HomeMy WebLinkAboutLOFTS AT CAMPUS WEST (THE) - PDP/FDP - 28-97 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYHCS: Unsignalized Intersections Release 2.1d
-
Page 1
--------------- ------ ---'------------------------------
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-------
Streets: (N-S) city park
------------"--
(E-W) site
access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 10/ /91
Other Information......... am pm 1997 short
long bkgrd
total
Two-way Stop -controlled Intersec ion
Northbound Southbound
Eastbound
Westbound
L T R L T R
L T R
1 L T R
�__-_ ____ ______-_ -__- _-______
No. Lanes 0 1.< 0 0 > 1 0
-___ ----
0 0 0
i---- ___- ----
1 0 > 0 < 0
Stop/Yield N; N;
Volumes 305 401 35 305
25 30
PHF .95 .951 .95 .95
.95 .95
Grade 0 0
0
MC's (%)
SU/RV's (%);
CV's (%)
PCE's 11.10
-----------1----------------------------------------------------
:1.10 1.10
----
Adjustment Factdrs
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d _-Page _2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
342
Potential Capacity: (pcph)
929
Movement Capacity: (pcph)
929
Prob. of Queue -Free State:
0.96
--------------------------------------------------------
Step 2: LT from Major Street
S6_-__-------NB
___________________________________________
Conflicting Flows: (vph)
363
Potential Capacity: (pcph)
1151
Movement Capacity: (pcph)
1151
Prob. of Queue -Free State:
0.96
TH Saturation Flow Rate: (pcphpl)
1100
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.96
--------------------------------------------------------
Step 4: LT from Minor Street
WS
EB
________________________________________________________
Conflicting Flows: (vph)
700
Potential Capacity: (pcph)
416
Major LT, Minor TH
impedance Factor:
0.96
Adjusted Impedance Factor:
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.96
Movement Capacity: (pcph)
________________________________________________________
3398
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (peph)(sec/veh) (veh)
-----
(sec/veh)
---------
-------- ------ ------ ------ -------
WB L 29 3396 >
-------
579 7.0
0.4 B
7.0
WB R 35 929 >
SB L 41 1151 3.2
0.0 A
0.3
Intersection Delay =
0.7 sec/veh
HCS: Unsignalized Intersections Release"2.1d
Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) city park
(E-W)
site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst. .................. mjd
Date of Analysis........ 10/25/97
Other- Information....... .am pm 1997 short
lon
bkgrd total
Two-way Stop -controlled I section
Northbound Southbound Eastbound Westbound
L T R L T R L
T
R L T R
-_--____ -___ ----
�___- --__ ____--_- ____ ________
No. Lanes 0 1 < 0 0 > 1 0 0
____
0
0 0 > 0 < 0
Stop/Yield N; N
Volumes 170 35i 25 220
15 20
PHF .95 .951 .95 .95
.95 .95
Grade 0 0
0
MC's (%)
SU/RV's
CV's (%)
PCE's :1.10 i
---------------------------------------------------------------------
;1.10 1.10
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------- ---------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignalized Intersections Release 2-id
Worksheet for TWSC intersection
-------------------------------------------
Step 1: RT from Minor Street WB
Conflicting Flows: (vph)
198
Potential Capacity: (pcph)
1099
Movement Capacity: (pcph)
1099
Prob. of Queue -Free State:
0.98
--------------------------------------------
Step 2: LT from Major Street
SB
--------------------------------------------------
Conflicting Flows: (vph)
216
Potential Capacity: (pcph)
1353
Movement Capacity: (pcph)
1353
Prob. of Queue -Free State:
0.98
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
--------------------------------------------------
Step 4: LT from Minor Street
WB
--------------------------------------------------
Conflicting Flows: (vph)
456
Potential Capacity: (pcph)
576
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
--------------------------------------------------
562
Page 2
EB
NB
EB
Intersection Performance Summary
Avg.
95%
Flow
Move Shared Total
Queue
Approach
Rate
Cap Cap Delay
Length LOS
Delay
Movement
(pcph)
______
(pcph) (pcph)(sec/veh)
______ _____________
(veh)
_______ _____
(sec/veh)
---------
________
WB L
18
562 >
774 4.9
0.0 A
4.9
WB R
23
1099 >
SB L
29
1353 2.7
0.0 A
0.3
Intersection Delay =
0.5 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d
10-25-1997
Center
For Microcomputers In Transportation
HCM: SIGNALIZED iNTERSECTION
SUMMARY Version 2.4d
10-25-1597
-----------------------------------------------------------------------
Center For
Microcomputers In Transportation
Streets: (E-W) elizabeth (N-S) city park
___________________
-----------------------------------------------------------------------
Streets: (E-W) elizabeth (N-S) city park
Analyst: Matt
Area
Area Type: Other
File Name:
- 5-97 am Pm
Analyst: Matt
File Name-
1997 short
long bkgrnd total
Area Type: Others-97
am pm
___
Comment: 1997 short
long bkgrnd tota
Eastbound Westbound ; Northbound
Southbound
____________________
L T
R L T R L T R;
L T
R
Eastbound
I Westbound I Northbound
Southbound
___
; L T
R L T R L T R
L T
R
No. Lanes ; 1 2
< ; 1 2 < ; 1 1 <
; 1 1 <
--
No. Lanes-1-- -2 <
----'---- ---- ----'---- ---- ---I----
; 1 2 < ; 1 1 <
--- ----
; 1 1 <
Volumes ; 100 795
10 295 50; 30 55
45; 75
50
Volumes ; 125 665
90; 70 830 90; 165 130
60; 90 80
160
PHF or PK15; 0.12.0
951
0.9510.95 0.12.0 0.95i12.0 12.0 0.55;0..0
.95 0.95
PHF or- PK15;0.95 0.95
0.9510.95 0.95 0.95;0.95 0.95 0.9510.95
0.95 0.95
12.0
Lane W (ft);12.0 12.0
;12.0 12.0 ;12.0 12.0
120
;12.0 12.0
Grade
0 0 0
0
Lane W (ft);12.0 12.0
;12.0 12.0 1I2.0 12.0
;12.0 12.0
% Heavy Veh; 1
1 1; 1 1 1; i 1
1; 1 1
1
Grade 0
0 0
; 0
Parking 1(YIN) N
1(Y'IN) N ;(YIN) N
;(Y/N) N
% Heavy Veh; 1 1
11 1 11 1
1; 1 1
1
Bus Stops ;
0; 0;
0;
0
Parking ;(YIN) N
,(Y/N) N ;(YIN) N
;(YIN) N
Con. Peds ;
0; 0; '
0;
0
Bus Stops ;
0; 0;
0;
0
Ped Button ;(YIN) Y
11.5 s';(Y/N) Y 11.5 s;(YIN) Y 17.5
sl(YIN) Y 17.5
Con. Peds
0; 0;
0;
0
Arr Type 3
3 3 3 3 3
3 3
Ped Button ;(YIN) Y 11.5
s;(YIN) Y 11.5 s;(YIN) Y 17.5
s;(YIN) Y 17.5
RTOR Vols
0; 0;
0;
0
Arr Type 3 3
3 3 ; 3 3
3 3
Lost Time ;1.00 3.00
3.00; 1.00 3.00 3.0011.00 3.00 3.0011.00
3.00 3.00
RTOR Vols ;
0; 0;
01
0
Prop. Share;
;
Lost Time 11.00 3.00
3.0011.00 3.00 3.00;1.00 3.00 3.0011.00
3.00 3.00
Prop. Prot.;
hare;-----------------'----------------------------
Prop. Share;--------------
-------------- --------------
--------------
Prop. Prot..
Signal Operations
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1
2 3 4; 5
6 7
d
Phase Combination 1
2 3 4; S
6 7
8
EB Left *
;NB Left *
EB Left *
;NB Left
Thru *
; Thru *
Thru *
; Thru
Right'
; Right *
Right *
; Right
Peds *
; Peds *
Peds *
; Peds
W6 Left *
;S6 Left *
W6 Left *
;SB Left
Thru *
Thru *
Thru *
Thru
Right *
Right *
Right *
Right
Peds *
Peds *
Peds *
Peds
NB Right
;EB Right
NB Right
;EB Right
SB Right
;WB Right
SB Right
;WB Right
Green 33.OP ;Green i7.0A
Green 34.6P
;Green 15.4A
'fellow/AR 5.0
;Yellow/AR 5.0
Yellow/AR 5.0
;Yellow/AR 5.0
Cycle Length: 60 secs
_______________________________________________________________________
Phase combination order: #1 #5
Cycle Length: 60 secs
Phase combination order: #1 #5
Intersection Performance Summary
--------------------------------------------------------------------
Intersection
Performance Summary
Lane Group:
Mvmts Cap
Adj Sat VIc g/C
Flow Ratio Ratio Delay
Approach:
LOS Delay
LOS
Lane Group: Adj
Sat v/c g/C
Approach:
_____ _____
___ _____
___
Mvmts Cap
Flow Ratio Ratio Delay
LOS Delay
LOS
EB L 633
1027 0.166 0.617 3.2
A 4.4
A
----- -----------
EB L 145
----- ----- ----
226 0.908 0.643 39.7
--- -----
D 6.8
---
B
TR 2175
3728 0.417 0.583 4.5
A
TR 2254
3695 0.370 0.610 3.9
A
WB L 178
288 0.062 0.617 - 3.0
A 3.6
A
WB L 228
355 0.324 0.643 3.4
A 4.1
A
TR - 2129
3649 0.130 0.583 3.6
.A
TR 2261
3707 0.450 0.610 4.2
A
NB L 398
i136 0.080 0.350 8.4
6 9.4
B
NB L 218
675 0.797 0.323 24.4
C 17.3
C
TR 556
1755 0.189 0.317 9.6
B
TR 520
1792 0.385 0.290 11.2
B
SB L 473
1352 0.245 0.350 9.0
6 9.4
B
SB L .278
860 0.342 0.323 10.3
B 11.7
8
TR 560
1768 0.236 0.317 9.3
B
TR 491
i693 0.513 0.290 12.2
B
Intersection
Delay = 5.4 sec/veh intersection LOS =
8
Intersection Delay = 8.5 sec/veh Intersection
LOS =
B
Lost Time/Cycle, L=
__________________--
4_0 sec Critical v/c(x) =
__-______-__-___________________-__--___--____
0.353
Lost Time/Cycle. L =
_______________________________________________________________________
2.0 sec Critical v/c(x) =
0.871
APPENDIX G
I
HCS: Unsignalized Intersections Release 2.1d Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0373
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 10/25/97
Other Information......... am ® 1997 short long bkgrd total
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound Westbound
L T R L T R; L T R L T R
�_--- ---- ____ __-____- ---_ ____i____ ____ _-__---- ____ ----
No. Lanes 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield ; NI N
Volumes 299 321 31 303 19
PHF .95 .95; .95 .95 .95 .95
Grade 0 0 0
MC's (%)
SU/RV's (%)
CV's (%) I
PCE's ;1.10 ; :1.10 1.10
------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignaiized intersections Release 2.1d Page 2
-------------
Worksheet for TWSC intersection
--------------------------------------------------------
Step 1: RT from Minor Street WS Ee
Conflicting Flows: (vph)
332
Potential Capacity: (pcph)
940
MovementCapacity: (pcph)
940
Prob. of Queue -Free State:
0.97
Step2 LT fromMajorStreet
----------
N6
--- - -------------SB
Conflicting Flows: (vph)
349
Potential Capacity: (pcph)
1169
Movement Capacity: (pcph)
1169
Prob. of Queue -Free State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.96
--------------------------------------------------------
Step 4: LT from Minor Street
WS
E8
--- - ---------------------------------------------
Conflicting Flows: (vph)
---
684
Potential Capacity: (pcph)
425
Major LT, Minor TH
impedance Factor:
0.96
Adjusted impedance Factor:
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.96
Movement Capacity: (pcph)
-------------------------------------------------------
409
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
-------- ------ ------ ------------- ------- -----
(sec/veh)
---------
WS L 22 409 >
511 6.5
0.2 B
6.5
WB R 31 940 >
SB L 36 1169 3.2
0.0 A
0.3
Intersection Delay =
0.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d
Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (N-S) city park
(E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst_ ................ mjd
Date of Analysis.......... 10/25/97
Other Information........ am pm 1997 short
long bkgrd total
Two-way Stop -controlled In rsection
Northbound I Southbound Eastbound
Westbound
L T R ; L T R L
T R L T R
�---- ---- ----'---- -----------
No. Lanes .0 1 < 0 1 0 > 1 0 0
---------- ---- ----
0 0 0 > 0 < 0
Stop/Yield N; N;
'
Volumes 167 31; 25 211
8 15
PHF .95 .951 .95 .95
.95 .95
Grade 0 0
0
MC's (%)
SU/RV's (%);
CV's (%)
PCE's ;1.10
_________________________________________-_________-___________________
:1.10 1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized intersections Release 2.1d Page 2
Worksheet for TWSC Intersection
----------------- 7-------------------------
Step 1: RT from Minor Street W8
Conflicting Flows: (vph)
192
Potential Capacity: (pcph)
1107
Movement Capacity: (pcph)
1107
Prob. of Queue -Free State:
0.98
-------------------------------------------
Step 2: LT from Major Street
_____________________________ -----_--_-__SB
Conflicting Flows: (vph)
209
Potential Capacity: (pcph)
1363
Movement Capacity: (pcph)
1363
Prob. of Queue -Free State:
0.98
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
-------------------------------------------
Step 4: LT from Minor Street
WB
-------------------------------------------
Conflicting Flows: (vph)
440
Potential Capacity: (pcph)
569
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
-------------------------------------------
575
EB
Intersection Performance Summary
Avg.
95%
Flow
Move Shared Total
Queue
Approach
Rate
Cap Cap Delay
Length LOS
Delay
Movement
________
(pcph)
______
(pcph) (pcph)(sec/veh)
______ ______ _______
(veh)
_______ _____
(sec/veh)
_________
W8 L
9
575 >
646 4.4
0.0 A
4.4
WB R
18
1107 >
SB L
29
1363 2.7
0.0 A
0.3
Intersection Delay =
0.4 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 10-25-1997
Center For Microcomputers In Transportation
Streets: (E-W) elizabeth y park
Analyst: Matt File Name:
Area Type: Other _ 10-25-91 am pm
Comment: 1997 short ong bkgrnd total
Eastbound Westbound ; Northbound I Southbound
: L T R L T R L T R L T R
---- --- ---- ---- ---- ---: ---- ---- ---- --- ---- ---
No. Lanes 1 2 < 1 2 c 1 1 < 1 1 <
Volumes 99 768 49; 10 198 47: 28 52 441 102 73 44
PHF or PK15:0.95 0.95 0.9510.95 0.95 0.95;0.95 0.95 0.95:0.95 0.95 0.95
Lane W (ft)112.0 12.0 :12.0 12.0 ;12.0 12.0 112.0 12.0
Grade 0 0 - 0 : 0
% Heavy Veh; 1 1 1: 1 1 1; 1 1 11 1 1 1
Parking :(Y/N) N :(Y/N) N ;(Y/N) N ;(Y/N) N
Bus Stops : 0; 0: 0: 0
Con. Peds 0; 0: 0: 0
Ped Button ;(YIN) Y 11.5 s;(Y/N) Y 11.5 s;(Y/N) 'f 17.5 s:(Y/N) Y 17.5
Arr Type 3 3 3 3 3 3 3 3
RTOR Vols 0: 0: 0: 0
Lost Time 11.00 3.00 3.00�1.00 3.00 3.00:1.00 3.00 3.00:1.00 3.00 3.00
Prop. Share; :
Prop. Prot.:
_______________________________________________________________________
Signal Operations
Phase Combination 1- 2 3 4 1 5 6 7 8
EB Left * BNB Left
Thru * Thru
Right * Right
Peals * ; Peds
WB Left * :SB Left
Thru * Thru
Right * J Right
Peds * Peds ,K
N8 Right :EB Right
SB Right :WB Right
Green 33.OP :Green 17.OA
Yellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: 41 45
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c aiC Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
_____ ____ _______ _____ _____ _____ ___ _____ ---
EB L 641 1039 0.162 0.617 3.2 A 4.4 A
TR 2175 3728 0.415 0.583 4.5 A
WB L 179 291 0.061 0.617 3.0 A 3.6 A
TR 2132 3655 0.127 0.583 3.6 A
NB L 411 1174 0.071 0.350 8.4 B 9.3 B
TR 555 1753 0.1-82 0.317 9.6 B
SB L 478 1365 0.224 0.350 8.9 6 9.4 B
TR 562 1776 0.2i9 0.317 9.8 B
Intersection Delay = 5.3 sec/veh intersection LOS B
Lost Time/Cycle. L = 4.0 sec Critical v/c(t) = 0.344
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 10-25-1997
Center For Microcomputers In Transportation
Streets: (E-W) elizabeth (N-S) city park
Analyst: Matt File Name:
Area Type: Other 10-25-97 am pm
Comment- 1997 short ong bkgrnd total
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
No. Lanes 1 2 < 1 2 < 1 1 < 1 1
Volumes 120 664 90: 68 828 83; 165 128 591 86 80 156
PHF or PK1510.95 0.95 0.9510.95 0.95 0.95�0.95 0.95 0.95:0.95 0.95 0.95
Lane W (ft):12.0 12.0 112.0 12.0 112.0 12.0 ,12.0 12.0
Grade 0 0 0 0
% Heavy 'Veh; 1 1 1: 1 1 11 1 i 1; 1 1 1
Parking :(Y/N) N ;(Y/N) N ;(Y/N) N ;(}'/N) N
Bus Stops 0: 0: 0; 0
Con. Peds 01 0: 0: 0
Ped Button :(Y/N) Y 11.5 s;(Y/N) 'f 11.5 s;(Y/N) Y 17.5 s;(Y/N) Y 17.5
Arr Type 3 3 3 3 3 3 3 3
RTOR Vols : 01 0; 0: 0
Lost Time I1.00 3.00 3.0011.00 3.00 3.0011.00 3.00 3.00:1.00 3.00 3.00
Prop. Share:
Prop. Prot.: :
_________________________________________-_____________________________
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * Right
Peds * Peds
WB Left * :S8 Left
Thru * Thru
Right * Right
Peds * Peds
NB Right :EB Right
SB Right :WB Right
Green 33.OP :Green 17.OA
Yellow/AR 5.0 :Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: 41 45
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: A.dj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
_____ ____ _______ _____ _____ _____ ___ _____ ---
EB L 140 227 0.900 0_ 617 39.5 0 9.0 B
TR 2155 3695 0.387 0.583 4.4 A
WB L 214 347 0.336 0.617 4.0 A 4.7 A
TR 2165 3711 0.465 0.583 4.7 A
N8 L 253 722 0.689 0.350 16.0 C 13.0 B
TR 567 1792 0.347 0.317 10.3 B
S8 L 315 699 0.289 0.350 9.3 B 10.6 B
TR 537 1695 0.462 0.317 11.1 8
intersection Delay = 8.0 sec/veh intersection LOS = B
Lost Time/Cycle, L = 2.0 sec Critical v/c(x) = 0.824
APPENDIX F
HC'3: llnsignalized Intersections Release 2.1d Paqe
Center For- Microcomputers in Transportation
University of Fiorida
512 Weil Hall
Gainesville, FL 32611-2063
Ph: (904) 392-0378
------------------ __________________------- __________________
Streets: (N-S.) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 10/25/97
Other Information ...... ...am Pm 1997 short long bk:grd total
Two-way Stop -con tr olied Intersection
Northbound I Southbound Eastbound I Westbound
L T R L T R; L T R i L T R
�_-__ __-_ _____--_ ____-_______ ____ _____-_
No. Lanes 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield N; N;
Volumes 210 40� 35 215 25 30
PHF .9 .91 .9 .9 .9 .9
Grade 0 0 ' 0
MC's (%)
SU/RV's (%);
i
CV`s (%) ;
PCE`s ;1.10 - :1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
__________________________________________________________________
Gap (tg)
Time (tf)
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor-
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2-Id Page 2
Worksheet for TWSC Intersection
-------------------------------------------
Step 1: RT from Minor Street WB
Conflicting Flows: (vph)
255
Potential Capacity: (pcph)
1026
Movement: Capacity: (pcph)
1023
Prob. of Queue -Free State:
0.96
--------------------------------------------------------
Step 2: LT from_ Major_ Street
SB
NB
_
Conflicting Flows: (vph)
271
Potential Capacity: (pcph)
1265
Movement Capacity: (pcph)
i265
Prob. of Queue -Free State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:-
_______________________----------------0.96
Step 4: LT from Minor Street__-___
---_____--_-_
WBEB
____________________________ _---_-
Conflicting Flows: (vph)
-----_--_-_
533
Potential Capacity: (pcph)
520
Major LT, Minor TH
Impedance Factor:
0.96
Adjusted Impedance Factor:
0.96
Capacity Adjustment Factor
due to Impeding Movements
0.90
Movement Capacity: (pcph)
________________________________________________________
499
intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
______ ______ ______ ______________ _____
(sec/veh)
_________
WB L 31 499 >
690 5.8
0.3 B
5.3
WB R 36 1028 >
SB L 43 1265 2.9
0.0 A
0.4
Intersection Delay =
0.6 sec/veh
HCS: Unsignalized intersections Release 2.1d Page
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
______ -_-_____-___
_ _ _
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd -
Date of Analysis......... 10/25/97
Other Information........ am pm 1997 sh or-t long bkgrd total
Two-way Stop -controlled In r_=.ection
--- =-----------
----____
Northbound Southbound Eastbound Westbound
L T R L T R- L T R L T R
No. Lanes 0 1 < 0 ; 0 > 1 0 ; 0 0 0 0 > 0 0
Stop/Yield N; N;
Volumes 115 35; 25 155 15 20
PHF .9 .9; .9 .9 .9 - .9
Grade 0 0 0
MC's (%)
SU/RV's (%)
CV's (%)
PCE's :1.10 :1.10 1.10
_______________________________________________________________________
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
__________________________________________________________________
Gap
(tg)
Time (tf)
Left Turn Major
Road
5.00
2.10
Right. Turn Minor-
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1d Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor- Street .WB EB
Conflicting Flows: (vph)
146
Potential Capacity: (pcph)
1165
Movement Capacity: (pcph)
1165
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major- Street-_-_-
SBNB
____________________________
Conflicting Flows: (vph)
__________---_
167
Potential Capacity: (pcph)
1427
Movement Capacity: (pcph)
1427
Prod. of Queue -Free State:
0.98
TH Saturation Flow Rate: (pephp i)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prod.
of Queue -Free State
___________________ ___________________0.98
Step 4: LT from Minor Street
_____________
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
-
343
Potential Capacity: (pcph)
666
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
________________________________________________________
650
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
________ _____ ______ _______ -------
(sec/veh)
W8 L 19 550 >
_____
---------
863 4.4
0.0 A
4.4
WB R 24 1165 >
SB L 31 1427 2.6
0.0 A
3.4
Intersection Delay =
0.6 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 10-25-1997
Center For Microcomputers In Transportation
Streets: (E-W) elizabeth (N-S) city park
Analyst: Matt File Name:
Area Type: Other ' -25-97 em pm
Comment: 1997 short long bkgrnd total
Eastbound Westbound I Northbound Southbound
L T R L .i R L T R L T R
---- ------- ---- --- --- ----
No. Lanes 1 2 < 1 2 < ; 1 1 < 1 1 <
Volumes 75 550 35; 10 145 35; 20 40 35; 80 55 35
PHF or PK15;0.90 0.90 0.90;0.90 0.90 0.90:0.90 0.90 0.90:0.90 0.90 0.90
Lane W (ft)112.0 12.0 ;12.0 12.0 ;12.0 12.0 ;12.0 12.0
Grade 0 0 0 ; 0
% Heavy Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds 0� 0; 0; 0
Ped Button !(Y/N) Y 11.5 s;('Y/N) Y 11.5 s;(Y/N) 'Y 17.5 s;(Y/N) Y 17.5
Arr Type 3 3 3 3 _ 3 3 3
RTOR Vols 0i 0; 0; 0
Lost Time ;1.00 3.00 3.00;1.00 3.00 3.00:1.00 3.00 3.00;1.00 3.00 3.00
Prop, Share;
Prop. Prot.;
_______________________________________________________________________
Signal Operations
Phase Combination 1 2 3 4: 5 6 7 a
EB Left * ;NB Left
Thru x Thru
Right * Right
Peds * Peds
WB Left 156 Left
Thru * Thru
Right * Right
Peds ` Peds
NB Right :EB Right
SB Right IWB Right
Green 33.OP ;Green 17.OA
Yellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: N1 #5
-------------------------- -------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat V/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
_____ ____ _______ _____ _____ _____ ___ _____ ---
EB L 712 1154 0.117 0.617 3.1 A. 4.0 A
TR 2175 3729 0.314 0.583 4.1 A
WB L 297 482 0.037 0.617 2.9 A 3.5 A
TR 2130 3652 0.099 0.583 3.6 A
NB L 479 1368 0.046 0.350 8.3 6
TR 554 1749 0.150 0.317 9.5 8
SB L 499 1425 0.178 0.350 8.8 8 9.2 B
TR 561 1771 0.178 0.317 9.6 B
Intersection Delay = 5.1 sec/veh Intersection LOS = 6
Lost Time/Cycle. L = 4.0 sec Critical vjc(sj = 0.263
_______________________________________________________________________
HCM: SIGNALIZED INTERSECTION SUMMARY 'Version %.4c 10-25-1997
Center For Microcomputers In Transoort_'ion
Streets: (E-W) elizabeth (N-S) city pa-k.
Analyst: Matt File Name:
Area Type: Other -25-97 am pm
Comment: 1997 short long bkgrnd total
Eastbound Westbound Norchbo_.d Southbound
L T R L T R L T R ' L T R
1 --- ---- --- ---- - -- ----I---- - -----'---- ---- ----
No. Lanes 1 2 < ; 1 2 < 1 1 1 1 <
Volumes 90 475 65; 50 590 65! 120 95 45; 65 60 115
PHF or PK15!0.90 0.90 0.90:0.90 0.90 0.90;0.90 0.90 i.9010.90 0.90 0.90
Lane W (ft);12.0 12.0 ;12.0 12.0 ;12.0 12.0 ;12.0 12.0
Grade 0 0 0 0
% Heavy Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 1
Parking ;(Y%N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con, Peds 0; 0� 0; 0
Ped Button ;(Y/N) Y 11.5 s;(Y/N) 'Y 11.5 s;(Y/N) Y i- 5 s;(Y/N) Y 17.5
Arr Type 3 3 3 3 3 3 3 3
RTOR Vols 0; 0; 0; 0
Lost Time :1.00 3.00 3.0011.00 3.00 3.0011.00 3.00 °..00;1.00 3.00 3.00
Prop. Share; ;
Prop. Prot.; ,
________________________________________________________-______________
Signal Operations
Phase Combination 1 2 3 4; 6 7 8
EB Left * ;NB Left
Thru * Thru `
Right * Right
Peds * Peds '
WB Left * ISB Left '
Thru " Thru
Right Right '
Peds K Peds
NB Right ;EB Right
SB Right jWB Right
Green 33.OP ;Green 17.:=.
Yellow/AR 5.0 ;Yeiiow/A.K 5--
Cycle Length: 60 secs Phase combination order: 4! =5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v%c g/C Approach:
Hvmts Cap Flow Ratio Ratio _alay LOS Delay I_VS
_____ ___________ _____ _____ _____ ___ _____ ---
ER L 252 409 0.396 0.617 4. A 4.1 A
TR 2155 3695 0.292 0.583 4.1 A
WB L 333 540 0.166 0.617 3.2 A 4.2 A
TR 2162 3707 0.353 6.583 4.1. A
NB L 317 905 0.420 0.350 i0.i B 10.1 8
TR 567 1791 0.275 0.317 i0.0 B
SB L 365 1042 0.197 0.350 B.E B 10.0 6
TR 537 1696 0.363 0.317 �0.4 B
Intersection Delay = 5.7 sec/veh i-:ersection LOS = B
Lost Time/Cycle. L = 2.0 sec Critical v/c(--i -.4'35
_______________________________________________________________________
APPENDIX E
HCS: Unsignaiized intersections Release 2.ld
Page 1
Center For- Microcomputers In Transportation
University of Florida
51,'_ Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
- - - — -- ------ - ---- — - --- --- -- ----- ---- -- - ------
--- - — --- ---- --
---------------
Streets (N-S) city park
(E-W)
---------------
site access
Major- Street Direction.... NS
Length of Time Analyzed__. 6ii (min)
Analyst ................... mjd
_Date of Analysis.......... i0/25/97
Other Information......... am 1997 short
long
bkgrd iota!
,pm
Two-way Stop -controlled Inter tion
Northbound Southbound Eastbound
Westbound
L T R L T R L
____
T
R L T R
--__---- ____ ----
�___- ____ ___----- -_-_ ____
No. Lanes 0 i < 0 1 0 1 0 0
___-
0
0 0 > 0 < 0
Stop/Yield N; N
Volumes 204 32; 31 210
19 27
PHF .9 .9; .9 .9
.9 .9
Grade J J
0
MC's (%)
SU/RV's (%);
C V's (%)
PCE's L 1O
---------------------------------------------------------------
:1.10 1.10
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
____________________________________________ ___-__-_--__--_
Left Turn Major- Road 5-00 2.10
Right Turn Minor Road- 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsignaiized intersections Release 2.1d Page 2
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
245
Potential Capacity: (pcph)
1040
Movement Capacity: (pcph)
1040
Prob. of Queue -Free State:
0.91
---------------------------------------------------------
fromStreet
Step--------------------------------------------------------
SB
NB
_Major
_---____-_
Conflicting
Conflicting Flows: (vph)
_--_
263
Potential Capacity: (pcph)
1285
Movement Capacity: (pcph)
1285
Prob. of Queue -Free State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
512
Potential Capacity: (pcph)
535
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
'
Movement Capacity: (pcph)
________________________________________________________
517
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (peph)(sec/veh) (veh)
______ _______ _______ _____
('sec/veh)
---------
________ ______ ______
WB L 23 517 >
1135 5.3
0.2 B
5.3
WB R 33 1040 >
SB L .,, 1285 2.9
0.0 A.
0.4
intersection Delay =
0.6 sec/veh
HCS: Unsignalized Intersections Release 2.1d Page
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
tiainesville. FL 32611-2083
Ph: (904) 392-0378
-------------------------"--------------------------------------------
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 0%25/97
sh Other Information ........ .am pm 1997 ort long bkgrd total
Two-way Stop -controlled I rsection
---1 Northbound _bound_=,==Southbound--'== Eastbound -_-,_-Westbound
_--
Nor
I_ T R L T R L T R L T R
lobo_ ____ ___-____ ____ ________ ____ ________ ____ _---
No. Lanes ; 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield N; N
Volumes 111 31; 25 149 ; 8 15
PHF .9 .9; .9 .9 .9 .9
Grade 0 0 i 0
MC's (%)
SU/RV's (%)'
CV's (%)
i
PCE's ;1.10 ; ;1.10 1.10
----------------------------------------------------------- ------- --
Adjustment Factors
Vehicle Critical Follow-up
Maneuver cap (tg) Time (tf)
__________________________________________________________________
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: IUnsignaiized Intersections Release 2.1d Page 2
Worksheet for TWSC intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
140
Potential Capacity: (pcph)
1176
Movement Capacity: (pcph)
i176
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major_ _ -_Street - -
_____________________
- _ __- SB
NB
Conflicting Flows: (vph)
157
Potential Capacity: (pcph)
1443
Movement Capacity: (pcph)
1443
Prop. of Queue -Free State:
0.98
TH Saturation Flow Rate: (pcphpl)
i,•00
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
----------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
334
Potential Capacity: (pcph)
678
Major LT, Minor TH
impedance Factor:
0.98
Adjusted impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
_________________________boob_-___-_____________________
662
Intersection Performance Summary
Avg_
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (peph)(sec/veh) (veh)
______ __boob _______ _______ _____
(sec/veh)
---------
________ ______
WB L 10 662 >
928 4.0
0.0 A
4.0
WB R i9 1176 >
SB L 31 1443 2.5
0.0 A
0.4
Intersection Delay =
0.5 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 10-25-1997
Center For Microcomputers In Transportation
Streets: (E-W) (E-W) elizabeth (N-S) city park
Analyst: Matt File Name:
Area Type: Other- 10-25-97am pm
Comment: 1997 shor long Q kgrnd total
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
�____ ____ ___-__-_ __-_ __----__ ____ _____-_i_ ____ ----
No. Lanes 1 2 < ; 1 '2 < 1 1 < 1 1 <
Volumes 71 547 351 7 141 34; 20 37 32; 73 52 32
PHF or PK1510.90 0.90 0.90:0.90 0.90 0.90;0.90 0.90 0.90:0.90 0.90 0.90
Lane W (ft);12.0 12.0 112.0 12.0 I12.0 12.0 ;12.0 12.0
Grade 0 0 0 0
% Heavy Veh; 1 1 1; 1 1 1; 1 1 i; 1 1 1
Parking ;(Y/N) N ;(Y/N) N - ;(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds 0; 0; 0; 0
Fed Button ;(Y/N) 'Y 11.5 s;('Y/N) 'Y 11.5 s;(Y/N) Y 17.5 s;(Y/N) Y 17.5
Are Type 3 3 1 3 3 3 3 3 3
RTDR Vols i 0; 0; 0; 0
Lost Time ;1.00 3.00 3.00:1.00 3.00 3.0011.00 3.00 3.00;1.00 3.00 3.00
Prop. Share;
Prop. Prot.;
_______________________________________________________________________
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * Right
Peds * Peds
WB Left * ;SB Left
Thru * Thru
Right * Right
Pads * Peds
N8 Right ;EB Right
SB Right ;WB Right
Green 33.OP ;Green 17.OA
'fellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: 41 #5
_______________________________________________________________________
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
____ _______ _____ _____ _____ ___ _____ ---
EB L 716 1165 0.i10 0.617 3.1 A 4.0 A
TR 1175 3728 0.312 0.583 4.1 A
W6 L 299 465 0.027 0.617 2.9 A 3.5 A
TR 2130 3652 0.096 0.583 3.6 A
N6 L 466 1388 0.045 0.350 8.3 B 9.2 B
TR 554 1749 0.i39 0.?17 9.5 B
SB L 506 1447 0.160 0.350 8.7 B Q.2 6
TR 561 1773 0.167 0.317 9.6 B
Intersection Delay = 5.1 sec/veh intersection LOS B
Lost Time/Cycle. L = 4.0 sec Critical v/c(x) = 3,255
_______________________________________________________________________
HCM: SIGNALIZED INTERSECTION SUMMARY Version ?.4d 10-25-1997
Center- For Microcomputers in Transportation
----------------
Streets: (E-W) elizabeth (N-S) city park
Analyst: Matt File Name:
Area Type: Other 10-25-97 am pm
_
Comment: 1997 short _ long-bkgrnd total
=-
------------ -----------------------
Eastbound 'Westbound Northbound Southbound
L T R L T R L T R L T R
---- - -- ----'---- - - - --- --- --- ---- ---- ----
No. Lanes 1 2 "i < 1 1< 1 1<
Volumes 86 473 65: 49 589 59; 118 91 42; 61 57 Ill
PHF or PK15;0.90 0.90 0.90:0.90 0.90 0.90:0.90 0.90 0.90:0.90 0.90 0.90
Lane W (ft);12.0 12.0 ;i2.0 12.0 ;12.0 12.0 ;12.0 12.0
Grade 0 - 0 0 0
% Heavy Veh; 1 1 i; 1 1 1; 1 1 1; 1 1 1
Parking I(Y/N) N ;(Y/N) N ;(Y/N) N �(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds 0; 0; 0; 0
Fed Button ;('Y/N) Y 11.5 s;(Y/N) f 11.5 s;(Y/N) 'Y 175 s;(Y/N) Y 17.5
Arr Type ss 3 3 3 3 3 3
RTOR Vols 0; 0; 0; 0
Lost Time ;1.00 3.00 3-00:1.00 3.00 3.00:1.00 3.00 3.00;1.00 3.00 3.00
Prop. Shares
Prop. Prot. , i 1 I
------------------------------------ c__-__________________-____________
Signal Operations
Phase Combination 1 2 3 4; -5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * Right
Peds * Peds
WB Left * :SB Left
Thru 1tl Thru
Riaht * Right
Peds * Peds
N8 Right :EB Right
SB Right ;WB Right
Green 33.11P ;Green i7.OA
Yellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
._____________________________________________________________________
Intersection Ferformance Summary
Lane Group: Adj Sat v/r g/C Approach:
Mvrnts Cap Flow Ratio Ratio Delay LOS Delay LOS
_____ ____ _______ _____ _____ _____ ___ _____ ---
EB L 251 416 0.374 0.617 4.1 A 4.1 A
TR 2155 3694 0.291 0.563 - 4.1 A
WB L 334 542 O.i62 0.617 3.2 A 4.1 A
TR 2165 3711 0.349 0.583 4.3 A
NB L 327 9.>5 0-400 0.350 10.0 B 9.9 6
iR 567 1792 0 261 0.317 9.0 8
S6 I. 375 10;11 0.i3i 0.350 8.6 B 9.9 b
TR 5:37 i695 0.347 0.317 10.3 B
Intersection Delav = 5.6 sec/veh intersection LOS = 8
Lost Time/Cycle, L = 2-0 sac Critical v/c(x) = 0.384
APPENDIX D
eoVrG -3
l-r�PJ�d�1'�•-- 30 ��w
TRCSC) - z
F F N •. 7 Z
72
�BL) >z
14-c) ,-�)P � - i 6
p(-= Ak LOAD, V-Ac-r0 F- < /. Z
Z- o — a
t
I�UV1E
(
Multimodal Transportation Level of Service Manual
LOS Standards for Development Review - Bicycle
a
Figure 7 Bicycle LOS Worksheet
level of service -connectivity
nwinnan actual proposed
base connectivity: C 8
specific connections to priority sites:
description of applicable
destination area within 1,320'
including address
C S 0, Est aF
destination area
classification
(see text)
IIEIEIEI
P. 20
City of Fort Collins Transportation Master Plan
Multimodal Transportation Level of Service Manual
LOS Standards for Development Review - Pedestrian
Figure 6. Pedestrian LOS Worksheet
project location classification: ?&DES-rFIj4,V IlST(-lC—T (enter as many as apply)
FLI
ID
ID
description of applicable
destination area within 1,320'
including address
or- -5Nic"-05
5-r2cGT 5
C'AAA?0S �fi st
5cl �Ag�55-n{
destination area
level of service (minimum based on project location classification)
classification
(see text)un
mo r
FI
s<an q—
tong.
�NgYr7UTr
nlvinnun
A
A
r%
4
A
actual
�
A
proposed
/,�
B
Q
I
larm-MIMIUMIMIN
Invinnnn
actual
proposed
n19➢n111111
xnrd
proposed
p• CS
City of Fort Collins Transportation Master Plan
APPENDIX C
HCS: Unsignalized Intersections Release 2.id Page I
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
----------------------
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis .......... 10/% i9
Other Information....._... am pm 1997 short long bkgrd 'total
Two-way Stop -controlled Inters io
Northbound Southbound Eastbound I Westbound
L T R L T R L T R L T R
�____ ___- ___----- ____ __------ ____ __-_i---__ ___- ----
No. Lanes 0 i < 0 , 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield N1 N
Volumes 189 32I 31 201 19 27
PHF .9 .9; .9 .9 ; .9 .9
Grade 0 0 0
MC's (%) I ,
SU/RV's (%)!
CV's (%)
PCE's 1.10 ;1.10 1.10
----------- -- ----------------------------- ----- ---- - ------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
-----------
---------------------------------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor-
Road
6.50
3.40
HCS: Unsignalized intersections
Release 2.1d
Worksheet for TWSC intersection
--------------------------------------------------------
Step 1: RT from Minor Street
WB F_B
--------------------------
Conflicting Flows: (vph)
------------------ —
228
Potential Capacity: (pcph)
1061
Movement Capacity: (pcph)
1061
Prob. of Queue -Free State:
0.97
--------------------------------------------------------
Step - LT from MajorStreet
S8 N6
________________________________________________________
Conflicting Flows: (vph)
246
Potential Capacity: (pcph)
1309
Movement Capacity: (pcph)
1309
Prob. of Queue -Free State:
0.97
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
i
Major LT Shared Lane Prob.
of Queue -Free State:
0.97
--------------------------------------------------------
Step 4: LT from Minor Street
WB EB
----------------------- --------------------
Conflicting Flows: (vph)
---------
485
Potential Capacity: (pcph)
555
Major LT, Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
________________________________________________________
537
Intersection Performance Summary
Avg.
95%
Flow
Move Shared Total
Queue
Approach
Rate
Cap Cap Delay
Length LOS
Delay
Movement
--------
(pcph)
(pcph) (pcph)(sec/veh)
______ ______ _______
(veh)
_______ _____
(sec/veh)
_________
WB L
-------
23
537 >
75,' 5.1
u. i 8
5.1
WB R
33
1061
SS L
.,'
1309 2.8
0.0 A
O.d
intersection Delay =
0.6 seciveh
Page-2
HCS: Unsignalized Intersections Release 2-id Page 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
Streets: (N-S) city park (E-W) site access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis........ /25%9
Other Information -------- am pm 1997 short long bkgrd total
Two-way Stop -controlled In rs ec do
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
____ ____,____ -___ ____,____ ____-_______
No. Lanes 0 1 < 0 0 > 1 0 0 0 0 0 > 0 < 0
Stop/Yield N; N
Volumes 109 31: 25 137 a 15
PHF .9 Gi.9
Grade 0 0 0
MC's (%)
SU/RV's (%); ;
CV's (%)
PCE's :1.10 :1.10 1.10
---------- -------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
------------
Gap (tg)
-----------------------
Time (tf)
----------------------------
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Let+ Turn Minor
Road
6.50
3.40
HCS: Unsignalized intersections Release 2.1d Page 2
Worksheet for TWSC intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
i38
Potential Capacity: (pcph)
i179
Movement: Capacity: (pcph)
1179
Prob. of Oueue-Free State:
0.98
-------------------------------------------------------
Step 2: LT from Major Street
SB
NB
-- --
---------------------------- Conflicting Flows --
155
Potential Capacity: (pcph)
1446
Movement Capacity: (pcph)
1446
Prob. of Queue -Free State:
0.98
TH Saturation Flow Rate: (pcphpi)
1700
RT Saturation Flow Rate: (pcphpi)
Major- LT Shared Lane Prob.
of Queue -Free State:
0.98
--------------------------------------------------------
Step 4: LT from Minor Street
we
EB
--------------------------------------------------------
Conflicting Flows: (vph)
318
Potential Capacity: (pcph)
693
Major LT, Minor TH
Impedance Factor:
0.98
Adjusted impedance Factor:
0.90
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
__.______________________________________________________
677
Intersection Performance Summary
Avg,
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (peph)(sec/veh) (veh)
________ ______ ______ ______ _______ _______ _____
(sec/veh)
_________
WB L 10 677 >
939 4.0
0.0 A
4.0
WB R 19 1179 >
SB L 31 1446 2.5
0.0 A
0.4
Intersection Delay =
0.5 sec/veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 10-25-1997
Center For Microcomputers In Transportation
Streets: (E-W) elizabeth (N-S) city park
Analyst: Matt File Name:
Area Type ier 10-25-4_7 am pm
Comment: i99i short long bkgrnd total
Eastbound ; Westbound Northbound Southbound
L T R L T R 1 L T R , L T R
No. Lanes 1 2 < ; 1 2 < ; 1 1 ; 1 1 <
Volumes 67 516 33 7 133 32I i9 35 30 69 49 30
PHF or PK150.90 0.90 0.90�0.90 0.90 0.9010.90 0.90 0.90;0.90 0.90 0.90
Lane W (ft);12.0 12.0 12.0 12.0 ;12.0 12.0 :12.0 12.0
Grade 0 0 0 0
% Heavy Veh; 1 1 1; 1 1 1; 1 1 1; 1 1 i
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds 0; 01 0; 0
Fed Button ;(Y/N) 'f 11.5 s;(Y/N) Y 11.5 s;(Y/N) 'f 17.5 s;('t/N) Y 17.5
Arr Type 3 3 3 3 3 3 3 3
RTGR Vols 0; D; 0; 0
Lost Time �1.00 3.00 3.00; i.00 3.00 3.00;1.00 3.00 3.00;1.00 3.00 3.00
Prop. Share; ;
Prop. Prot.;
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * Right
Peds ` Peds
WB Left * ;56 Left
Thru " Thru
Right * Right
Peds * Peds
NB Right DEB Right
SB Right ;WB Right
Green 33.OP ;Green 17.OA
'fellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
_______________________________________________________________________
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
____ _______ _____ _____ _____ ___ _____ ___
EB L 734 1190 0.101 0.617 3.0 A 4.0 A
TR 2175 3728 0.294 0.583 4.1 A.
WB L 328 529 0.025 0.617 2.9 A 3.5 A
TR 2130 3652 0.091 0.563 3.6 A
NB L 494 1412 0.042 0.350 6.3 6 9.2 B
TR 555 1752 0.130 0.317 9.4 B
S6 L 513 1465 0. 150 0.350 8.7 6 0.1 B
TR 562 1774 0.155 0.317 1.5 8
intersection Delay = 5.0 sec/veh Intersection LOS A
Lost Time/Cycle. L = 4.0 sec Critical Vic(N) = 0.240
_______________________________________________________________________
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d 10-25-1997
Center For Microcomputers In Transportation
Streets: (E-W) elizabeth (N-S) city park
Analyst: Matt File Name:
Area Type: her - 10-25-97 am pm
Comment: 997 short long bkgrnd total
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ----I---- --------'---- --------'---- --- --
No. Lanes 1 2 < 1 2 < 1 1 < 1 1
Volumes 81 446 61 46 556 56; 111 86 401 58 54 105
PHF or PK15;0.90 0.90 0.90; 0.90 0.90 0.90; 0.90 0.90 0.90;0.90 0.90 0.90
Lane W (ft);12.0 12.0 ;12.0 12.0 ;12.0 12.0 ;12.0 12.0
Grade 0 0 0 0
% Heavy Veh; 1 1 i; 1 1 1; 1 1 1; 1 1 1
Parking ;(Y/N) N �(Y/N) N ;(Y/N) N ;(Y/N) N
Bus Stops 0; 0; 0; 0
Con. Peds 0; 0; 0; 0
Ped Button ;(Y/N) Y 11.5 s;(Y/N) 'f 11.5 sj(Y/N) Y 17.5 s;(Y/N) 'f 17.5
Arr Type 3 3 3 3 ; 3 3 3 3
RTGR Vols 0; 0; 0; 0
Lost Time ;1.00 3.00 3.00:1.00 3.00 3.00;1.00 3.00 3.00:1.00 3.00 3.00
Prop. Share; ;
Prop. Prot.' '
-- --- ------
Signal Operations
Phase Combination 1 2 3 4 5 6 7 8
EB Left * ;NB Left
Thru * - ; Thru
Right * ' Right
Peds * - Peds
WB Left * ;58 Left
Thru * Thru
Right * Right
Peds * Peds
NB Right ;EB Right
SB Right ;WB Right
Green 33.O1p ;Green 17.0A
Yellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: #1 #5
_______________________________________________________________________
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
____ _______ _____ _____ _____ ___ _____ ---
EB L 278 451 0.324 0.617 3.8 A 4.0 A
TR 2155 3694 0.275 0.583 4.0 A
WB L 36i 586 0.141 0.617 3.1 A 4.1 A
TR 2165 3711 0.330 0.583 4.2 A
NB L 338 966 0.364 0.350 9.7 B 9.8 B
TR 568 1793 0.247 0.317 9.9 B
SB L 386 1104 0.166 0.350 8.7 B 9.8 8
TR 537 1695 0.330 0.3i7 i0.2 8
Intersection Delav = 5.5 sec/veh Intersection LOS = B
Lost Time/Cycie, L = 2.0 sec Critical v/c(:<) = 0.338
APPENDIX B
CITY Or FORT C&jlA
IRWIN OPERATIONS SYSTEM USIGN AAQ MOMITQRIx
........
W"ek), S.1y fa, 'Yelot of .. 191,11 ...
...................
11: ]A P, I
— ............... — . ... ........ —1.
sts: NOMOM114 14: 000I001111402
. . .............
I..... _—
Comald: at
TNT CoLLI,S
ClKI,ty: I 411YER
LOC&tiwg CITY PKAK
KID Fkl?MTII Stermaloomi;
fdIMMMIL; Tall.
A"aft: 1.1
,Mt-U.th
.............
...... .. .............. . I .. ........ ....... ...............
S a 7 a 9
Will
..........
XWay
wMaT,"
IT. SIMI
.
Man T, KID T,u TH ul
..... .... .....
A,,.
A,.
at ;03
..... .....
44
......
44
a
N:OQ
34
11
31
0
0:110
so
to
10
a
U:ft
5
5
3
a
05:00
4
A
0
O&Z"
is
is
is
n
O?:QD
v
52
v
a
011!00
00
138
134
a
Gaza
in
in
in
a
10:00
121
126
126
0
It:=
124
12A
124
a
12:92
tx JOB
its
Ix
0
13:00
m 238
762
IS?
a
I':DO
179
174
US
0
15:00
m
m
201
0
16:110
ne
216
216
0
11:00
771
771
211
a
18:00
2*4
201
2"
0
19:00
20
IN
IN
a
14:00
215
215
215
0
21,40
153
153
153
0
22:00
ITS
175
I's
0
23:00
122
122
in
a
74:00
75
I'S
is
a
. .
Total,
.......................
..... ..... ..... ..... ----- -----
. 2m ilia
. ... .. . ... - - --------- -----------------------
V29
- -------- ------
32111
a
4 A.,
11.6 U.6
4 ." Tie,
10.6 U.4
M 1111c AT MKIM
"M 17:00 12:00 Naeg, Rover Marm,
m c6aftt
. 1" 206 -
P. MaK
M&K, 0:00 MITI am. wone turT,
ft C.,
.....................
IRS 234 -
.... ...... —
CITY W FORT COLLINS
TE"FFIC OPETIATIONIS SYSIFN O[Sillme &W molviloal"
11-00.1996
... "VeMly sultry F., wm of Mco,,wear, A. Is% ...
..... .......... ----------
...........
. ............
11:311
Pv I
File! n1I N0011. MM
........ . .......... ............................ .........
St.: ODOM1140, to: calloomild
. ...........
CoMMITI: 01
ClWT0Y#l: FORT COILLIXS
CdWW LMIREA
ImAtIGM: EUIABETW
C/O CITY PARK IMESTIMN
imr/c 1-1
Flaralit: La,W!
Llll-f t
.........
.... 1-1-11
10
.......... .. ......................
< 5 6
. ............. .............
1 9 a
. ----------- ...........
3,11,
..
W6.y
.......
WMa
T;m Sun
..
Mel, I. Wd
..... .... .....
TW FYI Sat
... .....
Avv.
Aq.
.......
169
...
as
a
43
43
43
4
"Too
is
12
is
a
20
20
20
0
N:m
23
23
07!00
a?
311
I
a
00:00
272
71,17
0
02:W
ns
m
0
10:0
3"
11so
a
11:00
174
310
JIB
0
I?:=
. am W,
Iiis
619
a
13:60
750 621
686
606
0
14: M
635
636
636
a
Is! (TO
"S
615
64S
Q
lfitw
614
am
680
0
17:W
10
10
743
a
19:00
723
793
193
a
12:40
922
622
$92
a
70:00
633
623
631
a
PUDO
$72
570
570
a
22:00
544
5u
544
a
23:00
463
46)
492
0
24:00
747
...
747
247
0
Total,
............
.....
81356 ?m
.................. -
..... ..... .....
- -
................... ------------- ..........................
9147
.......
9?42
..........
a
le AYq wkd"
02.7 34.1
I, A'g OMY
82.7 30.1
An Peak Ior Note
a— 12:00 12!00
X`,N, None Xnw
m Coot
. 430 601
P" "t4t, III NIPMM
KITTY 111:60 13:011
XMIIY Men. fteKe
P" Camt
--------- .............
793 621
--------------
-
.............. . ....................................
.... --------
..... . -
za'd 90S6-v9v-0L6 dgz:zl LS-GE-des co'd 9096-val'-OL6
dgz:zt Les-oc-day
Sep-30-97
12:12P
970-484-9508
P.02
111001H
CITY OF SORT Colt [NJ
12:16:12
TWFtC aWMTIDM
CITV or $URI colt [in
SYSTEN OESM AND MMITORIK
IKAl,IC QKFATIOM SYSID DESIGN WO MONITORIM
110.274-611,
1 09-1996
%-* reeky Smog FU veilk Of MGMff 4, 19"
Il:n
Fg I
............. --
------------------
. ... .................... . ............................
K .I, site Sixema" newt
714: Allmall.p"
St.; MGMIIIOS IS: OMCMIIA
caiAelfi: at
:jt,)TUAf: ;OR? -*Jtl*S
cility: L"Mot
Site 10
114, We Start,
Ae. 4, lose we,,
aeallar: City POK SIO
rLIZAACTM ADMITMINKIAND
N,mml: Lift
I"Ta I
El 12AS11" Kea E,A,e
Mar 10,
less Sul
.I,: I I
W. 2
w,,D CITY PAa Adj. Factor
1.00
.11 ."1"
.... ........
1.1. 1
CASTsioge), 4MI, 01, S A, Olvift 0, 2
............................
19
A 5
. . ... . ... ......... ......................
6 1 1 9
zaily
ad.,
......
I .. ............. . .............. . ...............
I ...
.......
rim S,A,
ft,, I..
"it Ift Fri set
Avg.
.0.
A.O.
Ir
AM Tur "WO T1,j IH Sit S,ei
0.11, WAW
*erid
Starts
A 5 6 1 4 1 to
A.q. 4'.
A.,
11:00
12
12
12
0
. ........... . ................
..........
0
HA lit
3344
b
D
0, 83
)&:=
I
L
a
Aa
Q 43
)S!OO
0
0
4
is
M
is is
29 28
MOO
9
0
5
Y
56 %
)?:M
is
is
is
a
6
lit IYT
V:w
so
56
%
9
1
591
Sol "I
MOD
71
79
13
0
5
525
573 5"
10:00
60
GO
60
a
9
462
42 442
11:00
0
65
65
a
to
371
311 M
12:00
126
Its
IN
174
0
11
Sol See
551 551
13,00
it,
i49
163
163
0
17M
717 611
02 "2
14:00
135
125
in
a
1
636
636 636
MDO
i's
145
145
0
2
503
US Sal
16:00
US
161
its
9
3
121
521 "1
11:00
ISM
199
199
a
to
AN As,
16:00
200
7w
200
a
5
SIR
5m 570
19:013
149
149
149
a
6
"A
594 S94
": 00
11*9
109
log
0
7
�4
124 V,
6
10
MOO
a
-
go
86
0
9
313
315 315
22:00
10
to
I'll
lot Sol
ISM
541
Is
a
11
M
if, 115
24:00
23
71
73
0
.... . .....
.... . ..... ..... ..... .. ..
.. ..... ..... .....
.......
... ...
.......
TOTALS
13" W,
9210 9210
.Qtak.
165A
575
1943
1943
a
.........
.........................
..
.......
--------
............ .. .... . ....................................
.... ....
Avg WO
62.0% 39.36
1,kney Intel:
9979
Avg 00
Go.ch )9. A
ryiq total:
0
% Avg viols,
oi. I
n.s
t A's oil
ft. 1
29.6
An peek
11:00 Q1:00
6raft total:
"M
c.t
sm Sol
0 pet. .r W".
'10`0 17:00
12:c0 ftre We No,,,
AR COW
- 179
119
P% F,ft
12:00 12:40
C.t
let 611
AN P.IK .1 Agne
flft 18:01)
13; OD Me" '"A"t N"
••..............
-------
m (0i,,t
......................
ISO
lie
.. .... ................... .......
.....
.......
..
10"d 13096-Vat-01.6 dSz:zl Ls -OE -day
Site faG :
City of Fort Collies Traffic Oeenbons
City of Fart Collins traffic ONrroons
P$ Streit: City Park
City Pori
PAGE: 1
Sl to C041 . 0000011e
PAGE: I
Fi Strut: Eivama:e
i1LE: 114-1-96
N-S Strait: city Perk
FILE. 114.1-96
E•9 Street: Elizabeth
eletmar : Clear/Cold
bveNents by: Primary
DATE. 11INS5
Nmatur : Clear/fold
Ibvesmis by: PIImary
DATE: IMAM
Pike PF.iOO ,WLYSIS FOR THE PERIOD. 12:DO PN - 1:00 PR
PEm PERIM AMYSIS FOB THE PERIOD; 4:30 PN - 5:30 PN
DIRECTION
START
P At NR ........... VOINS ........... ......
PERCENTS .......
OIRECTIOlt START
POI( HR ........... VOWNES ........... ......
PERCENTS
FROM
-----------
PFee HIM
_----------------
F46e FedS Allen Teru Left Total Poll
-------------- ..-------------
Pilot TAru left
Floor! Flat HOUR
---- ---------- --------
FACTOR Pill Right fnra aft Total Peds
.......
Might TIVO Left
North
11 OO Pit
0.86 0 61 3S 63 fit -
11 22 40
.........
Norte 1:30 PI
-------- --------------- _.--- --------- ---------------
Mll 0 15 Q 11 210
--- -
36 30 34
East
v 00 Pit
5.93 D 94 495 49 136
I5 18 A
lest 4:30 PR
u.BR i 81 Sa a5 122 -
11 SO 9
Soute
12:00 PN
OX 0 is SIT 43 129 -
21 40 33
South 4:30 PN
0.15 0 59 AR IDS 253 -
23 14 43
Sell
12:00 PN
0.29 0 44 462 AR 114 -
1 19 14
lest Ma Pit
6.93 6 SA 396 51 506 -
12 18 10
Entire Intersection
Entire Intersection
Norte
12:00 PN
0.15 0 61 35 63 159 -
as 22 40
Norte 4:20 PN
108 0 16 13 11 210 -
36 30 11
imt
3.13 0 34 495 49 am
6 is 8
East
4.88 1 41 516 65 122 -
II do 9
South
0.91 0 35 51 43 129 -
21 40 33
South
0.15 0 59 85 109 253 -
23 34 43
as(
0.83 0 44 482 88 614 -
1 13 14
lest
0.93 0 Si lu 5t 508 -
12 18 10
City Park ;
N
City Park ;
N
..........
S
...--...-.
5
•••233 ..
;
;.. 217••••
(PeaS I 0 ; 61 35 ; 63 ............:
-.---------------•
0 [Peas ]
[PeAS J 0 ;
76 63 ; 71 ;.............
1 [Peas— 7
. .................
. .................
;
- - - 159 _'— __
94
..................
..................
,
- 210
..........
599
.......... 791
;
... Elizabeth
638
495
... Elizabeth
722
576
aft
-' —
49
51
65
482
b14,
Elizabeth ...
396
506
Elizabeth .--
............
580 ..........
------------'
,
526 ..........
as
-- --- t29 ----
...........-......
59
-- -- 253 ---
.... ..............
(Peas I f,
............ 43 ; 51 35 ;
0 (Peas 1
(Peas 7 0 ; ...... .. ; 109 ; 85 ; 59 ;
0 [Petls I
128
167 ..
...........,
. City Park
......
-•
. City Park
90'd 9096-V9b-OL6 d9Z=Zt L6-O£-daS 90'd 9096-1,9C-OL6 d9Z-ZT L6-OE-dmS
MATTHEW J. DELICH , P.E.
2272 GLEN HAVEN DRIVE
LOVELAND,CO 80538
TABULAR SUMMARY OF VEHICLE COUN ► S
ODae .Toy Date /o x'// 7 Day '%Ui"%/1/{V City /2,1 "/ C�G<.6vS R = RiOm tum
5 = STM,gm
INTERSECTION OF (: % / •'/I A' 4 AND 6" LL Z /1 /:' .: s'// L = Lett tum
TIME
BEGINS
•Imm SOUTH TOTAL
�� R S I L TOW Soutft
TOTAL
Want
TEam �
tmm NORTH
tmm EAST
from w=S
R I S L Total
R I S I L 7oW
R S L TOW
II71isI /I
Ilul
°/13 :' u8`/
I/.�.I�S /ILL
I/a,'>t;I1Gl;'h 113/q
11398
t -
116 I 71 ul 33
II
ro IA 1 /7 N 50 I
G =-1 / I /o
19 /:'/I/GI'"">'
N/83 1123.?
II I/f11o1:3 116
71/01i5 158 11
71%/11 3ti
I I S)I/ l :":0/A/
11/79
II If I '/ 1 7 1 .'< /
11 7
7 1 9 1 t 9 d °i n
1 7 1`/!/ 1 `/ 17
115'1 ' 11
1 7 0 II A/ 0
II I I
II
I II
I I
I I
II II
1301'/.1 lK 7119711>o
13 51171 7 q 11.13 k
3j o3 I 71
13 3151616 71/ 6 11
7FP' 11/0zo
I I I
I
I I U
I I I
I I I I
N II
II I I
I
I I II
I I t I
I I I I
I II
I I
I
I I
I I
I I I
II II
II I I I
I
I I I
I I
I I
I II
I
I
I I I N
I I I
I
I I
IIIII
II
pNN
II
I
II
I II
III
I
I
1
f-
1
17 1 rlo
/3 /0'/1I /7I 34
7 Y 113P0
•
//1/01/ "17
110
/?15A 747
7
II
S/3sa//7/
13),51•/,L'i
7
I
//% /v9/
/ I/
Ilo13`11�51/lti
133 / 111/ 0
11
1)71 Ito.-,7
1194' 11I
3
/
IIv/c
/:
7
y0
6It111:L31Sy
/1'/'/619 11fZ
701=
•LI
_
�
i I
:
• 1
fI
•�-= 1 `.gym=3
m
3 y I
�
:
4.
.m-.o �
II
i
w I
o
II
0
at
-----------------
A t
_
m
v
_
� I
m
I
_
S
U I
LL
I _.__
10
____ I
I
i
APPENDIX A
Table 5
Long Range Background Traffic Peak Hour Operation
Intersection
Elizabeth/City Park (signal)
City Park/Site Access (stop sign)
WB LT/RT
SB LT
Overall
Table 6
Level of Service
AM PM
B B
A B
A A
A A
Long Range Total Traffic Peak Hour Operation
Level of Service
Intersection AM PM
Elizabeth/City Park (signal) B B
City Park/Site Access (stop sign)
WB LT/RT A B
SB LT A A
Overall A A
AM/PM
0
1�15
1 /� 8/ i 97
�
n
tD
to t0
47/83
-F-198/828
10/68
99/120
768/664 uO oo m
49/90 co � +
N 1n
LONG RANGE BACKGROUND
PEAK HOUR TRAFFIC Figure 7
Cn
0
N N
N
AM/PM
Rounded to the Nearest
5 Vehicles.
� /30V///
15 15/25j
Y } �, �Site%�
a L�
o
R-
o
"' ^ "
50/90
- 200/830
/r 10/70 ELIZ
100/125 -7
770/665 u) 0 0
50/90 MLO
LONG RANGE TOTAL
PEAK HOUR TRAFFIC
Figure 8
20%-25%
---No ---------- 4�
55%-60%
N
TRIP DISTRIBUTION Figure 3
AM/PM
1/2--/I f
SITE GENERATED
PEAK HOUR TRAFFIC
Figure 4
0
e
0
A&
N
NO SCALE
Y
Q
a
a
W
SITE PLAN I Figure 2
ft
1
AM/PM
0
\N
�- N
15/27
r— 8/19
C >
o rn
32/56
—133/556
/-- 7/46
67/81 --o�
) } I
516/446 —
2 5!
33/61
o'Lon
Existing
Driveway
A
N
RECENT PEAK HOUR TRAFFIC
Figure 1
1A
Figure 1 shows the peak hour traffic counts at the
Elizabeth/City Park, and site access intersections. Only
turning movements related to the existing site driveway were
counted at the access. The existing access serves some uses
to the south, such as the McDonald's Restaurant. Raw count
data is provided in Appendix A. This intersection operates
acceptably as indicated in Table 2. Calculation forms are
provided in Appendix B.
This area is served by Transfort Routes 2, 3, and 11.
Each route provides 30 minute headways. Routes 2 and 11
operate about 12 hours a day and Route 3 operates about 16
hours a day. There are transit stops on many nearby corners
within 1320 feet of the site.
Appendix C show the LOS Worksheets for the bicycle and
pedestrian modes. Future level of service for these modes
will be acceptable. Existing transit level of service is D,
however, future level of service will be B. A calculation
sheet is provided in Appendix C.
Figure 2 shows the site plan for the Lofts at Campus
West. As shown, access to the site will be from City Park
Avenue. This is an existing, paved driveway. There are two
accesses from this driveway which serve the commercial area
to the south, primarily the McDonald's Restaurant. The trip
distribution used in these analysis is shown in Figure 3.
Figure 4 shows the site generated peak hour traffic at
the key 'intersections. Figure 5 shows the short range
background traffic at the key intersections. Figure 6 shows
the short range total peak hour traffic at the key
intersections. This is the sum of the site generated plus the
background traffic. The key intersections will operate
acceptably with background and total traffic as indicated in
Tables 3 and 4, respectively. Calculation forms are provided
in Appendices D and E.
Figure 7 shows the long range background traffic at the
key intersections. Figure 8 shows the long range total peak
hour traffic at the key intersections. Tables 5 and 6 show
the long range background and total peak hour operation.
Calculation forms are provided in Appendices F and G. The key
intersections will operate acceptably.
It is concluded that the Lofts at Campus West will meet
acceptable levels of service for transit, pedestrian, bicycle,
and motor vehicle transportation modes. The number of trips
that this development will introduce into the area street
network will be minimal.
�kk __ ..r
01)
LO
MEMORANDUM
o
co
'co
•
o
o
TO: John Donaldson, Timberline Property Management
Carl Glaser, Glaser Associates
cc
O
o
Brian Shear, Shear Engineering
�j
rn
Eric Bracke, Fort Collins Traffic Engineer
•
X.
Fort Collins Planning Department
z
a
;—
FROM: Matt Delich
w
J
DATE: October 28, 1997
•
>
T(^
W
o
SUBJECT: The Lofts at Campus West traffic study
0)
(File: 9779MEM1)
o
z
w
=
p
rn
The Lofts at Campus West is proposed to be located east
w
W
of City Park Avenue and north of West Elizabeth Street in Fort
o
Collins. The Lofts at Campus West will consist of 26
N
n
residential condominiums. Access to the site is proposed from
N
City Park Avenue at a location approximately 400 feet north
N
of West Elizabeth Street. Given the low trip generation from
the proposed use, a brief technical memorandum rather than a
detailed transportation impact study was deemed to be
appropriate. The proposed use will generate traffic that will
be over the 50 daily trip threshold that requires a traffic
study. This threshold is extremely low compared to industry
standards.
The trip generation for the proposed use was calculated
using data contained in Trip Generation, 5th Edition, ITE.
LV
Residential Condominium/Townhouse (code 230) was used in this
analysis. Table 1 shows the calculated trip generation for
Q.
a
this use. The expected trip generation is 155 daily trip
Z
ends, 11 morning peak hour trip ends, and 14 afternoon peak
"
W
w
hour trip ends.
Vz
z
The public street network in the area is essentially
J
Uj
complete. During the site visit (10/21/97), it was noted that
W
z
o
there are two through lanes in each direction on Elizabeth
Q
F
Street with separate left -turn lanes at City Park Avenue.
o
City Park Avenue has one lane in each direction with separate
y
left -turn lanes at Elizabeth Street. This intersection is
a
signalized. All approaches at the City Park/Plum intersection
have a single lane. This intersection has all -way stop sign
W
~
a�j
control. There are bike lanes on both Elizabeth Street and
_
u
Plum Street. City Park Avenue is designated as a bike route.
M
LL
There are attached sidewalks on each side of City Park Avenue,
<
cc
Elizabeth Street, and Plum Street. There are handicapped
Q
F-
ramps at all corners at the City Park/Plum intersection.
There are handicapped ramps at the southwest, northwest, and
northeast corners of the Elizabeth/City Park intersection.
AM/PM
0
��
N
I
15/27
8/19
011 S�i�t�e%
flLU11lG
to
34/59
r') "' r� —141 /589
r + � .0-- 7/49
71/86
547 473 -►
35/65 -�
SHORT RANGE BACKGR06ND
PEAK HOUR TRAFFIC Figure 5
to 411�.
rr1�i�7r
N
AM/PM
Rounded to the Nearest
5 Vehicles.
75/90
550/475
35/65 -�
SHORT RANGE TOTAL
PEAK HOUR TRAFFIC
20/30
�-- 15/25
35/65
145/590
/--10/50
fI
o in to
N CD d
N C.�
Site%
Figure 6
r
Land Use
The Lofts at Campus West
26 Condo DU (Rate)
Table 1
Trip Generation
Daily
A.M.
Peak
P.M.
Peak
Trips
Trips
Trips
Trips
Trips
in
out
in
out
155
2
9
9
5
(5.86)
(0.08)
(0.36)
(0.36)
(0.19)
Table 2
Current Traffic Peak Hour Operation
Level of Service
Intersection AM PM
Elizabeth/City Park (signal) A B
City Park/Site Access (stop sign)
WB LT/RT A B
SB LT A A
Overall A A
Table 3
Short Range Background Traffic Peak Hour Operation
Level of Service
Intersection AM PM
Elizabeth/City Park (signal) B B
City Park/Site Access (stop sign)
WB LT/RT A B
SB LT A A
Overall A A
Table 4
Short Range Total Traffic Peak Hour Operation
Level of Service
Intersection AM PM
Elizabeth/City Park (signal) B B
City Park/Site Access (stop sign)
WB LT/RT A B
SB LT A A
Overall A A