May 19, 1998
Project No: 1590-01-97
Re: Lofts at Campus West; Ft. Collins, Colorado
This concludes our response to your review comments concerning the final utility plans for Lofts
at Campus West. If you have further questions or comments, or if you require additional
information, call at 226-5334.
Sincerely,
Mark Oberschmidt, Design Engineer
Shear Engineering Corporation
MEO / mo
cc: John Donaldson, Timberline Property Management
Carl Glaser, Glaser Associates
Brian W. Shear, P.E.
Shear Engineering Corporation
May 19, 1998
MAY 2 2 REC'C
Project No: 1590-01-97
Roger Buffington
City of Fort Collins Water and Wastewater Utility
700 Wood Street
Ft. Collins, Colorado 80521
Re: Lofts at Campus West; Ft. Collins, Colorado
Dear Roger,
This letter serves as the response to your initial review comments concerning the final utility
plans for Lofts at Campus West. We have addressed the utility plan review comments on the
attached redlines.
Please note that the site plan has been revised significantly since the initial- submittal. The
primary change is that the number of buildings has been reduced from five (5) to three (3). The
parking lot geometry has also been revised to facilitate the drive through into McDonalds. The
parking spaces that were formerly along the south property line have been relocated to the east
property line.
Plan Redlines
* The sewer and water lines have been reversed to avoid the conflicts you noted.
* The existing sewer line in Town Square Shopping Center is scheduled for potholing in
.the very near future. We will amend the profile of the sanitary sewer if needed and
document the pothole information prior to final approval.
* A private agreement for the relocation of the sanitary sewer service has been reached
between the owners of City Park Condominiums and Timberline Property Management.
* Curb stops and meter pits have been labeled.
* The water services to the three units have been increased in size to 1 1 /2". A detail has
been provided which requires that the closest edge of the meter pit be a minimum of five
feet (5.0') from the foundation.
* The hydrant has been relocated per the new parking lot geometry. The new location is
based on your comment for the previous layout. We understood that you wanted the
hydrant located at the end of the linenear the east property line in order to provide a
blowoff. If this is an incorrect assumption please let us know in your redlines.
* The notes have been revised per your redlines.
* The locations of the irrigation taps are provided.
* We are in the process of preparing the cross section through the building you requested.
This will be coordinated with Glaser Associates. The cross section will be completed
prior to final approval.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311