 .318.2 449.9
48 1436.4 20.31 32.12 45.42 64.24 85.0 101.6 124.4 143.6 160.6 175.9 190.0 203.1 227.1 321.2 454.2 642.4
* Conveyance Factor = (1.486 x R2/3 x A) / n
Table 3-3
RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS
Character of Surface Runoff Coefficient
Streets Parking Lots, Drives:
Asphalt 0.95
Concrete 0.95
Gravel 0.50
Roofs 0.95
Lawns, Sandy Soil:
Flat < 2%
0.10
Average 2 to 7%
0.15
Steep > 7%
0.20
Lawn, Heavy Soil:
Flat < 2%
0.20
Average 2 to 7%
0.25
Steep > 7%
0.35
Table 3-4
RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS
Storm Return Period Frequency Factor
years Cf
2-10 1.0
11-25 1.1
26-50 1.20
51-100 1.25
Note: The product of C times Cf shall not exceed 1.0
tables
DRAINAGE CRITERIA MANUAL' RUNOFF
50
F-
20
Z
W
U
cc
w
a
10
z
;
h
a
OJ
5
w
3
O
U
2
r..
c
W
3
1
,■
►1■�
,■■ I I
s■��■■
���I�
�■■■��
����
ONE
I■■ENson
MEN
loll
.�...■.�..►
.►�■.
■■■�■
FA
FARWIN
E
54
L .J .3 l 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR
USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING"UNDEVELOPED"
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
5 =1-84
URBAN DRAINAGE & FLOOD CONTROL DISTRICT
APPENDIX III
Charts & Figures
No Text
APPENDIX III
Charts & Figures
October 24, 1997
Project No. 1590-01-97
Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS:
The Lofts at Campus West; Fort Collins, Colorado
A. An erosion control security deposit is required in accordance with City of Fort Collins
policy (Chapter 7, Section C : SECURITY; page 7.23 of the City of Fort Collins
Development Manual). In no instance shall the amount of the security be less than
$1000.00.
1. According to current City of Fort Collins policy, the erosion control security deposit
is figured based on the larger amount of 1.5 times the estimated cost of installing
the approved erosion control measures or 1.5 tunes the cost to re -vegetate the
anticipated area to be disturbed by construction activity.
The cost to install the proposed erosion control measures is approximately
$600.00. Refer to the cost estimate attached in Appendix I. 1.5 times the cost
to install the erosion control measures is $ 900.00.
ii. Based on current data provided by the City of Fort Collins Stormwater Utility,
and based on an actual anticipated net affected area which will be disturbed by
construction activity (approximately 1.24 acres), we estimate that the cost to re -
vegetate the disturbed area will be $ 788.64 ($ 636.00 per acre x 1.24 acres)..
1.5 times the cost to re -vegetate the disturbed area is $ 1,182.96. The $ 636.00
per acre for re -seeding sites of less than 5 acres was established by the City of
Fort Collins Stormwater Utility staff.
CONCLUSION:
The erosion control security deposit amount required for The Lofts at Campus West will
be $ 1,182.96.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1
October 24, 1997
Project No. 1590-01-97
Basil Hamdan
City of Fort Collins Storm Water Utility
P.O. Box 580
Ft. Collins, Colorado 80522
Re: The Lofts @ Campus West; Fort Collins, Colorado
Dear Basil,
Attached is the erosion control security deposit estimate for The Lofts @ Campus West
project.
ESTIMATE 1:
7 Haybale Barriers @ $75.00 each
1 - Gravel Inlet filter @ 75.00 each
TOTAL ESTIMATED COST:
ESTIMATE 2:
re -vegetate the disturbed area of 1.24 acres at 636.00 per acre
TOTAL ESTIMATED COST:
$ 525.00
$ 75.00
$ 600.00
x 1.50
$ 900.00
788.64
$ 788.64
x 1.50
S 19182.96 .
In no instance shall the amount of the security be less than $1000.00. Therefore, the total
required erosion control security deposit for Lofts @ Campus West expansion will be $1,182.96.
If you have any questions, please call at 226-5334.
Sincerely,
Mark Oberschmidt
Shear Engineering Corporation
Meo / MO
cc: John Donaldson, Timberline Property Management
Jean Pakech, City of Fort Collins Stormwater Utility
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311
EFFECTIVENESS CALCULATIONS
PROJECT: Lofts O Campus West
BY: MARK OBERSCHMIDT
STANDARD FORM B
PROJ. NO 1590-01-97
DATE 11/10/98
EROSION CONTROL C-FACTOR P-FACTOR COMMENT
METHOD VALUE VALUE
ROUGHENED GROUND 1.00 0.90 ROOF AREAS
HAYBALES 1.00 0.80
ASPHALT/CONCRETE. 0.01 1.00
SOD 0.01 1.00
MAJOR PS SUB AREA CALCULATIONS
BASIN %- BASIN acre AREA C P
ALL 80.30% B 1.24 ROOF 0.20 ACRES 1.00 0.90
BASIN B = Bl+B2 SOD 0.30 ACRES
EQUATIONS ASPHALT 0.74 ACRES
C = WEIGHTED AVG OF C X AREA, CHECK 1.24
P = (WEIGHTED AVG OF P X AREA) X C = 0.1697
EFF = (1 - P X C) X 100 P = 0.7871
EFF 86.64%
TOTAL AREA = 1.24 ACRES
OVERALL EFFECTIVENESS = 86.64% >
CONCLUDE EROSION CONTROL PLAN IS EFFECTIVE
80.30.
0.01 1.00
0.01 1.00
Page 2 of 2
RAINFALL PERFORMANCE STANDARD EVALUATION
PROJECT: Lofts @ Campus West PROJECT # 1590-01-97 STANDARD FORM A
COMPLETED BY: MARK OBERSCHMIDT DATE: 11/10/98
DEVELOPED ERODIBILITY Asb Lab Ssb Lb Sb PS
SUBBASIN ZONE (ac) (ft) (%;) (feet) M M
n mnnnnnmv 1 9a 4Qn nn 1.92 608 2.38
BASIN B INCLUDES B1 AND B2
Totals 1.24 490.00 1.92
LINEAR INTERPOLATION
SLOPE
LENGTH 1.50 1.92 2.00
400 79.1 80.11 80.3
490.00 80.30
500 79.4 80.32 80.5
CONCLUDE: PERFORMANCE STANDARD = 80.30%
EROSION CONTROL PLAN OVERALL EFFECTIVENESS MUST EXCEED THIS
Page 1 of 2
APPENDIX II
Erosion Control Calculations
Erosion Control Cost Estimate
Erosion Control Security Document
Developed Section H-H
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet Developed Section H-H
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.009900 ft/ft
Water Surface Elevation 27.98 ft
Discharge 30.48 cfs
30.0
-----r-----r-----------------r-----I------r-----r-----r----- -----�
I I 1 1 1 I I
I
1
1
1
I I 1 1 1 1 1
I
1
1
I
1 I 1 I 1 1 1
1
1
1
I
I I I 1 1 1 I
1
1
1
1
I I 1 1 1 1 I
1
1
1
1
1 I I 1 I I I
t
1
I
1
I 1 I 1 1 1 I
1
1
1
1
I I I I 1 I 1
I
1
1
1
1 I 1 I I 1 1
I
1
1
I
I 1 1 ___--1----- '------1 I 1
1
I
1
1 II 1 I 1 1
1
1
I
1
1 I I I I 1 1
I
1
1
I
I I I 1 I 1 1
1
1
1
t
I I I 1 1 I 1
1
1
1
1
I I I 1 1 I I
1
1
1
I I I I 1 I I
I
I
1
I 1 I I I 1 1
I
1
1
1 1 I I I 1 I
I
I
I
1
1 t t I I I I
I
11
1
1 I I I 1 1 I
1
1
1
1
----- I I I 1 I I I I 1
I 1
I I I I 1 1 1
1
1
1
1
W
C
1 I 1 I 1 I I
1 I I 1 1 1 I
I
1
I
I
1
1
1
1
Q
I I I 1 1 I
1
I
I
I
I I I 1 1 I I
1
I
I
1
N
I I I I I 1 I
1
I
I
1
a)
I I I 1 I 1 I
1
I
I
I
I I 1 I I I I
1
1
1
I
t/.I
I 1 1 I I I 1
I
1
1
1
-----L----- 1-
---1__-__J
I I 1 I 1 I I
I
1
1
I
I I I 1 I I I
I
1
1
1
I 1 I 1 1 1 I
I
1
I
1
I 1 I 1 1 1 I
I
I
I
1
I I 1 I 1 I
1
I
1
I
I 1 I I I I
1
1
I
I I I I 1 I 1
I
I
1
I 1 I I 1 I I
1
I
I
I I I I I I I
I
I
1
I
I I I 1 1 1 I
I
I
I
I
1
1 I I I 1 I I I
J-----_ L----- L----
I I
1____-1-____J
I 1 I I I 1 I
1
1
1
1
I I 1 I 1 I I
I
I
I
1
I I 1 I 1 I 1
1
1
I
1
I I I 1 I 1 I
1
1
1
I
I I
I
1
I
1
1 I I I 1 1 I
I
I
I
1
I I I 1 I I
I
I
1
I I I t 1 1 I
I
1
1
I
I I 1 I I 1 I
I
1
1
1
27.5
0.0
5.0 10.0 15.0 20.0 25.0 30.0 35.0
40.0 45.0
50.0
55.0
Station (ft)
10/27/98
FlowMaster v5.13
01:26:09 PM
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708
(203) 755-1666
Page 1 of 1
Developed Section H-H
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Developed Section H-H
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Water Elevation
Input Data
Channel Slope 0.009900 ft/ft
Elevation range: 27.66 ft to 29.89 ft.
Station (ft) Elevation (ft) Start Station
0.00 29.00 0.00
7.00
28.00
9.00
27.77
29.00
27.76
34.00
27.66
42.00
27.70
44.00
28.00
53.00
29.89
Discharge
30.48 cfs
Results
Wtd. Mannings Coefficient
0.016
Water Surface Elevation
27.98
ft
Flow Area
8.66
ftz
Wetted Perimeter
36.79
ft
Top Width
36.76
ft
Height
0.32
ft
Critical Depth
28.03
ft
Critical Slope
0.005746 ft/ft
Velocity
3.52
ft/s
Velocity Head
0.19
ft
Specific Energy
28.18
ft
Froude Number
1.28
Flow is supercritical.
Notes:
End Station Roughness
53.00 0.016
Water will spread onto parking lot to the north for the design flow of 30.48 cfs. Water surface elevation does not
exceed the top of curb elevation along the existing fence line.
10/27/98 FlowMaster v5.13
01:26:04 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Developed Section G-G
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet Developed Section G-G
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.009900 ft/ft
Water Surface Elevation 27.87 ft
Discharge 30.48 cfs
60 •
29.5
C
0 28.5
(0
7
W
28.0
27.5
1 1 I 1 1 I I
1 1 1 1 1 1 1
I 1 I 1 1 1 1
I I 1 I I I 1
I I 1 I I I I
I I 1 1 1 1 I
I I 1 1 1 1 1
1 1 1 I 1
I 1 1 I I I I
1 1 I 1 1 1 1
I 1 I I I 1 1
I 1 I I 1 I I
I I 1 1 I I I
1 I 1 1 1 I I
I I I 1 I I 1
I I 1 I I 1 1
I 1 1
1 1 I 1 I 1 1
1 1 I I 1 1 I
I I I 1 1 I I
I I 1 1 I I I
I I 1 I 1 I I
I I I 1 1 I I
I I 1 1 1 I I
I I 1 1 I 1 1
1 1 1 1
I 1 I 1 1 1 1
I 1 I I 1 I 1
I I I I I 1 1
I I I 1 I I 1
I I 1 1 I I I
I I I 1 I I
I I I 1 1 I
I I I I 1 1
I 1 I 1 I 1 1
I I 1 1 1 1 1
I I I 1 I I I
I I I 1 1 1 I
I I I 1 1 1 I
I I I 1 I I 1
I 1 1 1 1 1 1
I I 1 I 1
I I 1 I 1 I I
I I 1 I I I I
I I I I 1 I I
I I 1 1 I I I
1 1 I I I 1 1
I 1 1 1 I 1 1
I I 1 1 1 1 1
I I 1 1 1 I I
27.01 I I
0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0
Station (ft)
10/27/98 FlowMaster v5.13
01:16:30 PM Haeslad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Developed Section G-G
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Developed Section G-G
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Water Elevation
Input Data
Channel Slope
0.009900 ft/ft
Elevation range:
27.40 ft to 29.80 ft.
Station (ft)
Elevation (ft) Start Station
0.00
29.00 0.00
22.00
28.00
42.00
27.52
44.50
27.40
47.00
27.51
57.00
27.58
68.00
29.80
Discharge
30.48 cfs
Results
Wtd. Mannings Coefficient
0.016
Water Surface Elevation
27.87
ft
Flow Area
8.09
ftz
Wetted Perimeter
31.09
ft
Top Width
31.05
ft
Height
0.47
ft
Critical Depth
27.93
ft
Critical Slope
0.005618
ft/ft
Velocity
3.77
ft/s
Velocity Head
0.22
ft
Specific Energy
28.09
ft
Froude Number
1.30
Flow is supercritical.
Notes:
End Station Roughness
68.00 0.016
Water will spread to north and east as it turns the corner. Water Surface Elevation will not exceed top of curb height
proposed for curb along fence line. See section F-F
10/27/98 FlowMaster v5.13
01:16:17 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Developed Section F-F- steps - capacity
Worksheet for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet Developed Section F-F- steps
Flow Element Irregular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Channel Slope
0.005000 ft/ft
Water Surface Elevation 28.46 ft
Elevation range: 27.43
ft to 30.08 ft.
Station (ft)
Elevation (ft) Start Station
0.00
28.46 0.00
0.00
27.96
12.00
27.43
25.50
28.74
26.50
28.74
26.50
29.41
27.50
29.41
27.50
30.08
Results
Wtd. Mannings Coefficient
0.016
Discharge
70.83
cfs
Flow Area
14.65
ft2
Wetted Perimeter
23.18
ft
Top Width
22.61
ft
Height
1.03
ft
Critical Depth
28.49
ft
Critical Slope
0.004416 ft/ft
Velocity
4.84
ft/s
Velocity Head
0.36
ft
Specific Energy
28.82
ft
Froude Number
1.06
Flow is supercritical.
Notes:
Developed Section includes 6" vertical curb in front of existing fence.
End Station Roughness
27.50 0.016
12/10/98 FlowMaster v5.13
12:45:46 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Developed Section F-F
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet Developed Section F-F
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005000 ft/ft
Water Surface Elevation 28.20 ft
Discharge 30.48 cfs
H
w
v
In
c• M
29.5
27.5
---------- r---------- n----------- 1----------- r.--_--_____r___-------n
I I I I 1 I
I I 1 1 I 1
1 I 1 I 1 1
I I I I 1 1
1 1 I 1 I I
1 1 I 1 I I
1 1 I 1 1 I
1 1 1 I
I 1 1 1 I
I I 1 1 1 I
I I I 1 1 I
I I 1 I 1 I
I I I I I 1
1 I I I I I
1 I I I I I
1 1 I 1 1 I
1 I I
1 1 1 I 1 1
1 I I 1 I I
I 1 1 I I
1 I I I I 1
I I I I I
I 1 I 1 1 I
1 1 I 1 I I
1 I I I 1 I
I 1 1 1 1
____-_--__}___---____a_______-_--1--_____---~----______i__________y
I 1 I I 1 1
I 1 I I 1 I
I I I 1 I 1
I I 1 I I 1
I 1
I I I
I = I 1 I 1 I
I 1 I I 1 I
1 1 I I I I
-_--______1---------- J-----------
__________L---------- j'_-_-______J
1 1 I 1 1
1 1 1 I I 1
1 1 1 I 1 1
1 1 1 I I I
I 1 I I I
1 1 1 I I I
1 I I 1 1 I
1 1 I 1 1 I
I 1 I 1 I 1
__-_______1____--___- ------- I----------- L---------- 1______-___J
1 1 I I I 1
I 1 I I 1 I
1 1 I I I I
I 1 1 I 1 I
1 I 1 I I I
I I 1 1 1 I
I 1 I I 1 I
I I 1 1 I I
1 1 1 1 I I
27.01 i i i I
0.0 5.0 10.0 15.0 20.0
Station (ft)
25.0 30.0
12/10/98
12:45:34 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.13
Page 1 of 1
Developed Section F-F
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Developed Section F-F
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Water Elevation
Input Data
Channel Slope
0.005000 ft/ft
Elevation range: 27.43
ft to 29.79 ft.
Station (ft)
Elevation (ft) Start Station End Station Roughness
0.00
28.46 0.00 27.50 0.016
0.00
27.96
12.00
27.43
16.50
28.24
27.50
29.79
Discharge
30.48 cfs
Results
Wtd. Mannings Coefficient
0.016
Water Surface Elevation
28.20
ft
Flow Area
7.73
ft2
Wetted Perimeter
16.61
ft
Top Width
16.29
ft
Height
0.77
ft
Critical Depth
28.20
ft
Critical Slope
0.004901 ft/ft
Velocity
3.94
ft/s
Velocity Head
0.24
ft
Specific Energy
28.44
ft
Froude Number
1.01
Flow is supercritical.
Notes:
Developed Section includes 6" vertical curb in front of existing fence.
12/10/98 FlowMaster v5.13
12:45:29 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Existing Section F-F
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section F-F
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005000 tuft
Water Surface Elevation 27.96 ft
Discharge 9.67 cfs
30.0
29.5
29.0
w
C
0 28.5
W
28.0
27.5
------- ---------------- ----
I I
1
1
1 I
1 1
1
1
1 I
t I
1
1
1 1
I 1
1
I
I 1
I 1
I
1
1 I
I I
I
1
I I
I I
1
I
1 1
I
1
1 1
t I
1
1
1
1 I
I 1
I
I
1
1 1
I 1
I
1
I
1 I
1 I
I 1
1
I
1 1
I 1
I I
1
I
1
I I
I I
I
1
I
1
I I
1 1
I 1
I
1
1 I
I 1
I
1
1 I
I 1
I
I
I I
I 1
1
I
I 1
I 1
1
I I
I 1
1
I
1 I
I I
I
1
I I
I I
1
I
1 I
1
1
1 1
I 1
I
1
I
1
1 I
I
I 1
I
1
1
I I
1 I
I 1
I
I
1 I
I 1
I I
1
1
I
1
I 1
I I
I
1
I I
1 1
I I
1
I
I 1
I
I I
I 1
I
1
1 I
I I
I
I
1 I
I
I
I
1 I
I I
1
1
I 1
I t
I
I
I I
I I
I
I
1 1
1
1
I
1 1
---------- 1---------- J_
1 I
_------ I----------- L---------- 1-______-_-J
I I I 1
I I
I
I
I
I I
I
I t
I
1
I
1
I I
1 I
I 1
I
1
1 I
I I
1
11
I
I I
I
1
1 I
t I
I
1
1 I
I I
I
1
I I
27.0 1 i i I I
0.0 50 10.0 15.0 20.0
Station (ft)
25.0 30.0
10/27/98
01:15:31 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.13
Page 1 of 1
Existing Section F-F
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section F-F
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient
0.016
Channel Slope
0.005000 ft/ft
Water Surface Elevation
27.96 ft
Discharge
9.67 cfs
30.0
29.5
29.0
w
c
a 28.5
m
N
W
28.0
27.5
___----___r__________,-----------I-----------r----------r-_-_______-
I 1 I I 1 1
I 1 I 1 1 1
I I 1 1 1 I
I I 1 I I I
I I 1 1 I 1
I I I 1 1 1
I 1 1 1 t 1
1 I 1 I 1 I
1 1 1 1 I
I I 1 1 I
I I I I I 1
I I I I I 1
I I 1 1 1 1
I 1 I 1 1 1
I 1 1 I 1 I
1 1 1 I 1 I
I I 1 1 1 1
1 1
I I 1 I I I
I I I I I I
I I 1 I I I
I I 1 I 1 I
I I 1 1 1
I 1 I I 1 1
I l 1 1 1 I
I 1 I 1 1 1
1 I I
I I I 1 1 I
I I I 1 I I
I I 1 I I I
I I 1 I 1 1
I I 1 I 1 1
I i 1 I I I
I 1 1 1 1 1
I I 1 1 I 1
I
I I I I I I
I I I I 1 I
I I I I 1 1
I I I 1 1
I I 1 I 1 1
I I I 1 I I
I 1 1 1 1 I
I I 1 I 1
---------- 1---------- J- ------- I----------- L---------- 1--______--J
I I I 1 I I
I I I I I 1
I I I I I I
I I 1 I I I
I I 1 I I 1
I I I I I I
I 1 I 1 1 1
I I 1 1 I I
I I 1 I I I
27.01
0.0 5.0 10.0 15.0 20.0
Station (ft)
25.0 30.0
10/27/98
01:15:31 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.13
Page 1 of 1
Existing Section F-F
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section F-F
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Channel Slope
0.005000 ft/ft
Water Surface Elevation 27.96 ft
Elevation range:
27.46 ft to 29.79 ft.
Station (ft)
Elevation (ft) Start Station
0.00
27.96 0.00
12.00
27.46
16.50
28.24
27.50
29.79
Results
Wtd. Mannings Coefficient
0.016
Discharge
9.67
cfs
Flow Area
3.72
ftz
Wetted Perimeter
14.94
ft
Top Width
14.88
ft
Height
0.50
ft
Critical Depth
27.94
ft
Critical Slope
0.006019
ft/ft
Velocity
2.60
ft/s
Velocity Head
0.11
ft
Specific Energy
28.07
ft
Froude Number
0.92
Flow is subcritical.
Notes:
End Station Roughness
27.50 0.016
Existing section not adequate for design flows. Install 6" vertical face curb in front of existing fence to redirect flows
down the alley.
10/27/98 FlowMaster v5.13
01:15:47 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Developed Cross Section E-E
Cross Section for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Developed Section E-E
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Water Elevation
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0,005300 ft/ft
Water Surface Elevation 28.07 ft
Discharge 30.48 cfs
30.5
r• •
29.5
29.0
C
O
N
W 28.5
28.0
27.5
27.01 '
0.0 5.0 10.0
1 1
I I 1
1 I 1
1 I I
1 I 1
1 I 1
-
------ = -- - -- - - - -- - - - - - I
1 I
1 1 1
I 1 1
I I I
-________- ____________J
1 1
I 1 I
1 1 1
1 I 1
I 1 1
1 I
1 1 I
1 _ _ _ _ _ _1
I I 1
I I 1
I I I
I I
'----------1 1
r I
1 I
1 I
I
I 1
I
I 1
1
1 I
I
1 1
-J-------------~------------4
1
I 1 I
--------- 1------------- r------------�
Station (ft)
I 1 I
I I I
I I
I I
1 I I
I 1 1
I I I
15.0 20.0 25.0
10/27/98 FlowMasler v5.13
01:13:50 PM Haestad Methods, Inc.. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Developed Cross Section E-E @ 0.5%
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet developed Section E-E slope
Flow Element Irregular Channel
Method Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005300 ft/ft
Water Surface Elevation 27.67 ft
Discharge 16.73 cfs
30.5-------------------------r------------ -------------r------------
I I I I 1
I I I I I
I I 1 I I
I I 1 I I
1 1 I I I
1 1 1 1 I
30.0-------
----------- '------ ------'
1 I I 1 I
I I I I I
I I I I 1
I I I I 1
I I 1 I I
29.5-------------+-------------1-------------ti-------------I------------�
I 1 1 I I
I 1 I 1 I
1 1 I 1 I
i I I 1 I
1 1 I I I
29.0------------'-------------I-------------'------------'--------------1
I I I I 1
w I I 1 I I
I 1 1 I I
1
.+ I I I I I
>
Q
W I I 1 I 1
I I I I I
28.0-------1--------I I
I I I I I
I I I 1 I
I I I I I
I I I I I
27.5 ---- -------a-------------------------------------------------
� I I I 1
I I I I I
I I I I I
I I I 1 I
I I I I
27.0------------i------- ---- r------------- i------------- r-------------I
I 1 1 I 1
I 1 1 I 1
1 1 I I i
I I • I 1 1
I I I 1 I
I I I I I
26.5
0.0 5.0 10.0 15.0 20.0 25.0
Station (ft)
10/28/98 FlowMaster v5.13
08:49:20 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Developed Cross Section E-E @ 0.5%
Worksheet for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet developed Section E-E slope
Flow Element Irregular Channel
Method Manning's Formula
Solve For Discharge
Input Data
Channel Slope 0.005300 ft/ft
Water Surface Elevation 27.67 ft
Elevation range: 26.91 ft to 30.50 ft.
Station (ft) Elevation (ft) Start Station End Station
0.00 27.67 0.00 25.00
9.00 26.91
14.00 28.00
17.50 29.00
25.00 30.50
Results
Wtd. Mannings Coefficient
0.016
Discharge
16.73
cfs
Flow Area
4.74
ftz
Wetted Perimeter
12.60
ft
Top Width
12.49
ft
Height
0.76
ft
Critical Depth
27.67
ft
Critical Slope
0.005206 ft/ft
Velocity
3.53
ft/s
Velocity Head
0.19
ft
Specific Energy
27.86
ft
Froude Number
1.01
Flow is supercritical.
Notes:
Roughness
0.016
Existing Section Not adequate - regrade and provide a 6" vertical face curb at building. Extend curb down the west
face of the Panhandlers building to the northern most door. Future doors will have to be constructed above the curb.
10/28/98 FlowMaster v5.13
08:49:06 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Dev. Cross Section E-E
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Developed Section E-E
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Channel Slope
Water Surface Elevation
Elevation range: 27.17 ft to 30.50 ft.
Station (ft) Elevation (ft)
0.00 28.17
0.50 28.17
0.50
27.67
7.00
27.47
9.00
27.17
14.00
28.00
17.50
29.00
25.00
30.50
0.008500 ft/ft
28.17 ft
sceNi,r)c, Z
Start Station End Station Roughness
0.00 25.00 0.016
Results
Wtd. Mannings Coefficient
0.016
Discharge
51.23
cfs
Flow Area
8.58
ft2
Wetted Perimeter
14.71
ft
Top Width
14.10
ft
Height
1.00
ft
Critical Depth
28.31
ft
Critical Slope
0.004473 ft/ft
Velocity
5.97
ft/s
Velocity Head
0.55
ft
Specific Energy
28.72
ft
Froude Number
1.35
Flow is supercritical.
Notes:
Regraded section with 6" vertical face curb adequate. Curb required because flow depth will be above base of curb.
Curb to extend to the northern door along the west side of the panhandlers building.
10/28/98 FlowMaster v5.13
09:01:57 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Dev. Cross Section E-E
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmwUofts.fm2
Worksheet
Developed Section E-E
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Water Elevation
Input Data
Channel Slope
0.005300 ft/ft
Elevation range:
27.17 ft to 30.50 ft.
Station (ft)
Elevation (ft) Start Station
0.00
28.17 0.00
0.50
28.17
0.50
27.67
7.00
27.47
9.00
27.17
14.00
28.00
17.50
29.00
25.00
30.50
Discharge
30.48 cfs
Results
Wtd. Mannings Coefficient
0.016
Water Surface Elevation
28.07
ft
Flow Area
7.14
ftz
Wetted Perimeter
14.23
ft
Top Width
13.73
ft
Height
0.90
ft
Critical Depth
28.08
ft
Critical Slope
0.004831 ft/ft
Velocity
4.27
ft/s
Velocity Head
0.28
ft
Specific Energy
28.35
ft
Froude Number
1.04
Flow is supercritical.
Notes:
End Station Roughness
25.00 0.016
Regraded section with 6" vertical face curb adequate. Curb required because flow depth will be above base of curb.
Curb to extend to the northern door along the west side of the panhandlers building.
10/27/98 FlowMaster v5.13
01:13:40 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Existing Cross Section E-E
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section E-E
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005300 ft/ft
Water Surface Elevation 27.67 ft
Discharge 2.70 cfs
30.5
30.0
29.5
w 29.0
C
O
W
u-
28.5
28.0
27.5
27.0
0
1027/98
01:11:24 PM
I 1
1 1 1
I I I
I I I
I 1 I
------------;-------------;---
1 1 I
1 I I
I 1 1
I I I
I I I
I I 1
I I 1
------------J------- - - - - --------- - - - - -J
1 1
1 1 1
1 I 1
1 1 1
1 1 1
I 1 I
I I I
-----I
I 1
I I I
1 1 1
1 I 1
I I 1
I I 1
- - - - - - - - - - -1 I
I I
1 1 1
1 1 1
1 1
1 I I
I I 1
I I 1
I I
I I I
1 I 1
1 1 1
1 1 I
I I I
I I 1
1
I 1
I I I
I I I
1 I I
I 1 1
I I 1
1 I
5.0 10.0 15.0 20.0 25.0
Station (ft)
FlowMasler v5.13
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Existing Cross Section E-E
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section E-E
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Channel Slope
0.005300 ft/ft
Water Surface Elevation
27.67 ft
Elevation range: 27.40 ft to
30.50 ft.
Station (ft) Elevation (ft)
Start Station End Station . Roughness
0.00
27.67
0.00 25.00 0.016
9.00
27.40
14.00
28.00
17.50
29.00
25.00
30.50
Results
Wtd. Mannings Coefficient
0.016
Discharge
2.70
cfs
Flow Area
1.52
ft'
Wetted Perimeter
11.27
ft
Top Width
11.25
ft
Height
0.27
ft
Critical Depth
27.65
ft
Critical Slope
0.007445
ft/ft
Velocity
1.78
ft/s
Velocity Head
0.05
ft
Specific Energy
27.72
ft
Froude Number
0.85
Flow is subcritical.
Notes:
Existing Section Not adequate - regrade and provide a 6" vertical face curb at building. Extend curb down the west
face of the Panhandlers building to the northern most door. Future doors will have to be constructed above the curb.
1027/98 FlowMaster v5.13
01:11:08 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Rebuilt Cross Section D-D for Qdesign
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section D-D
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005000 ft/ft
Water Surface Elevation 27.14 ft
Discharge 30.48 cfs
r
W
C
O
111
IU
W
_________________________------------ ------------- r------------
- �
I 1 1 I I
1 I I 1 1
1 1 1 I I
I 1 I I I
I--------1 I I I
1 1 1 1 I
1 I 1 1 I
1 I 1 I I
I I 1 1 I
1 1 I
I 1 I I
I I 1 I
I I 1 I
I 1 1 I I
1 I I
I I 1 1 I
I 1 1 1 I
1 1 I 1 I
1 I 1 1 1
1 1 1 I 1
1 I 1 1 1
1 I 1 1 I
I 1 I 1 1
I 1 I I I
I
I I 1 I 1
1 I 1 I I
I 1 I 1 I
I I I 1 I
1 I 1
I I I I I
I I I 1 1
I I I 1 1
I I I I I
I I
I I 1 I I
I I I 1 1
I I 1 I 1
1 1
a I 1
I I I I
1 I I I
1 1 1 I I
1 1 1 I I
1 1
I 1 I I I
I I I I 1
1 I 1 1
I 1 1 I
0.0 5.0 10.0 15.0 20.0 25.0
Station (ft)
09/15/98 FlowMaster v5.13
08:56:35 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Rebuilt Cross Section D-D
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section D-D
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient 0.016
Channel,Slope 0.005000 ft/ft
Water Surface Elevation 27.51 ft
Discharge 66.89 cfs
31.0-------------------------r-------------------------r------------�
1 I 1 I I
I 1 1 1 1
I I I I 1
I 1 I I 1
30.5-------------1-------------r---------------------------I---------- --I
I 1- I I 1
1 I I I I
1 1 1 1 I
1 I 1 1 1
30.0------------- ti------------- r------------ ;-------------I------------�
I I I I
1 1 1 I
1 1 I I 1
I I I I 1
29.5-------------I---------------------------------------- ---------------11
I I 1 1 1
1 1 1 I 1
1 1 1 1 I
29.0--------------------------------------------------------------------I
y 1 1 1 I 1
v 1 1 I I I
I 1 I 1 I
I I 1 I 1
1 1 I
0 28.5------------ -I ------------- ------------ J------------ 1------------- 4
I I 1 1
1 I I 1 I
I 1 I I I
1
W 28.0-------------- +--------------------------4------------ --------- - - - --+
I I 1 1 I
1 1 1 1 I
1 I 1 1 I
1 I 1 1 I
I I 1 I 1
27. - - - - -
~ - -
I
I I I I 1
I 1 1 I 1
I 1 I I I
1 I I 1 I
27.0----------- J------------- L------------J ------------ L------------J
I I I I
I I 1 I
I I 1 I 1
I I I I 1
I
I I I I 1
1 I I I I
1 I 1 1 I
I 1 1 I
I 1 1 I
26.0
0.0 5.0 10.0 15.0 20.0 25.0
Station (ft)
09/15/98 FlowMaster v5.13
08:45:17 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Rebuilt Cross Section D-D
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section D-D
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Channel Slope 0.005000 ft/ft
Water Surface Elevation 27.51 ft
Elevation range: 26.00 ft to 30.55 ft.
Station (ft) Elevation (ft) Start Station End Station
0.00 27.51 0.00 21.00
6.00 26.84
9.00 26.00
16.00 27.00
21.00 30.55
Results
Wtd. Mannings Coefficient
0.016
Discharge
66.89
cfs
Flow Area
12.53
ft2
Wetted Perimeter
17.10
ft
Top Width
16.72
ft
Height
1.51
ft
Critical Depth
27.55
ft
Critical Slope
0.004177 ft/ft
Velocity
5.34
ft/s
Velocity Head
0.44
ft
Specific Energy
27.95
ft
Froude Number
1.09
Flow is supercritical.
Notes:
Rebuilt alley @ section D-D is deeper and flatter along the flowline.
Capacity is adequate
Roughness
0.016
09/15/98 FlowMaster v5.13
08:46:23 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Existing Cross Section D-D for Qdesign
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section D-D
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005000 ft/ft
Water Surface Elevation 27.35 ft
Discharge 30.48 cfs
31.0 ------------ r------------------------- r------------
I 1 1 I I
I I 1 1 1
1 1 I I 1
1 1 1 1 I
I 1 1 1 1
30.5-------------'--------I--------------''-------------'--------------
1 1 I 1 I
1 1 I I I
1 I I 1 1
1 1 I 1 I
30.D ------------t------------- L------------J------------- ------------J
1 I 1 1 1
I I 1 1
1 1 I I
1 1 I I I
1 1 1 1 I
I I I 1
1 1 I I I
I I I I I
I I 1 1 I
1 I 1 1 1
Y 1 I I I 1
29.0 ' ' '
I 1 1 I
C 1 I I I I
O 1 1 I
1 1 I I I
28.5-------------- '------------- ------------J-------- ----'-------------' 1 IL 1 I I
(JJ 1 I 1 I 1
I I I I 1
I 1 1 1 I
I 1 1 I I
1
1 I I 1 I
I 1 I 1 I
I 1 I 1 I
1 I I I 1
I I 1 I I
I 1 1 - - - - - - - -1 1
I 1 1 I I
I I
I I I I I
1 1 I I I
27.0----------- '-------------I------------- ---------- ------------
26.5
I- r 1
I I 1 1 1
I 1 1 I 1
I 1 I 1 1
1 I 1 1 1
1 I I 1
26.5
0.0 5.0 10.0 15.0 20.0 25.0
Station (ft)
09/15/98
- FlowMaster v5.13
08:59:11 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Existing Cross Section D-D
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmwUofts.fm2
Worksheet
Existing Section D-D
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.009800 fttft
Water Surface Elevation 27.51 ft
Discharge 64.32 cfs
31.Or------------I------------- r------------ I ------------- r------------
1 1 I
I I
1 1 1
1 I
1 I 1
1 I
I
1 I I
1 1 I
1
I 1
30.5
-------------'-------------I--------------------------'---
-----------'
I I I
I I
I 1 1
1 1
1 I 1
1 I
1 1 1
1 I
I 1 1
I I
I 1 1
1 1
30.0
------------ J------------- L------------J-------------------------J
1 I I
1 1
1
1 1 I
I 1 1
I
I I I
1 1
I I I
I 1
I
1 1
29.5
------------i-------------------------------------F------------�
I 1 1
1 1
I 1 1
I I
1 1 I
1 I
I I I
I I
�29.0
' ----1 1
C
I I I
I
I I
I 1
O
I
I 1
Y
1 I I
I 1
(Q
1 I I
1 1
28.5--------------
'------------- '------------- J--------
----- '------------J
1 1 I
I 1
W
1 I I
I I
1 1 1
I I
1 I I
1 I
I I I
1 I
I I I
I I
28.0
------------------------------------- ------ ------------------
1 I I
I 1
I I 1
1 I
1 I I
1 1
I I I
I 1
1 1 I
I I
27.6
I
----1
1 = I I
1 1
1
I I I
I I I
1
I 1
I I I
1 1
1 I 1
I 1
27.0
-------------I-------------'
-----------
1
----------------------I
1 1 I
I 1
I I I
I I
I 1 I
1 I
1 I 1
1 I
I I
I I
26.5
0.0
5.0 10.0 15.0
2000 25.0
Station (ft)
09115/98 FlowMaster v5.13
08:39:43 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Existing Cross Section D-D
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Existing Section D-D
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Channel Slope
0.009800 f tft
Water Surface Elevation
27.51 ft
Elevation range: 26.51 ft to 30.55 ft.
Station (ft) Elevation (ft)
Start Station End Station Roughness
0.00 27.51
0.00 21.00 0.016
9.00 26.51
16.00 27.00
21.00 30.55
Results
Wtd. Mannings Coefficient 0.016
Discharge 64.32
cfs
Flow Area 9.97
ft2
Wetted Perimeter 16.95
ft
Top Width 16.72
ft
Height 1.00
ft
Critical Depth 27.69
ft
Critical Slope 0.004231 ft/ft
Velocity 6.45
fus
Velocity Head 0.65
ft
Specific Energy 28.16
ft
Froude Number 1.47
Flow is supercritical.
Notes:
This section is adequate as is. Capacity will be changed if the modifications noted in Alley rebuilt west section C-C
are completed because the section will become deeper and flatter. Refer to proposed section D-D for proposed
capacity
09/15/98 FlowMaster v5.13
08:41:04 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Section C-C - rebuilt - for Qdesign
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet Alley @ C-C - rebuilt west 10' wide
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005000 ft/ft
Water Surface Elevation 27.42 ft
Discharge 30.48 cfs
30.0
--------I--------r-------T----------------r--------1--------r-------
I 1 1 I 1 I I
I I I I 1 I I
I 1 1 I 1 I I
I 1 I I 1 I I
I 1 I 1 I I 1
1 I 1 1 1 1 I
1 I 1 1 I 1 1
29.5
--- - - - - -I I - - - - - - - I I- - - - - - - - I
I I I I I 1 1
I I I I I 1 I
I I 1 1 1 I 1
I I 1 I 1 I I
I I I I 1 I 1
I
29.0
I I I I I I
I I I I I I 1
--------- -------- I -------- 1-------- I-------- 1-------J--------L-------
1 1 I I I I I
I 1 1 1 1 I I
1 1 1 1 1 1 1
1 1 I 1 I 1 1
1 1 1 1 I 1 I
w28.5--------
=--------�-------T---------------T--------I-------- �-------
v
I 1 1 1 1 I 1
C
I I I I I I 1
I 1 I I I I 1
O
1
I I I I I I I
>
>
W 28.0
1 I I I I I I
------- --------I--------I-------I--------II-------I--------I--------
1 1
I I 1 1 1 1 I
I I I 1 1 I I
I I I I I I I
I I I I I I I
I 1 I I 1 I 1
I I I I I I I
1-------I 1 I ------I I I
I I I V7 I I I
1 1 I 1 I I
I 1 1 1 1 1 I
I 1 1 I 1 I I
I 1 1 I I
1
I I I I 1 I 1
27.0
- ------------ II --------r r - - - - - - -I- - - - - - - - r--- - - - --- -- - - - - -r- - -- - --
I 1
I I I I I
I I I I I I I
I I I I I I I
I I I 1 1 I
I I I I I 1 I
I I 1 1 I I I
26.5
I I 1 I I I 1
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0
Station (ft)
09/15/98 FlowMasler v5.13
09:01:34 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Section C-C - rebuilt
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Alley @ C-C - rebuilt west 10' wide
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005000 fttft
Water Surface Elevation 27.42 ft
Discharge 30.86 cfs
30.0 ----------------r-------T----------------T-------n--------r-------
1 1 I I I I I
1 1 I I 1 I I
I 1 I 1 1 I I
I I 1 I 1 I 1
I I 1 1 I I I
I I I I I 1 1
29.5 ' -------I -- ,- ' -------1------ -- -------- 1 r________I_ 7_____ I _______r_______
I I I 1 1 I I
1 I 1 1 I I I
I I I I I 1 1
1 1 I 1 I I 1
I 1 I I I I I
1 1 1 I 1 1 I
I 1 1 I I I 1
29.0-------- J-------- L_______1-------- I--------
L_______ J________ L_______
I I 1 1 I 1 I
I I I 1 1 1 I
I 1 I 1 I I 1
I 1 I 1 I I 1
1 I 1 I I I I
I I 1 I I I I
1 I I I I I I
28.5
v I I I I 1 I 1
1 1 1 1 I 1 1
C 1 1 1 1 I I 1
0 I 1 1
> 1 1
1
I X17
1 1 1 1 1 1 1
I I 1 I I 1 I
I 1 1 I I 1 I
1 1 I I I I 1
1 I I I I I I
I I I 1 1 I I
1 I 1 1
I 1 I # I I 1
1 I I 1 1 1
1 1 1 I I 1 1
I I I I I I I
I I I I I I
1 I 1 I 1 I 1
27.0 '-- - - - - -I 1-------1 I
I 1 I I I I I
1 1 I I I 1 I
I I I I I 1 1
1 I I I I 1
1 I 1 1 I I
I 1 I I 1 I
I 1 1 I I 1
26.51 I I I
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0
Station (ft)
16.0
09/15/98 .1 , .
08:43:43 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.13
Page 1 of 1
Section C-C - rebuilt west
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Alley @ C-C - rebuilt west 10' wide
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Channel Slope 0.005000 ft/ft
Water Surface Elevation 27.42 ft
Elevation range: 26.57 ft to 30.00 ft.
Station (ft) Elevation (ft) Start Station End Station Roughness
0.00 27.42 0.00 16.00 0.016
6.00 27.15
9.00 26.57
16.00 26.75
16.00 30.00
Results
Wtd. Mannings Coefficient
0.016
Discharge
30.86
cfs
Flow Area
7.81
ft2
Wetted Perimeter
16.73
ft
Top Width
16.00
ft
Height
0.85
ft
Critical Depth
27.42
ft
Critical Slope
0.005031 ft/ft
Velocity
3.95
ft/s
Velocity Head
0.24
ft
Specific Energy
27.66
ft
Froude Number
1.00
Flow is subcritical.
Notes:
This section rebuilds the western 10 feet of the alley up to the stoop or bottom of slope
Capacity does meet design flow
Additional concrete may be required at stoop
09/15/98 FlowMaster v5.13
08:44:15 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Section C-C - existing
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\lofts.fm2
Worksheet
Existing Alley @ C-C
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For Discharge
Section Data
Wtd. Mannings Coefficient 0.016
Channel Slope 0.005000 ft/ft
Water Surface Elevation 27.42 ft
Discharge 7.48 cfs
30.0
29.511
29.0
Y
v
C
w0 28.5
fll
N
W
28.0
27.5
1
1 I 1 1 I
1
1
I 1 1 1 1
1 �••
I
I 1 1 I I
1
1
1 I 1 1 I
I
-
I
1 I I I I
1
1
I I 1 1 1
1
I
1 1 I I I
1
I
1 I 1 1 I
1
1
I I I I 1
1
1
1 1 1 I 1
I
1
1 1 I I 1
I
1
1 I 1 I 1
1
I
I 1 I 1 I
1
1
1 I I I I
1
I
1 I 1 1 1
I
I
I 1 1 1 1
I
1
I 1 I I I
1
I
1 I I I 1
1
I
I 1 I 1 1
1
I
I 1 I 1 1
1
I
1 I I I I
1
I 1 I
1
I
I I I I I
1
1
I I I I I
I
I
1 I 1 I I
1
1
1 1 1 1 1
1
I
1 I I I I
1
I
1 I I I 1
I
I
I I 1 I I
1
1
I I I I I
1
I
I I I I I
I
1
I 1 I 1 1
I
1
I I 1 1 1
1
1
1 I 1 I 1
1
I
I 1 1 1 I
1
1
I
I
I 1 I 1 I
I 1 1 1 I
I I
1
I
1
1
I I I
I 1 I I I
I I 1
1
1
I 1
I
L_______
X47 1 I
I
27.01 1 1
0.0 2.0 4.0 6.0 8.0 10.0 12.0
Station (ft)
14.0 16.0
09/15/98
08:42:38 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.13
Page 1 of 1
Section C-C - existing
Worksheet for Irregular Channel
Project Description
Project File
c:\haestad\fmw\lofts.fm2
Worksheet
Existing Alley @ C-C
Flow Element
Irregular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Channel Slope 0.005006 ft/ft
Water Surface Elevation 27.42 ft
Elevation range: 27.01 ft to 30.00 ft.
Station (ft) Elevation (ft) Start Station
0.00 27.42 0.00
9.00 27.01
16.00 27.42
16.00 30.00
Results
Wtd. Mannings Coefficient
0.016
Discharge
7.46
cfs
Flow Area
3.28
ft'
Wetted Perimeter
16.02
ft
Top Width
16.00
ft
Height
0.41
ft
Critical Depth
27.40
ft
Critical Slope
0.006439 ft/ft
Velocity
2.28
ft/s
Velocity Head
0.08
ft
Specific Energy
27.50
ft
Froude Number
0.89
Flow is subcritical.
Notes:
End Station Roughness
16.00 0.016
Capacity is not adequate. As other options have not been approved by property owner to the east, look at rebuilding
alley.
09/15/98 FlowMaster v5.13
08:42:48 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
HAESTAD CROSS SECTIONS
Project No:1590-01-98 Shear Engineering Corporation
By: EM
CHANNEL CAPACITY- SECTION C-C
PROJECT NAME: LOFTS AT CAMPUS WEST
SWALE DESCRIPTION: EXISTING SECTION C-C
Alley between Panhandlers and Town Square
CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL
CHANNEL CONFIGURATION: Triangular Q100 (CFS) _
CHANNEL LINING: ASPHALT/CONCRETE Qdesign =
Da
Db
Dc
Sc
n W
I
(ft)
(ft)
(ft)
M
(ft)
(ft)
7.00.
9.00
0.41
0.40
0.016 0.00
0.05
Campchan
12/8/98
22.92
30.48
P-Lt =
7.01
0.06
FT/FT
= LEFT BANK SLOPE
17.07
:1
(H:V)
P-Rt =
9.01
0.05
FT/FT
= RIGHT BANK SLOPE
21.95
:1
(H:V)
DEPTH
(ft)
WIDTH
(ft)
AREA
(s.f.)
PERIM
(ft)
R 2/3
(A/P)
Sc 1/2
Q
(cfs)
V
(ft/sec)
0.41
16.00
3.28
16.02
0.35
0.06
6.69
2.04
0.36
14.05
2.53
14.07
0.32
0.06
4.73
1.87
0.31
12.10
1.88
12.11
0.29
0.06
3.18
1.69
0.26
10.15
1.32
10.16
0.26
0.06
1.99
1.51
0.21
8.2.0
0.86
8.21
0.22
0.06
1.12
1.31
0.16
6.24
0.50
6.25
0.19
0.06
0.54
1.09
CONCLUDE: EXISTING CHANNEL IS NOT ADEQUATE
ADD 6" VERTICAL CURB ON EAST SIDE OF ALLEY TO INCREASE CAPACITY
SEE HAESTADS PRINTOUT FOR CHANNEL SECTION
Page 8 of 8
Project No:1590-01-98 Shear Engineering Corporation
By: EM
CHANNEL CAPACITY- SECTION D-D
PROJECT NAME: LOFTS AT CAMPUS WEST
SWALE DESCRIPTION: EXISTING SECTION D-D
Alley between Panhandlers and Town Square
CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL
CHANNEL CONFIGURATION: Triangular Q100 (CPS) _
CHANNEL LINING: ASPHALT/CONCRETE Qdesign =
Da
Db
Dc
Sc
n W
I
(ft)
(ft)
(ft)
M)
(ft)
(ft)
7.00
9.00
1.27
0.98
0.016 0.00
0.25
P-Lt =
7.11
0.18
FT/FT
= LEFT BANK SLOPE
P-Rt =
9.09
0.14
FT/FT
= RIGHT BANK SLOPE
Campchan
12/8/98
22.92
30.48
5.51 :1 (H:V)
7.09 :1 (H:V)
DEPTH
WIDTH
AREA
PERIM
R 2/3
Sc 1/2
Q
V
(ft)
(ft)
(s.f.)
(ft)
(A/P)
(cfs)
(ft/sec) --
1.27
16.00
10.16
16.20
0.73
0.10
68.43
6.74
1.02
12.85
6.55
13.01
0.63
0.10
38.14
5.82
0.77
9.70
3.73
9.82
0.52
0.10
18.02
4.82
0.52
6.55
1.70
6.63
0.40
0.10
6.33
3.71
0.914
11.51
5.26
11.66
0.59
0.10
28.46
5.41
0.913
11.50
5.25 -
11.65
0.59
0.10
28.38
5.41
FLOW DEPTH FOR THE DESIGN FLOW IS APPROXIMATELY
CONCLUDE: EXISTING CHANNEL IS ADEQUATE
NO MODIFICATIONS NECESSARY SOUTH OF THIS POINT
0.914 FEET
Page 7 of 8
Project No:1590-01-98 Shear Engineering Corporation
By: MEO
PROPOSED CHANNEL SECTION NORTH SIDE EXISTING SHOPS
PROJECT NAME: LOFTS @ CAMPUS WEST
SWALE DESCRIPTION: RECONSTRUCTED ALLEY
SECTION B-B
AT TRANSFORMER PAD
CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL
CHANNEL CONFIGURATION:
TRAPEZOIDAL
Q100
(CFS) =
13.59
CHANNEL LINING:
ASPHALT
QDES
= 1.33*Q100=
18.08
Da
Db
Dc
Sc
n W
I
(ft)
(ft)
(ft)
(°s)
(ft)
(ft)
0.50
6.00
0.75
0.97
0.016 2.00
0.15
P-Lt = 0.90 1.50 FT/FT. = LEFT BANK SLOPE
P-Rt = 6.05 0.13 FT/FT = RIGHT BANK SLOPE
Campchan
11/10/98
0.67 :1 (H:V)
8.00 :1 (H:V)
DEPTH
WIDTH
AREA
PERIM
R 2/3
Sc 1/2
Q
V
(ft)
(ft)
'(S.f.)
(ft)
(A/P)
(cfS)
(ft/sec)
0.75
8.50
3.94
8.95
0.58
0.10
20.84
5.29
0.60
7.20
2.76
7.56
0.51
0.10
12.90
4.67
0.45
5.90
1.78
6.17
0.44
0.10
7.09
3.99
0.30
4.60
0.99
4.78
0.35
0.10
3.17
3.20
0.15
3.30
0.40
3.39
0.24
0.10
0.87
2.19
0.703
8.09
3.54
8.51
0.56
0.10
18.08
5.10
FLOW DEPTH FOR THE DESIGN FLOW IS APPROXIMATELY
CONCLUDE SWALE IS ADEQUATE
0.703 FEET
Page 6 of 8
Project No:1590-01-98 Shear Engineering Corporation
By: MEO
PROPOSED CHANNEL SECTION NORTH SIDE OF EXISTING SHOPS
PROJECT NAME: LOFTS @ CAMPUS WEST
SWALE DESCRIPTION: RECONSTRUCTED ALLEY
SECTION A -A
FROM POND OUTFALL TO TRANSFORMER PAD
CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL
CHANNEL CONFIGURATION: TRAPEZOIDAL Q100 @ B1 from 13.59
CHANNEL LINING: ASPHALT . QDES = 1.33*Q100= 18.08
Da
Db
Dc
Sc
n W
I
(ft)
(ft)
(ft)
M)
(ft)
(ft)
6.00
4.00
0.60
0.97
0.016 2.00
0.10
P-Lt =
6.03
0.10
FT/FT
= LEFT BANK SLOPE
P-Rt =
4.04
0.15
FT/FT
= RIGHT BANK SLOPE
Campchan
11/10/98
10.00 :1 (H:V)
6.67 :1 (H:V)
DEPTH
(ft)
WIDTH
(ft)
AREA
(s.f.)
PERIM
(ft)
R 2/3
(A/P)
Sc 1/2
Q
(cfs)
V
(ft/sec)
0.60
12.00
4.20
12.07
0.49
0.10
19.00
4.52
0.50
10.33
3.08
-10.40
0.44
0.10
12.54
4.07
0.40
8.67
2.13
8.72
0.39
0.10
7.63
3.58
0.30
7.00
1.35
7.04
0.33
0.10
4.11
3.04
0.20
5.33
0.73
5.36
0.27
0.10
1.78
2.43
0.587
11.79
4..05
11.86
0.49
0.10
18.08
4.47
FLOW DEPTH FOR THE DESIGN FLOW IS APPROXIMATELY
CONCLUDE SWALE IS ADEQUATE
0.587 FEET
Page 5 of 8
Project No:1590-01-98 Shear Engineering Corporation
By: MEO
EXISTING ALLEY CAPACITY
Campchan
11/10/98
PROJECT NAME: LOFTS @ CAMPUS WEST
SWALE DESCRIPTION: EXISTING ALLEY
Between Panhandlers and Town Square
CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL
CHANNEL CONFIGURATION: TRIANGULAR Q100 22.14 HISTORIC Q100 @ A
CHANNEL LINING: CONCRETE Qdesign 29.45
Da
Db
Dc
Sc n
W
I
(ft)
(ft)
(ft)
(a)
(ft)
(ft)
9.00
7.00
0.33
0.30 0.016
0.00
0.03
P-Lt = 9.01 0.04 FT/FT = LEFT BANK SLOPE
P-Rt = 7.01 0.05 FT/FT = RIGHT BANK SLOPE
27 :1 (H:V)
21 :1 (H:V)
DEPTH
(ft)
WIDTH
(ft)
AREA
(s.f.)
PERIM
(ft)
R 2/3
(A/P)
Sc 1/2
Q
(cfs)
V
(ft/sec)
0.33
16.00
2.64
16.01
0.30
0.05
4.04
1.53
0.30
14.55
2..18
14.56
0.28
0.05
3.13
1.44
0.27
13.09
1.77
13.10
0.26
0.05
2.36
1.34
0.24
11.64
1.40
11.65
0.24
0.05
1.73
1.24
0.21
10.18
1.07
10.19
0.22
0.05
1.21
1.13
0.18
8.73
0.79
8.73
0.20
0.05
0.80
1.02
0.15
7.27
0.55
7.28
0.18
0.05
0.49
0.90
0.12
5.82
0.35
5.82
0.15
0.05
0.27
0.78
0.09
4.36
0.20
4.37
0.13
0.05
0.13
0.64
0.06
2.91
0.09
2.91
0.10
0.05
0.04
0.49
0.03
1.45
0.02
1.46
0.06
0.05
0.01
0.31
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.00
NOTE: THIS IS A WORST CASE SCENARIO OF THE EXISTING CHANNEL BETWEEN
PANHANDLERS AND TOWN SQUARE SHOPS
THE SLOPE RANGES FROM FLAT TO 0.026 FT/FT
DEPTH RANGES FROM APPROXIMATLEY 4" TO 9"
MODIFY CHANNEL TO INCREASE CAPACITY
Page 4 of 8
Project No:1590-01-98 Shear Engineering Corporation Campchan
By: MEO 12/8/98
PROJECT NAME: LOFTS @ CAMPUS WEST
SWALE DESCRIPTION: NORTH SIDE OF UNITS
FLOWS FROM SITE AND OFFSITE
Section L-L
CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL
CHANNEL CONFIGURATION: TRIANGULAR Q100 (CFS) = 4.78
CHANNEL LINING: GRASS Qdesign = 6.36
Da
Db
Dc
Sc
n W
I
(ft)
(ft)
(ft)
(o)
(ft)
(ft)
3.00
3.00
1.00 .
2.00
0.060 0.00
0.10
P-Lt =
3.16
0.33
FT/FT
= LEFT BANK SLOPE
P-Rt =
3.16
0.33
FT/FT
= RIGHT BANK SLOPE
3.00 :1 (H:V)
3.00 :1 (H:V)
DEPTH
WIDTH
AREA
PERIM
R 2/3
Sc 1/2
Q
V
(ft)
(ft)
(s.f.)
(ft)
(A/P)
(cfs)
(ft/sec)
1.00
6.00
3.00
6.32
0.61
0.14
6.39
2.13
6.90
5.40
2.43
5.69
0.57
0.14
4.83
1.99
0.80
4.80
1.92
5.06
0.52
0.14
3.52
1.84
0.70
4.20
1.47
4.43
0.48
0.14
2.47
1.68
0.60
3.60
1.08
3.79
0.43
0.14
1.64
1.52
0.50
3.00
0.75
3.16
0.38
0.14
1.01
1.34
0.40
2.40
0.48
2.53
0.33
0.14
0.56
1.16
0.30
1.80
0.27
1.90
0.27
0.14
0.26
0.95
0.20
1.20
0.12
1.26
0.21
0.14
0.09
0.73
0.10
0.60
0.03
0.63
0.13
0.14
0.01
0.46
0.00
0.00
0.00
0.00
0.00
0.14
0.00
0.00
0.998
5.99
2.99
6.31
0.61
0.14
6.36
2.13
FLOW DEPTH FOR Q = 6.36 CFS IS 0.998 FEET
CONCLUDE CHANNEL IS ADEQUATE TO CONVEY FLOW FROM NORTH HALF OF PROPOSED UNITS
AND OFFSITE FLOWS FROM CITY PARK CONDOS
6.00 FOOT DRAINAGE AND UTILITY EASEMENT REQUIRED
Page 3 of 8
Project No:1590-01-98 Shear Engineering Corporation
By: MEO
Summary of Swale Sections
Campchan
12/8/98
Section Side Slope Channel Slope Mannings Bottom Capacity Design Flow
Left Right Depth n Width Flow Depth
H:1 H:1 ft % ft cfs cfs ft
A -A
10.00
6.67
0.60
0.97
0.02
2.00
19.00
18.08
0.59
B-B
0.67
8.00
0.75
0.97
0.02
2.00
20.84
18.08
0.70
C-C
17.07
21.95
0.41
0.40
0.02
0.M
6.69
30.48
D-D
5.51
7.09
1.27
0.98
0.02
0.00
68.43
30.48
0.91
L-L
3.00
3.00
1.00
2.00
0.06
0.00
6.39
6.36
1.00
Note:
Sections
A -A
and
B-B are in the alley
behind Town Square Shops
Sections
C-C
D-D are in the alley
between Town Square and
Panhandlers
Section
C-C
is
an existing section and requires
modification
See
Haestads printout and profile
for modification
Section
D-D
is
an existing section
See
Haestads printout and profile
for modification
Section
L-L
is
behind the units on site
Page 2 of 8
Project No:1590-01-98 Shear Engineering Corporation Campchan
By: MEO 11/10/98
SWALES
Page 1 of 8
FORT COLLINS
RAINFALL INTENSITY CURVE DATA FOR CITY OF FORT COLLINS
FIG 3-1
NOVEMBER 1975
INTERPRETED DECEMBER 21, 1992 BY MARK OBERSCHMIDT
SHEAR ENGINEERING CORPORATION
2
5
10
25
50
100
0
TIME
YEAR
YEAR
YEAR
YEAR
YEAR.
YEAR
1
5
3.29
4.70
5.64
7.02
7.95
9.30
2
10
2.54
3.65
4.45
5.50
6.35
7.14
3
15
2.14
3.07
3.75
4.60
5.29
6.06
4
20
1.85
2.65
3.25
4.00
4.60
5.21
5
25
1.63
2.34
2.87
3.54
4.08
4.63
6
30
1.47
2.11
2.60
3.17
3.67
4.20
7
35
1.32
1.92
2.38
2.88
3.35
3.81
8
40
1.20
1.76
2.19
2.67
3.08
3.60
9
45
1.12
1.62
2.02
2.46
2.84
3.28
10
50
1.04
1.51
1.87
2.27
2.65
3.02
11
55
0.97
1.40
1.73
2.12
2.46
2.80
12
60
0.90
1.32
1.62
1.99
2.32
2.60
13
65
0.88
1.24
1.52
1.84
2.18
2.43
14
70
0.82
1.18
1.44
1.72
2.05
2.30
15
75
0.79
1.11
1.38
1.62
1.93
2.17
16
80
0.74
1.07
1.30
1.53
1.82
2.07
17
85
0.70
1.00
1.23
1.46
1.73
1.96
18
90
0.68
0.97
1.20
1.40
1.67
1.87
19
95
0.64
0.91
1.13
1.32
1.59
1.77
20
100
0.61
0.88
1.09
1.27
1.51
1.70
21
105
0.60
0.83,
1.04
1.22
1.46
1.63
22
110
0.57
0.80
1.00
1.18
1.40
1.57
23
115
0.54
0.78
0.96
1.14
1.33
1.50
24
120
0.52
0.76
0.91
1.10
1.19
1.44
25
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
VERIFY THAT OVERFLOW WEIR IS ADEQUATE
PROJECT:
Lofts @ Campus West
OVERFLOW WEIR INPUT - WEIR
CONSISTS OF 2 "SPEED BUMPS" @
SOUTH AND
EAST PROPERTY LINES AND TALL CURB AROUND ELECTRICAL
AND TELEPHONE PEDESTALS
EMERGENCY OVERFLOW WEIR
DELTA HEAD
(ft)
= 0.02
WEIR LENGTH (ft) =
97.00 WEIR COEF.
(Cw)
= 2.60
WEIR INVERT (ft) =
30.80 QOVERFLOW
(cfs)
= 13.59
ELEV.
ft
OUTPUT
HEAD
OVER
WEIR
FT
WEIR
FLOW
CFS
30.80
0.00
0.00
30.82
0.02
0.71
30.84
0.04
2.02
30.86
0.06
3.71
30.88
0.08
5.71
30.90
0.10
7.98
30.92
0.12
10.48
30.94
0.14
13.21
30.96
0.16
" 16.14
30.98
0.18
19.26
31.00
0.20
22.56
30.943
0.143
13.590
WATER ELEVATION IF ORIFICE CLOGGED (WE)=
LOWEST FINISHED FLOOR ON SITE (FF) _
DIFFERENCE (FF - WE) _
Height of water over weir =
30.943 FEET
33.00 FEET
2.057 FEET >
0.143 feet
1 46/64 inches
1 11/16 inches
CONCLUDE:
OVERFLOW WILL SPILL SOUTH AND EAST AND THEN TRAVEL EAST IN SWALE ON
NORTH SIDE OF EXISTING BUILDINGS OR ACROSS EXISTING CONDO PARKING LOT
DESIGN SWALE ON NORTH SIDE OF TOWN SQUARE TO HANDLE
1331 OF OVERFLOW AMOUNT = 18.08 CFS
Camppond
11/11/98
1.50
Page 6 of 6
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
OUTLET STRUCTURE
PROJECT: LOFTS @ CAMPUS WEST
DETERMINE ORIFICE SIZE
Q= CA(2gH)^0.5
A = Q/(C(2gH)%.5
H (ft) = 1.13
C = 0.65
Q (cfs)= 2.04
A = 0.37
R (ft) = 0.342
D (ft) = 0.68
USE 8" DIAM ORIFICE
STRUCTURE TYPE: ORIFICE
LOWER ORIFICE DIAM. (ft) =
LOWER ORIFICE INV. (ft) =
LOWER ORIFICE COEF. (Cl) =
RELEASE RATE (CfS) _
WSEL REQ-D (ft) =
EMERGENCY OVERFLOW WEIR'
WEIR LENGTH (ft) =
WEIR INVERT (ft) =
LOWER ORIFICE AREA (A) _
INPUT FOR OUTLET STRUCTURE
OVERFLOW WEIR
0.66 WEIR LENGTH (ft) =
29.64 WEIR INVERT (ft) =
0.65 WEIR COEF. (Cw) _
2.04 TOP OF BERM (ft) =
30.7720 INIT. DELTA (ft) =
DELTA HEAD (ft) _
97.00 WEIR COEF. (Cw) _
30.80 QOVERFLOW. (cfs) _
0.3421 SOUARE FEET'
BROADCRESTED
10.00
30.70
2.60
32.00
0.16
0.20
2.60
13.59
Camppond
11/11/98
HEAD HEAD
ELEV. OVER LOWER OVER WEIR TOTAL STORAGE STORAGE
LOWER ORIFICE WEIR FLOW FLOW
ORIFICE FLOW
ft ft cfs ft cfs cfs ac-ft cf
29.64
0.00
0.00
0.00
0.00
0.00
0.00
0
29.80
0.00
0.00
0.00
0.00
0.00
0.00
16
30.00
0.03
0.31
0.00
0.00
0.31
0.00
182
30.20
0.23
0.86
0.00
0.00
0.86
0.02
661
30.40
0.43
1.17
0.00
0.00
1.17
0.04
1703
30.60
0.63
1.42
0.00
0.00
1.42
0.08
3419
30.70
0.73
1.52
0.00
0.00
1 1.52
0.10
4564
30.77
0.80
1.60
0.07
0.50
2.10
0.12
5389
30.77
0.80
1.59
0.07
0.45
2.04
0.12
5327
30.80
0.83
1.63
0.10
0.82
2.45
0.13
5709
ORIFICE EQUATION: CA(2gH)^1/2 WEIR FLOW EQTN. CwLHA3/2
HEAD OVER ORIFICE = ELEV-CENTER OF ORIFICE
100 - YEAR WSEL BASED ON OUTLET HYDRAULICS =
30.77 FEET > 30.77
CONCLUDE: OUTLET STRUCTURE FUNCTIONS TO RESTRICT RELEASE RATE ADEQUATELY
Page 5 of 6
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
AVERAGE END AREA METHOD
FOR DETENTION BASIN VOLUMES
PROJECT LOFTS @ CAMPUS WEST
INVERT 29.64 FEET FIRST EVEN CONTOUR
TOP ELEV
INCREMEN 0.2 FOOT SCALE: 1" _
ELEV AREA VOLUME CUM. CUM. CUM.
(V1) VOLUME VOLUME VOLUME
ft sq ft cf cf cy ac-ft
29.64
0
0
0
0
0.00
29.80
197
16
16
1
0.00
30.00
1467
166
182
7
0.00
30.20
3319
479
661
24
0.02
30.40
7102
1042
1703
63
0.04
30.60
10060
1716
3419
127
0.08
30.80
12842
2290
5709
211
0.13
FORMULAE V1 = (E2-E1)*05*(A2+A1)
29.8 FEET
30.8 FEET
20 FEET
REQUIRED VOLUME = 5389 cubic feet
0.12 AC -FT
AVAILABLE POND VOLUME = 5709 CUBIC FEET
0.13 AC -FT
REQ'D 100 YEAR W.S. ELEV. 30.772 FEET - BASED ON STAGE STORAGE CURVE
ACTUAL 100-YEAR W.S.ELEV. 30.767 FEET
ACTUAL 100-YEAR W:S.ELEV. BASED ON OUTLET HYDRAULICS
STORAGE REACHED @ ACTUAL 100-YEAR W.S.ELEV. 5327 CF
0.12 AC -FT
CONCLUDE TOTAL POND VOLUME IS JUST ADEQUATE
REQUEST VARIANCE FROM FREEBOARD REQUIREMENT
REQUEST VARIANCE FOR EXCEEDING ALLOWABLE POND DEPTH
SPECIAL SIGNS REQUIRED FOR SPEED BUMPS
Camppond
11/11/98
Page 4 of 6
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
DETENTION VOLUME REQUIRED
PROJECT: LOFTS Q CAMPUS WEST
NOTES: AREA = SITE AREA ONLY
RELEASE RATE IS HISTORIC Q2 FROM SITE ONLY
CUMULATIVE RUNOFF METHOD
FOR
SIZING DETENTION PONDS
DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT:
RELEASE RATE: 2.04 CFS AREA:
INITIAL TIME: 5 MINUTES
TIME INCREMENT: 5 MINUTES
0.96
1.24 ACRES
Camppond
11/11/98
INFLOW INFLOW RELEASE STORAGE STORAGE
TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME
min sec iph cfs cf cf cf ac-ft
5
300
9.30
11.07
3321.2
612.0
2709.2
0.06
10
600
7.14
8.50
5099.7
1224.0
3875.7
0.09
15
900
6.06
7.21
6492.4
1836.0
4656.4
0.11
20
1200
5.21
6.20
7442.4
2448.0
4994.4
0.11
25
1500
4.63
5.51
8267.3
3060.0
5207.3
0.12
30
1800
4.20
5.00
8999.4
3672.0
5327.4
0.12
35
2100
3.81
4.54
9524.4
4284.0
5240.4
0.12
40
2400
3.60
4.29
10285.1
4896.0
5389.1
0.12
45
2700
3.28
3.90
10542.2
5508.0
5034.2
0.12
50
3000
3.02
3.60
10785.0
6120.0
4665.0
0.11
55
3300
2.80
3.33
10999.3
6732.0
4267.3
0.10
60
3600
2.60
3.10
11142.1
7344.0
3798.1
0.09
65
3900
2.43
2.89
11281.4
7956.0
3325.4
0.08
70
4200
2.30
2.74
11499.3
8568.0
2931.3
0.07
75
4500
2.17
2.58
11624.3
9180.0
2444.3
0.06
80
4800
2.07
2.46
11827.8
9792.0
2035.8
0.05
85
5100
1.96
2.33
11899.2
10404.0
1495.2
0.03
90
5400
1.87
2.23
12020.7
11016.0
1004.7
0.02
95
5700
1.77
2.11
12009.9.
11628.0
381.9
0.01
100
6000
1.70
2.02
12142.1
12240.0
-97.9
0.00
DETENTION VOLUME REQUIRED = 5389 CF
0.12 AC -FT
Page 3 of 6
Project No: 1590-01-97 Shear Engineering Corporation Camppond
By: MEO 11/11/98
Detention Pond Rating Curve
Elevation Volume Volume Release
ft cf ac-ft CA
29.64
0
0
0
29.80
16
0.00
0.00
30.00
182
0.00
0.31
30.20
661
0.02
0.86
30.40
1703
0.04
1.17
30.60
3419
0.08
1.42
30.80
5709
0.13
2.45
Page 2 of 6
DETENTION POND
Project No: 1590-01-97 Shear Engineering Corporation Camprun
By: MEO 12/8/98
DEVELOPED CONDITIONS
FLOW TO CONCENTRATION POINT B2
FROM SUBBASIN A2 & B2
PROJECT: LOFTS @ CAMPUS WEST
NOTES: FLOW FOR SWALE ON NORTH SIDE OF BUILDINGS
AREA (A)= 0.670 ACRES
RUNOFF COEF. (C)
2 YEAR 10 YEAR 100 YEAR
C = 0.80 0.80 1.00
TIME OF CONCENTRATION (TC)
OVERLAND TRAVEL TIME (Ti)
(1.87*(1.1-C*Cf)*LA0.5)/SA0.33
LENGTH =
20.00
FEET
SLOPE =
1.00
2 YEAR
10 YEAR
100 YEAR
C =
0.20
0.20
0.25
Ti (min)=
7.53
7.53
7.11
TRAVEL TIME (Tt)
=L/(60*V)
NOTE:
ALL VELOCITIES
TAKEN FROM FIGURE 3-2
Length
Slope
Flow Type
Velocity
40.00
1.00
gutter
2.00
0.33
300.00
2.00
swale
2.16
2.31
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
TOTAL TRAVEL TIME (min)
=
2.65
LENGTH =
360.00
L/180+10
=
12.00
> 9.76
2 YEAR
10 YEAR
100 YEAR
Tc (min)=
10.17
10.17
9.76
USE Tc =
12.00
12.00
10.00
INTENSITY
(I) (iph)
2 YEAR
10 YEAR
100 YEAR
I =
2.38
4.17
7.14
NOTE:
INTENSITIES TAKEN FROM
FIGURE
3-1
RUNOFF (Q= CIA) (CfS)
2 YEAR 10 YEAR 100 YEAR
Q = 1.28 2.25 4.78
CONCLUDE: DESIGN SWALE FOR 133% OF Q100 = 6.36 CFS
SWALE ON NORTH SIDE OF BUILDINGS
Page 11 of 11
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
DEVELOPED CONDITIONS
FLOW TO CONCENTRATION POINT
FROM SUBBASIN B1 & B2
PROJECT: LOFTS @ CAMPUS WEST
FILE: CAMPRUN
NOTES:
AREA (A)= 1.240 ACRES
RUNOFF COEF. (C)
2 YEAR 10 YEAR
C = 0.77 0.77
TIME OF CONCENTRATION (TC)
B1
100 YEAR
0.96
OVERLAND TRAVEL TIME (Ti)
(1.87*(1.1-C*Cf)*L% .5)/S% .33
LENGTH =
?
FEET
SLOPE = ?
°s
2 YEAR
10 YEAR
100 YEAR
C =
?
?
?
Ti (min)=
0.00
0.00
0.00
TRAVEL TIME (Tt)
=L/(60*V) NOTE: ALL
VELOCITIES TAKEN FROM FIGURE 3-2
Length
Slope
Flow Type Velocity
100.00
2.00
gutter
2.83
0.59
300.00
0.50
gutter
1.50
3.33
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
TOTAL TRAVEL TIME
(min) =
3.92
LENGTH =
400.00
L/180+10
=
12.22
> 3.92
2 YEAR
10 YEAR
100 YEAR
Tc (min)=
3.92
3.92
3.92
USE Tc =
5.00
5.00
5.00
INTENSITY
(I) (iph)
2 YEAR
10 YEAR
100 YEAR
I =
3.29
5.64
9.30
NOTE:
INTENSITIES TAKEN
FROM FIGURE
3-1
RUNOFF (Q=
CIA) (cfs)
2 YEAR
10 YEAR
100 YEAR
Q =
3.14
5.37
11.08
CONCLUDE:
DETAIN IN
PARKING
LOT DETENTION
POND
Camprun
11/10/98
Page 10 of 11
Project No: 1590-01-97 Shear Engineering Corporation Camprun
By: MEO 11/10/98
FOR REFERENCE ONLY
DEVELOPED CONDITIONS
FLOW TO CONCENTRATION POINT
FROM SUBBASIN Al-A3
A
PROJECT: LOFTS @ CAMPUS WEST
NOTES: FLOW TO END OF ALLEY @ ELIZABETH
FROM UNDETAINED SUBBASINS
ADD IN RELEASE FROM DETENTION POND
AREA (A)= 2.350 ACRES
RUNOFF COEF. (C)
2 YEAR
C = 0.89
TIME OF CONCENTRATION (Tc)
OVERLAND
TRAVEL TIME (Ti)
LENGTH =
70.00 FEET
2 YEAR
C =
0.20
Ti (min)=
6.95
10 YEAR
0.89
100 YEAR
1.00
(1.87*(1.1-C*Cf)*L% .5)/S"0.33
SLOPE = 8.50 °s
10 YEAR 100 YEAR
0.20 0.25
6.95 6.56
TRAVEL TIME (Tt)=L/(60*V) NOTE:
Length
Slope
Flow Type
Velocity
380.00
1.00
Gutter
2.00
170.00
1.00
Gutter
2.00
270.00
0.80
Gutter
1.80
?
0.00
none
0.00
?
0.00
none
0.00
?
0.00
none
0.00
?
0.00
none
0.00
TOTAL TRAVEL TIME (min)
_
LENGTH =
890.00
L/180+10
=
2 YEAR
10 YEAR
Tc (min)=
14.03
14.03
USE Tc =
14.00
14.00
INTENSITY (I) (iph) NOTE:
2 YEAR
I = 2.22
RUNOFF (Q= CIA) (CfS)
2 YEAR
Q =
4.64
Qrel =
2.04
Qtotal =
6.68
ALL VELOCITIES TAKEN FROM FIGURE 3-2
3.17
1.42
2.50
0.00
0.00
0.00
0.00
7.08
14.94 >
100 YEAR
13.65
13.50
13.65
INTENSITIES TAKEN FROM FIGURE 3-1
10 YEAR 100 YEAR
3.89 6.38
10 YEAR 100 YEAR
8.13 15.00
2.04 2.04 .ADD IN RELEASE
10.17 17.04
CONCLUDE: DUE TO THE PROBLEMS DOWNSTREAM AND THE PAST HISTORY IN THIS AREA
MODIFY ALLEY TO HANDLE THE DEVELOPED FLOW WITH NO DETENTION
DESIGN FLOW FOR ALLEY = 133o OF Q100 = 22.92
DESIGN FLOW = 30.48 CFS
SEE HAESTAD METHODS CROSS SECTIONS AND RATING TABLES
Page 9 of 11
Project No: 1590-01-97 Shear Engineering Corporation Camprun
By: MEO 11/10/98
DEVELOPED CONDITIONS
FLOW TO CONCENTRATION POINT A
FROM SUBBASIN A1-3 & B1-2
PROJECT: LOFTS @ CAMPUS WEST
NOTES: FLOW TO END OF ALLEY @ ELIZABETH
from all basins
AREA (A)= 3.590 ACRES
RUNOFF COEF. (C)
2 YEAR 10 YEAR 100 YEAR
C = 0.85 0.85 1.00
TIME OF CONCENTRATION (Tc)
OVERLAND TRAVEL TIME (Ti) (1.87*(1.1-C*Cf)*LA0.5)/SA0.33
LENGTH = 70.00 FEET SLOPE = 8.50 6
2 YEAR 10 YEAR 100 YEAR
C = 0.20 0.20 0.25
Ti (min)= 6.95 6.95 6.56
TRAVEL TIME (Tt)=L/(60*V) NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2
Length Slope Flow Type Velocity
380.00 1.00 Gutter 2.00 3.17
170.00 1.00 Gutter 2.00 1.42
270.00 0.80 Gutter 1.80 2.50
? 0.00 none 0.00 0.00
? 0.00 none 0.00 0.00
? 0.00 none 0.00 0.00
? 0.00 none 0.00 0.00
TOTAL TRAVEL TIME (min) = 7.08
LENGTH = 890.00 L/180+10 = 14.94 > 13.65
2 YEAR 10 YEAR 100 YEAR
Tc (min)= 14.03 14.03 13.65
USE Tc = 14.00 14.00 13.50
INTENSITY (I) (iph)
2 YEAR 10 YEAR 100 YEAR
I = 2.22 3.89 6.38
NOTE: INTENSITIES TAKEN FROM FIGURE 3-1
RUNOFF (Q= CIA) (cfs)
2 YEAR 10 YEAR 100 YEAR
Q = 6.76 11.84 22.92
CONCLUDE: DOES NOT TAKE INTO ACCOUNT THAT DETENTION POND ON SITE RESTRICTS
RELEASE TO HISTORIC 2-YEAR FLOW = 2.04 CFS
Page 8 of 11
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
DEVELOPED CONDITIONS
FLOW TO CONCENTRATION POINT B1
FROM SUBBASIN B1-2,A2-3
PROJECT: LOFTS Q CAMPUS WEST
NOTES: FLOW TO SOUTHEAST CORNER OF SITE
AREA (A)= 1.990 ACRES
RUNOFF COEF. (C)
2 YEAR
C = 0.77
TIME OF CONCENTRATION (TC)
OVERLAND TRAVEL TIME (Ti)
LENGTH = 70.00 FEET
2 YEAR
C = 0.20
Ti (min)= 6.95
10 YEAR 100 YEAR
0.77 0.96
(1.87*(1.1-C*Cf)*L"0.5)/SAO.33
SLOPE = 8.50
10 YEAR 100 YEAR
0.20 0.25
6.95 6.56
TRAVEL TIME (Tt)
=L/(60*V)
NOTE: ALL
VELOCITIES TAKEN FROM FIGURE 3-2
Length
Slope
Flow Type
Velocity
380.00
1.00
Gutter
2.00
3.17
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
TOTAL TRAVEL TIME (min)
=
3.17
LENGTH =
450.00
L/180+10
=
12.50
> 9.73
2 YEAR
10 YEAR
100 YEAR
Tc (min)=
10.12
10.12
9.73
USE Tc =
10.00
10.00
10.00
INTENSITY
(I) (iph)
2 YEAR
10 YEAR
100 YEAR
I =
2.54
4.45
7.14
NOTE:
INTENSITIES TAKEN FROM FIGURE
3-1
RUNOFF (Q=
CIA) (cfs)
2 YEAR
10 YEAR
100 YEAR
Q =
3.87
6.78
13.59
Camprun
11/10/98
CONCLUDE: DETAIN AND RELEASE AT HISTORIC 2-YEAR
SIZE DETENTION POND FOR SITE ONLY
DESIGN OVERFLOW WEIR TO PASS THIS Q100 WITH MINIMAL HEAD OVER WEIR
IN CASE OUTLET PIPE IS CLOGGED
Page 7 of 11
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
EXISTING CONDITIONS
FLOW TO CONCENTRATION POINT A
FROM SUBBASIN A1-3 & B
PROJECT: LOFTS @ CAMPUS WEST
NOTES: FLOW TO END OF ALLEY @ ELIZABETH
AREA (A)= 3.590 ACRES
RUNOFF COEF. (C)
2 YEAR
C = 0.81
TIME OF CONCENTRATION (Tc)
OVERLAND TRAVEL TIME (Ti)
LENGTH = 70.00 FEET
2 YEAR
C = 0.20
Ti (min)= 6.95
10 YEAR 100 YEAR
0.81 1.00
(1.87*(1.1-C*Cf)*L"0.5)/S"0.33
SLOPE = 8.50 0
10 YEAR 100 YEAR
0.20 0.25
6.95 6.56
TRAVEL TIME (TO=L/(60*V) NOTE:
Length
Slope
Flow Type
Velocity
200.00
0.50
Lawn
0.50
130.00
0.80
Gutter
1.80
170.00
1.00
Gutter
2.00
270.00
0.80
Gutter
1.80
?
0.00
none
0.00
?
0.00
none
0.00
?
0.00
none
0.00
TOTAL TRAVEL TIME (min)
_
LENGTH =
840.00
L/180+10
=
Tc =Ti+TOTAL TRAVEL
TIME
2 YEAR
10 YEAR
Tc (min)
14.67
14.67
USE Tc =
14.50
14.50
INTENSITY (I) (iph)
2 YEAR 10 YEAR
I = 2.18 3.82
NOTE: INTENSITIES TAKEN FROM FIGURE
RUNOFF (Q= CIA) (cfs)
2 YEAR 10 YEAR
Q = 6.35 11.14
ALL VELOCITIES TAKEN FROM FIGURE 3-2
6.67
1.20
1.42
2.50
0.00
0.00
0.00
11.79
14.67
< 18.35
100 YEAR
14.67
14.50
100 YEAR
6.17
3-1
100 YEAR
22.14
CONCLUDE: EXISTING FLOW TO SOUTH END OF ALLEY @ WEST ELIZABETH STREET
COMPARE WITH EXISTING CAPACITY OF SWALE BETWEEN BUILDINGS
WORST CASE SCENARIO IS WHERE CHANNEL IS SHALLOWEST
Camprun
11/10/98
Page 6 of 11
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
EXISTING CONDITIONS
FLOW TO CONCENTRATION POINT B
FROM SUBBASIN B
PROJECT: LOFTS @ CAMPUS WEST
NOTES: FLOW TO SOUTHEAST CORNER OF SITE
AREA (A)= 1.240 ACRES EXISTING SITE ONLY
RUNOFF COEF. (C)
2 YEAR 10 YEAR 100 YEAR
C = 0.66 0.66 0.82
TIME OF CONCENTRATION (TC)
OVERLAND TRAVEL TIME (Ti)
(1.87*(1.1-C*Cf)*L"0.5)/S% .33
LENGTH =
50.00
FEET
SLOPE =
8.50
2 YEAR
10 YEAR
100 YEAR
C =
0.20
0.20
0.25
Ti (min)=
5.87
5.87
5.55
TRAVEL TIME (Tt)
=L/(60*V)
NOTE: ALL
VELOCITIES TAKEN FROM FIGURE 3-2
Length
Slope
Flow Type
Velocity
120.00
2.00
Lawn
1.00
2.00
130.00
0.80
Bare
0.85
2.55
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
TOTAL TRAVEL TIME (min)
=
4.55
LENGTH =
300.00.
L/180+10
=
11.67
> 10.10
Tc =Ti+TOTAL TRAVEL
TIME
2 YEAR
10 YEAR
100 YEAR
Tc (min)=
10.42
10.42
10.10
USE Tc =
10.50
10.50
10.00
INTENSITY
(I) (iph)
2 YEAR
10 YEAR
100 YEAR
I =
2.50
4.38
7.14
NOTE:
INTENSITIES TAKEN FROM
FIGURE
3-1
RUNOFF (Q=,CIA) (cfs)
2 YEAR
10 YEAR
100 YEAR
Q =
2.04
3.57
7.28
CONCLUDE: USE 2 YEAR FLOW FOR RELEASE RATE FROM DETENTION POND
Camprun
11/10/96
Page 5 of 11
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
Camprun
11/10/98
FOR REFERENCE ONLY
EXISTING CONDITIONS
FLOW TO CONCENTRATION POINT B
FROM SUBBASIN B & A2-3
PROJECT: LOFTS @ CAMPUS WEST
NOTES: FLOW TO SOUTHEAST CORNER OF SITE
AREA (A)= 1.990 ACRES AREA INCLUDES OFFSITE AREA TO NORTH
RUNOFF COEF. (C)
2 YEAR
C = 0.70
TIME OF CONCENTRATION (TC)
OVERLAND TRAVEL TIME (Ti)
LENGTH = 70.00 FEET
2 YEAR
C = 0.20
Ti (min)= 6.95
10, YEAR 100 YEAR
0.70 0.88
(1.87*(1.1-C*Cf)*L"0.5)/SAO.33
SLOPE = 8.50 0
10 YEAR 100 YEAR
0.20 0.25
6.95 6.56
TRAVEL TIME (Tt)
=L/(60*V)
NOTE: ALL
VELOCITIES TAKEN FROM FIGURE 3-2
Length
Slope
Flow Type Velocity
200.00
0.50
Lawn
0.50
6.67
130.00
0.80
gutter
1.80
1.20
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
?
0.00
none
0.00
0.00
TOTAL TRAVEL TIME
(min) =
7.87
LENGTH =
400.00
L/180+10
=
12.22
< 14.43
Tc =Ti+TOTAL TRAVEL
TIME
2 YEAR
10 YEAR
100 YEAR
Tc (min)=
12.22
12.22
12.22
USE Tc =
12.00
12.00
12.00
INTENSITY
(I) (iph)
2 YEAR,
10 YEAR
100 YEAR
I =
2.38
4.17
6.71
NOTE:
INTENSITIES TAKEN
FROM FIGURE
3-1
RUNOFF (Q= CIA) (cf5)
2 YEAR 10 YEAR 100 YEAR
Q = 3.32 5.82 11.70
CONCLUDE: TOTAL HISTORIC FLOW TO PROPOSED PARKING LOT DETENTION
Page 4 of 11
Project NO: 1590-01-97 Shear Engineering Corporation
By: MEO
PROJECT LOFTS @ CAMPUS WEST
Camprun
11/10/98
NOTE:
AREAS WITHIN THE LIMITS OF
THE ROW WILL NOT BE AFFECTED
EXISTING SITE IS PARTIALLY
PAVED
EXISTING DIRT HAS
BEEN MODELLED
AS GRAVEL
REMAINING AREA IS
GRASSED
WITH AVERAGE SLOPES
OFFSITE AREAS ARE
ASSIGNED
TO BASIN "A"
ONSITE AREAS ARE ASSIGNED
TO BASIN "B"
EXISTING
SITE BREAKDOWN
SUBBASIN
AREA C2,10
C100 ASPHALT
GRAVEL CONCRETE
LAWN
ROOF
CHECK
acres
0.95
0.50 0.95
0.25
0.95
Al
1.60 0.95
1.00
0.66
0.00 0.17
0.00
0.77
1.60
A2
0.51 0.87
1.00
0.28
0.00 0.00
0.06
0.17
0.51
A3
0.24 0.57
0.71
0.08
0.00 0.02
0.13
0.01
0.24
SUBTOTAL
2.35 0.89
1.00
1.02
0.00 0.19
0.19
0.95
2.35
SITE
1.24 0.66
0.82
0.44
0.65 0.05
0.10
0.00
1.24
DESIGN
BASINS AREA
C2,10
C100
FLOW GENERATED
POINT
A
Al-3&SITE 3.59
0.81
1.00
HISTORIC FLOW TO END OF ALLEY
B
A2-3&SITE 1.99
0.70
0.88
HISTORIC FLOW TO SOUTHEAST
CORNER
B
SITE 1.24
0.66
0.82
DEVELOPED SITE BREAKDOWN
SUBBASIN
AREA C2,10
C100 ASPHALT
GRAVEL CONCRETE
LAWN
ROOF
CHECK
OFFSITE
acres
0.95
0.50 0.95
0.20
0.95
Al
1.60 0.95
1.00
0.66
0.00 0.17
0.00
0.77
1.60 NO CHANGE FROM EXISTING
A2
- 0.51 0.86
1.00
0.28
0.00 0.00
0.06
0.17
0.51 NO CHANGE FROM EXISTING
A3
0.24 0.54
0.68
0.08
0.00 0.02
0.13
0.01
0.24 NO CHANGE FROM EXISTING
SUBTOTAL
2.35 0.89
1.00
1.02
0.00 0.19
0.19
0.95
2.35
SITE
B1
1.08 0.79
0.99
0.56
0.00 0.18
0.23
0.11
1.08
B2
0.16 0.62
0.78
0.00
0.00 0.00
0.07
0.09
0.16
SUBTOTAL
1.24 0.77
0.96
0.56
0.00 0.18
0.30
0.20
1.24
TOTAL
3.59 0.85
1.00
1.58
0.00 0.37
0.49
1.15
3.59
DESIGN
BASINS AREA
C2,10
C100
FLOW GENERATED
POINT
A
A1-3,B1-2 3.59
0.85
1.00
DEVELOPED FLOW TO
END OF ALLEY
B1
Bl-2,A2-3 1.99
0.77
0.96
DEVELOPED FLOW TO
SOUTHEAST
CORNER
OF SITE
02
B2,A2 0.67
0.80
1.00
DEVELOPED FLOW TO
SWALE BEHIND
PROPOSED BUILDINGS
A
Al-A3 2.35
0.89
1.00
Page 3 of 11
Camprun
12/8/98
Project No: 1590-01-97 Shear Engineering Corporation
By: MEO
._\__\dvaa\nrW-a �hmi ral\Camo-DRn_dura
This worksheet linked to drainage drawing any changes to it will be
reflected in drainage drawing
FLOW SUMMARY FOR LOFTS @ CAMPUS WEST
DESIGN CONTRIBUTING
POINT SUB
BASIN(S)
AREA
ac.
C2
CI00
Tc
2,10
min.
Tc
100
min
12
iph
II00
iph
Q2
cfs
QI00
cfs
EXISTING CONDITIONS
B B & A2-3
1.99
0.70
0.88
12.00
12.00
2.38
6.71
3.32
11.70
B B
1.24
0.66
0.82
10.50
10.00
2.50
7.14
2.04
7.28
A AI-3 & B
3.59
0.81
1.00
14.50
14.50
2.19
6.17
6.35
22.14
DEVELOPED CONDITIONS
BI Bl-2,A2-3
1.99
0.77
0.96
10.00
10.00
2.54
7.14
3.97
13.59
A Al-3&B1-2
3.59
0.85
1.00
14.00
13.50
2.22
6.38
6.76
22.92
A A1-A3
2.35
0.89
1.00
14.00
13.50
2.22
6.38
6.68
17.04
Bl BI&132
1.24
0.77
0.96
5.00
5.00
3.29
9.30
3.14
11.08
132 A2 & B2
0.67
0.80
1.00
12.00
10.00
2.38
7.14
1.28
4.78
NOTES:
THE DETENTION POND HAS AN OVERFLOW WEIR WHICH HAS ENOUGH CAPACITY TO PASS THE
DEVELOPED QI00 FROM SUBBASINS BI-B2
DETENTION POND IS SIZED FOR INCREASE IN FLOW FROM THE SITE ONLY
Page 2 of 11
Project No: 1590-01-97 Shear Engineering Corporation Camprun
By: MEO 11/10/98
I RUNOFF
Page 1 of 11
APPENDIX I
Drainage Calculations
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 14
2. A 2% longitudinal slope was provided.
3. The maximum side slope is 3: 1.
D. A letter is attached to this report in Appendix IV which represents the formal
request for the variances listed above
VIH. CONCLUSIONS:
A. COMPLIANCE WITH STANDARDS
1. All drainage analysis has been performed according to the requirements of
the City of Fort Collins Storm Drainage Criteria Manual.
2. Proposed drainage improvements generally conform to the
recommendations of the City of Fort Collins Master Drainage Plan with the
exception of the variance requests noted in the report.
3. Proposed erosion control measures conform to the recommendations of the
City of Fort Collins standards.
B. DRAINAGE CONCEPT
1. The proposed drainage design for The Lofts at Campus West is effective
for the control of storm runoff with a considerable reduction in potential
downstream effects.
2. The proposed drainage design for The Lofts at Campus West will have no
effect on City of Fort Collins Master Drainage Plan recommendations.
IX. REFERENCES:
A. City of Fort Collins "Storm Drainage Design Criteria and Construction
Standards"; May, 1984
B. City of Fort Collins "Erosion Control Reference Manual"; January, 1991
C. Shields Street Drainage Evaluation, Prospect Road to Birch Street; Prepared
by Lidstone and Anderson, Inc., Project No. CO-FC-93.I013; Dated April 29,
1994
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 13
C. EROSION CONTROL SECURITY DEPOSIT
1. An erosion control security deposit is required in accordance with City of
Fort Collins policy. In no instance shall the amount of the security be less
than $1000.00.
2. See the Erosion Control Security Deposit Requirements document located
in Appendix I11.
3. The erosion control security deposit is reimbursable.
VII. VARIANCE FROM CITY STANDARDS
A. A variance is requested from the City of Fort Collins Standard that all
detention ponds provide a minimum of 1.0 foot of freeboard.
1. The pond volume has been maximized in the parking area.
2. The nature of the development requires that the ponding depth not exceed
1.0 foot. This makes it impossible to both provide the storage as well as
freeboard.
3. The surrounding existing development prohibits revising the detention.,
grading to increase the elevation of the berm.
B. A variance is requested from the City of Fort Collins Standard that the
maximum depth of ponding in the parking area of a residential site be restricted
to 1.0 foot.
I. The volume requirement could not be met using a depth of 1.0 foot due to
site grading constraints.
2. The maximum flow depth in the pond is only 1.2 feet.
3. The area at which the flow will be 1.2 feet deep is in the southeast corner
of the site. This is well away from any parking areas or buildings.
C. A variance is requested from the City of Fort Collins Standard that the
maximum side slope not be less than 4:1 for the Swale section L-L along the
north side of the proposed buildings.
1. Adequate capacity in the Swale could not be obtained with a 4:1 side slope
due to the proximity of the building to the north property line.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 12
E. SPECIFIC DETAILS - SWALE ON NORTH SIDE OF PROPOSED BUILDINGS
I. A triangular grass lined swale (Section L-L) will be constructed on the
north side of the proposed buildings to convey the offsite flows from the
north half of the buildings.
2. The swale is designed to convey 133% of the 100-year flow to Design
Point B 1 located at the eastern end of Unit 3.
3. The geometry and flow capacity of the swale are summarized below.
Slope ft/ft
0.0200
Depth ft
1.0
Bottom Width ft
0.0
Side Sloe Left
3:1
Side Slope(Right)
3:1
Top Width ft
6.0
Q 100 cfs
4.78
Design Flow cfs
6.38
Swale Capacity cfs
6.39
VI. EROSION CONTROL AND WATER QUALITY:
A. GENERAL CONCEPT
1. Erosion control measures are specified on the Drainage and Erosion
Control plan.
2. Maintenance of erosion control devices will remain the responsibility of the
contractor and the owner until the project is complete.
B. SPECIFIC DETAILS
1. The following measures are specified on the Drainage and Erosion Control
plan:
2. A gravel inlet filter around the proposed detention pond outfall in the
parking area.
3. Haybales will be placed in the swale on the north side of the proposed
buildings.
4. A water quality device will be installed at the outfall from the detention
pond. Maintenance of the device will be the responsibility of the owner.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 11
3. Approximately 80 lineal feet of 6" vertical face curb will be installed along
the west side of the Panhandlers building. The limits of the curb installation
are from the northwest corner of the building 80 feet south. The curb
stops on the north side of the northernmost door. The curb will not affect
accessibility to the building.
4. The design flow for the alley is 133% of the Q100 to the southern end of
the alley. This is based on the assumption that The Lofts at Campus West is
developed without detention. This is done to improve the existing situation
and minimize the possibility of the buildings being flooded in the future
during a 100-year storm event. Refer to pages 18 - 22 in the drainage
calculations located in Appendix I.
Section C-C
Section D-D
Top Width ft
16.0
16.0
Side Slopes Left West
17.07:1
21.95:1 H:V
Side Slopes Right East
5.51:1
7.09:1 H: V
Slope ft/ft
0.004
0.0098
Depth ft
0.91
1.27
Mannin s n
0.016
0.016
Capacity cfs
48.72
68.43
Design Flow cfs
28.45
28.45
5. Four additional cross sections (E-E, F-F, G-G, H-H) located at the .
northern end of the alley were analyzed for flow capacity. These sections
were analyzed to verify that the Q100 would be conveyed safely around the
bend.
6. Sections G-G and H-H had adequate capacity using the proposed profile
and grading to convey the design flow.
7. Vertical face curb was added to the east sides of Section E-E and F-F in
order to provide adequate capacity to convey the design flow around the
corner.
8. The curb will be installed along the west side of the Panhandlers building
south to the northernmost door.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 10
C. SPECIFIC DETAILS - SWALE IN ALLEY NORTH OF TOWN SQUARE SHOPS
I. The area on the north side of the Town Square shops will be regraded to
accommodate the runoff from the detention pond and the upstream area.
2. The overall developed Q100 to the southeast corner of the site is 13.59 cfs.
The swale along the north side of the Town Square shops is designed to
handle 133% of the developed Q100 from the upstream contributing area.
This assumes that the orifice is clogged and 100% of the overflow is
conveyed through this swale without detention. This does not consider the
fact that approximately one half (1/2) the flow will be conveyed east
through the Campus West Condominium parking lot.
4. A T wide valley pan will be constructed in the flowline of the swale.
a. Section A -A is the portion of the swale from the detention pond outlet
to the transformer pad noted on the plan.
b. Section B-B is located at the transformer pad noted on the plan. -
Section A -A Section B-B
Top Width (ft)
12.0
8.5
Bottom Width (ft)
2.0
2.0
Side Slopes Left
10:1
6.67:1
Right
0.67:1
8:1
Slope (ft/ft)
0.0098
0.0098
Depth (ft)
0.60
0.75
Mannings n
0.016
0.016
Capacity (cfs)
19.00
20.84
Design Flow cfs)
18.08
18.08
D. SPECIFIC DETAILS - SWALE IN THE ALLEY BETWEEN TOWN SQUARE AND
PANHANDLERS PIZZA
A ten (10') foot wide section of the alley will be reconstructed according to
the alley plan and profile (included with Appendix IV of this report). This
will include the northern portion of the alley where the stormwater from
the north and west turns south in the alley, and is directed towards West
Elizabeth Street.
2. A 6" vertical face curb will be installed along the west side of the existing
fence at the north end of the Panhandlers building. This curb is installed to
ensure that the stormwater is diverted to the south.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 9
2. The table below summarizes the rating curve of the detention pond.
Detention Pond Rating Curve
Elevation Volume Volume Release
ft cf ac-ft cfs
29.64
0
0
0
29.80
16
0.00
0.00
30.00
182
0.00
0.31
30.20
661
0.02
0.86
30.40
1703
0.04
1.17
30.60
3419
0.08
1.42
30.80
5709
0.13
2.45
3. The outlet device for the pond will consist of an 8" PVC and a concrete
channel through the speed bump, which will convey the stormwater from
the pond into the adjacent parking lot. The berm over the pipe will act as a
speed bump as well as the primary and emergency overflow weirs. The 41
berm over the pipe will be constructed with asphalt.
4. The 2 speed bumps / weirs and the tall curb in the southeast corner of the
site will also act as emergency overflow weirs in case the orifice is plugged. x-
5. The invert elevation of the 2 weirs is 30.80 feet. The total length of the
weir is approximately 97 feet.
6. The peak 100-year flow from the developed site and sub -basin A2 and A-3
is 13.59 cfs.
7. The approximate water surface elevation over the weir for 13.59 cfs is
30.94 feet if the pipe is completely plugged. This amounts to approximately
1 3/4" deep over the top of the weir. The overflow will be flowing south
into the Town Square Shopping Center and east into the parking lot of City
Park Condominiums.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE
3. The stormwater released from the detention pond will be conveyed to West
Elizabeth Street via the existing alley. Improvements to the channel in the
alley are required to ensure that the water is conveyed safely past the
existing buildings, which adjoin the alley.
4. The existing channel is approximately 4" deep at its shallowest point.
5. The slope of the existing channel in the alley ranges from flat to
approximately .026 ft/ft.
6. The top width of the existing triangular channel in the alley is
approximately 16 feet.
7. The entire channel is either asphalt or concrete lined. Therefore, a
Mannings n value of 0.016 was used.
8. Offsite flows from the property to the north (City Park Condominiums) will
pass through the site. Due to the limited capacity of the detention pond the
majority of these flows will pass undetained.
9. Emergency overflow weirs will be installed with the grading of the pond,
which will convey.the entire developed 100-year flow from the site and the
upstream area safely out of the site. to the alley in case the orifice is
plugged.
1o. Alley modifications will increase the capacity of the existing alley to pass
the entire Q100 from the upstream contributing area.
B. SPECIFIC DETAILS - DETENTION
1. The table below summarizes the desisn of the detention pond.
Bottom of Pond elevation
29.60 ft.
Top of Berm elevation
30.80 ft.
Primary spillway elevation
30.70 ft
Emergency Overflowspillway elevation
30.80 ft
Detention Volume Provided at elevation
5709 cf.
= 30.80 feet
0.13 Ac-ft
Detention Volume Required
5389 cf.
0.12 Ac-ft
100- ear W. S. Elevation
30.77 ft
Total Contributing Area
to Pond Sub -basins B1 - B2 & A2
1.99 ac.
Pond Sized using Area Sub -basin BI and 132
1.24 ac
Maximum Allowable release rate
2.04 cfs
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 7
C. HYDROLOGICAL CRITERIA
1. The Rainfall -Intensity -Duration curves for the City of Fort Collins were
used (Figure 3-1, attached for reference), in conjunction with the "Rational
Method" for determining peak flows at various concentration points.
2. The two (2) and one hundred (100) year storms were studied in accordance
with Table 3-1 of the City of Fort Collins Storm Drainage Design Criteria
Manual for residential sites.
3. Detention pond volumes were determined using the Mass Diagram Method
(Cumulative Runoff Method). The maximum allowable release rate is based
on the peak 2-year flow for historic conditions generated by the existing
site.
D. HYDRAULIC CRITERIA
1. Storm sewer and drainage channel capacities are based on the Mannings
Equation. The Mannings coefficients will be as suggested by the City of .
Fort Collins Storm Drainage Criteria Manual. -All pipe capacities are based
a Mannings Equation with the pipe flowing full (HW/D =1.0).
2. Detention outfalls are based on the orifice / weir equation utilizing the
orifice / weir equation coefficient as suggested by the City of Fort Collins
Storm Drainage Criteria Manual.
V. DRAINAGE FACILITY DESIGN:
A. GENERAL CONCEPT
1. The parking area will be graded to create a detention pond. The detention
design maximizes storage volumes within the design constraints mentioned
previously.
2. The grading design in the parking area will provide detention storage in the
southeast corner of the site.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 6
IV. DRAINAGE DESIGN CRITERIA:
A. REGULATIONS
1. Design Criteria from the City of Fort Collins Storm Drainage Design
Criteria Manual and options for storm drainage improvements discussed by
the City of Fort Collins were considered.
2. Erosion Control Criteria from the City of Fort Collins Criteria Manual was
used.
B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS
1. The site is completely developed on all sides, creating grading constraints
for the entire perimeter of the project.
2. Detention is required with this project. The flexibility for achieving the
required detention volume in the parking area is severely limited due to the
surrounding constraints.
3. Allowable ponding depths in the parking lot are restricted by the finished
floor elevations of the existing retail buildings to the south.
4. The detention outfall depends entirely on the utilization of the alley
southeast of the site.
5. Downstream flooding is a regular occurrence at the intersection of West
Elizabeth Street and Shields Street. The increase in impervious surface area
on the site will naturally increase the amount of runoff to the intersection if
detention is not provided. Therefore, detention will be provided in the
parking area of the site. Release rates will be restricted to the historic 2-
year peak flow generated by the site.
6. The alley located southeast of the site is the only logical outfall for the
runoff from the site. The existing channel has limited capacity.
Modifications to the alley will be made in order to increase the capacity of
the channel. The modified channel .section will have capacity to
accommodate 133% of the developed Q100 to the alley. Improvements
will be made even though detention is provided with this project. This is
because of the problems which occurred during the flood of July 28, 1997.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 5
B. DESCRIPTION OF PROPERTY
I. Development of the site will consist of the construction of 3 multi -family
buildings (6 units) and the necessary infrastructure to service them. There
are existing utilities in close proximity to the site.
2. The site has a net area of approximately 1.24 acres.
M. DRAINAGE BASINS AND SUB -BASINS:
A. MAJOR BASIN DESCRIPTION
I. The site is located within the Spring Creek Drainage Basin as defined on
the City of Fort Collins Master Stormwater Basin Map.
2. The Basin fee rate for this basin is $2,175 per gross acre according to the.
development fee section of the City of Fort Collins Development Manual.
This may be reduced if detention is provided.
13
B. SUB -BASIN DESCRIPTION
1. The site slopes from west to east. There is approximately 7 feet of fall from
City Park Drive (at the northwest corner of the site) to the southeast corner
of the site.
2. Historically, stormwater runoff from the site flows to the east and then
south to West Elizabeth Street. The water flows south through an alley
located between two retail buildings as noted in the introduction.
3. The site is partially paved to provide a secondary access to the Town
Square shopping center and parking for the apartment complex to the east.
4. Stormwater runoff from the property to the north (City Park
Condominiums) passes undetained through the site.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 4
building. Field inspection revealed that doors 1,2, and 4 are blocked up
from the inside and are no longer used. The other 2 doors (Doors 3 and
5) open out. Accessibility on the west side of the Panhandlers building
will not be affected by this project.
c. The southernmost stoop on the Shops at Town Square building has
steps going down to the basement. This basement was flooded during
the flood on July 28, 1997. One (1) additional step will be added to
raise the elevation of the top step in order to minimize the chances of
water going into the basement.
6. The area along the north side of the Town Square Shops will also be
regraded to improve the conveyance from the detention pond to the alley.
These modifications will include;
a. Installation of a valley pan in the alley along the north side of the
existing shops in Town Square.
b. Grading of the alley along the north side of the existing shops in Town
Square Shopping Center will be done to create a swale. The swale will
consist of asphalt and concrete.
H. GENERAL LOCATION AND DESCRIPTION:
A. LOCATION
1. The Lofts at Campus West is located in the Northeast quarter of Section
15, T7N, R69W of the 6th P.M., Fort Collins, Colorado. The site is the
remaining undeveloped portion of the Town Square Shopping Center.
2. More specifically, it is located approximately 250 feet north of the
intersection of City Park Drive and West Elizabeth Street on the east side
of City Park Drive.
3. The site is bounded on the south by Town Square Shopping Center, on the
east and north by City Park Condominiums and on the west by City Park
Drive.
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 3
I. INTRODUCTION:
1. The site is located on City Park Avenue north of West Elizabeth Street.
This will be an in -fill development. The surrounding properties are
completely developed with retail and residential properties. The site
provides a secondary access to the Town Square shopping center and
parking areas for several apartment buildings located east of the site. Some
of the site is already paved to provide these access and parking areas.
2. Detention will be provided in the parking area of the Lofts at Campus West
site to restrict the release rate of the runoff from the site to the historic 2-
year release rate. The detention will be provided in the southeast corner of
the property.
3. Historically, runoff from the site is conveyed to the east on the north side
of the retail shops in Town Square Subdivision. It is then conveyed to West
Elizabeth Street in an alley between two (2) retail buildings located south
and east of the project site (Please refer to Existing Conditions Plan). The
two retail buildings are the Panhandlers Pizza building on the east and the
Shops at Town Square on the west. The finished floor elevations of the'_
Shops at Town Square are approximately 2.5 feet higher than the finished
floor elevation of the Panhandlers Pizza' building. The existing alley
between these two buildings was constructed with an inverted crown to
create a triangular channel.
4. The finished- floor of the building on the east sets the upper limit of the
depth of flow in the existing channel. The difference between the finished
floor and the existing invert of the channel is approximately 4" at the
shallowest point of the channel.
5. The channel in the alley will be modified with this project. The
modifications are designed to pass the 100-year developed flows from the
overall contributing area to the southern end of the alley at West Elizabeth
Street. Modifications include;
a. Installation of a 6" vertical concrete curb along a portion of the west
side of the Panhandlers Pizza building. Curb will be installed from the
northwest corner of the building 80 feet south to the northernmost
pedestrian door. This will increase the depth of the channel and prohibit
water from entering the building. The curb height is set so that the
overall capacity of the channel will pass the 100-year developed flows
from the upstream area.
b. There are 5 pedestrian doors on the alley side of the Panhandlers Pizza
building. Three (3) of the doors (Doors 1,2 and 4) open into the
Final Drainage and Erosion Control Report for Lofts at Campus West
PAGE 2
TABLE OF CONTENTS
INTRODUCTION: ................................................... o ........... o ........................................ 3
GENERAL LOCATION AND DESCRIPTION: .............................. o ....................... 4
LOCATION....................................................................................................................
4
DESCRIPTIONOF PROPERTY..........................................................................................
4
DRAINAGE BASINS AND SUB —BASINS: .................................................................
5
MAJOR BASIN DESCRIPTION.........................................................................................
5
SUB -BASIN DESCRIPTION.............................................................................................
5
DRAINAGE DESIGN CRITERIA: ............................................................................
6
REGULATIONS..............................................................................................................
6
HYDROLOGICAL CRITERIA............................................................................................
7
HYDRAULICCRITERIA..................................................................................................
7
DRAINAGE FACILITY DESIGN: ..............................................................................
7
GENERALCONCEPT......................................................................................................
7
SPECIFIC DETAILS - DETENTION...................................................................................
8
SPECIFIC DETAILS - SWALE IN ALLEY NORTH OF TOWN SQUARE SHOPS .......................
10
SPECIFIC DETAILS — S WALE IN THE ALLEY BETWEEN TOWN SQUARE AND PANHANDLERS
PIZZA.........................................................................................................................
10
EROSION CONTROL AND WATER QUALITY: ..................................................
12
GENERAL CONCEPT....................................................................................................
12
SPECIFICDETAILS......................................................................................................
12
EROSION CONTROL SECURITY DEPOSIT......................................................................
13
VARIANCE FROM CITY STANDARDS.................................................................13
CONCLUSIONS: .........................................................................................................
14
COMPLIANCE WITH STANDARDS................................................................................. 14
DRAINAGE CONCEPT.................................................................................................. 14
REFERENCES: .......................................................................................................... 14
APPENDIX I
— Drainage Calculations
APPENDIX II
— Erosion Control
APPENDIX III
— Charts and Figures
APPENDIX IV
— Stuffer Envelope
VICINITY MAP
SCALE: 1" =2000'
December 11, 1998
Project No: 1590-01-97
Basil Hamdan
City of Fort Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80522
Re: The Lofts at Campus West; Fort Collins, Colorado
Dear Basil,
Enclosed, please find the Final Drainage and Erosion Control Report for The Lofts at Campus
West. The hydrology data and the hydraulic analysis presented in this report complies with the
requirements of the City of Fort Collins Storm Drainage Criteria Manual dated March, 1984 and
revised this year, the City of Fort Collins Erosion Control Reference. Manual and the Old Town
Master Drainage Basin Plan for the City of Fort Collins.
If you have any questions or comments, please call us at 226-5334.
Sincerely,
Mark Oberschmidt
Shear Engineering Corporation
MEO / meo
Reviewed by
46 LIU
Brian W. Shear, P.E.
cc: Timberline Property Management
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311
Final Drainage and Erosion Control Report
For
THE LOFTS AT CAMPUS WEST
Fort Collins, Colorado
Prepared for:
Timberline Property Manaeement .
4529 South Stover Street
Fort Collins, Colorado 80521
PRINT DATE
JAN 13 1999
SHEAH ENGINEERING CORP
Prepared by:
Shear Enaineerine Corporation
Project No: 1590-01-97 l I 1 l hc'
Date: December, 1998
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311