May 19, 1998
Project No: 1590-01-97
Re: Lofts at Campus West; Ft. Collins, Colorado
Grading Plan
* The swale along the north property line has slopes steeper than 4:1 going up to the
building. The slopes going up to the property line are 4:1. This swale will be maintained
by the owner. The owner has expressed their consent for this design and accepts the
responsibility for the maintenance.
* Spot elevations on the speed bumps / weirs have been modified to correspond to the
grading plan.
* Proposed contours tie into the existing contours.
* The overflow weir at the southeast corner consists of the 2 speed bumps / weirs and the
tall curb at the back of the trash disposal.
Alley Plan and Profile
* The notes for the curb installation along the Panhandler Pizza building have been revised.
Only one (1) door requires modification.
* Timberline Property Management has been in contact with the owners of the Town
Square Shops and the Panhandlers Pizza building. We can only assume that the
respective owners have contacted their tenants.
* Installation of the pan in the alley along the north side of the Town Square Shops will
require removal of the curb.
* The existing concrete pan will remain in place at the north end of the alley between the
buildings.
* Easements are still being worked out and will be provided prior to final approval.
* A detail of the additional step will be provided prior to final approval.
This concludes our response to your review comments concerning the final utility plans for Lofts
at Campus West. If you have further questions or comments, or i u require additional
information, call at 226-5334. Z/ A
Sincerely,
Mark Oberschmidt, Design Engineer
Shear Engineering Corporation
MEO / mo
cc: John Donaldson, Timberline Property Management
Carl Glaser, Glaser Associates
Brian W. Sheaj
Shear Engineer
May 19, 1998
Project No: 1590-01-97 MAY 2 2 RECT
Basil Bamdan
City of Ft. Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: Lofts at Campus West; Ft. Collins, Colorado
Dear Basil,
This letter serves as the response to your initial review comments concerning the final utility.
plans for Lofts at Campus West. We have addressed the utility plan review comments, as well as
written comments noted on your Project Comment Sheet dated October 29, 1997.
Please note that the site plan has been revised significantly since the initial submittal. The
primary change is that the number of buildings has been reduced from from five (5) to three (3).
The parking lot geometry has also been revised to facilitate the drive through at the McDonalds.
The parking spaces that were formerly along the south property line have been relocated to the
east property line. .
Project Comment sheet
* The basin delineation has been clarified.
* The offsite drainage easements are being worked out at present. They will be completed
and signed prior to final approval.
* Additional spot elevations have been provided at the northeast corner of the easternmost
building. This clearly indicates that the stormwater will flow into the parking lot.
* The existing trees will be removed. This has been worked out with the Natural Resources
Department.
* Offsite drainage patterns are shown on the drainage and erosion control plan with flow
arrows. There is no offsite water entering the site from the east. There is an existing curb
along the east property line which forces any water south to the ally. The proposed tall
curb will simply replace the existing curb.
* A detail of the outlet structure is provided on the grading and drainage plan.
* The erosion control section in the report has been expanded to include the items you
redlined in the initial report.
* Adequate detention is provided in the parking area.