May 19, 1998
Project No: 1590-01-97
Re: Lofts at Campus
West; Ft. Collins, Colorado
* The primary purpose of the "speed bumps" at the eastern end of the site is to provide
detention storage. Detention is required for the site and this method of creating a berm in
the southeast corner provides the necessary detention volume and allows traffic to pass
albeit very slowly.
There is no need to encourage traffic to go onto the neighboring properde$. The "speed'
bumps" will be painted with a highly visible and reflective paint. Additional signage will
also be provided to instruct drivers to slow down. It must be noted that the primary access
into the parking lot for City Park Condominiums located east of the site is at Plum Street.
* All necessary curb and gutter details are now provided.
This concludes our response to your review comments concerning the final utility plans for Lofts
at Campus West. If you have further questions or comments, or if you require additional
information, call at 226-5334.
Sincerely,
Mark Oberschmidt, Design Engineer
Shear Engineering Corporation
MEO / mo
cc: John Donaldson, Timberline Property Management
Carl Glaser, Glaser Associates
Brian W. Shear, P.E�--�
Shear' Engineering Corporation
r
May 19, 1998
Project No: 1590-01-97
Sheri Wamhoff
City of Fort Collins Engineering Department
P.O. Box 580
Ft. Collins, Colorado 80524
MAY 2 2 lid
Re: Lobs at Campus West; Ft. Collins, Colorado
Dear Sheri,
This letter serves as the response to your initial review comments concerning the final utility
plans for Lofts at Campus West. We have addressed the utility plan review comments, as well as
written comments noted on your Project Comment Sheet dated December 4, 1997.
Please note that the site plan has been revised significantly since the initial submittal. The
primary change is that the number of buildings has been reduced from five (5) to three (3). The
parking lot geometry has also been revised to facilitate the drive through into McDonalds. The
parking spaces that were formerly along the south property line have been relocated to the east
property line.
Comment Sheet
Site Plan
* Refer to response prepared by Glaser Associates.
Landscape Plan
* Refer to response prepared by Glaser Associates.
Utility plans
* No structures are within easements.
* The existing curb cut will be closed.
* The primary access on City Park Drive will be rebuilt as needed. The drive entrance will
be concrete to the property line.
* A fifty foot setback from City Park Drive for the parking stalls is provided.
* The existing trees will be removed. This has been worked out between the Natural
Resources Department and Glaser Associates.
* Easements have been recorded for the offsite drainage conveyance.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282.031 1