HomeMy WebLinkAboutLOFTS AT CAMPUS WEST (THE) - PDP/FDP - 28-97 - CORRESPONDENCE - REVISIONS (25)August 24, 1998
Page 2
Project No: 1590-01-97
This concludes our response to your review comments concerning the final utility plans for Lofts
at Campus West. If you have further questions or comments, or if you require additional
information, call at 226-5334.
Sincerely,
Mark Oberschmidt, Design Engineer
Shear Engineering Corporation
MEO/mo
cc: John Donaldson, Timberline Property Management
Carl Glaser, Glaser Associates
Brian W. Shear,
Shear Engineering Corporation
August 24, 1998
Project No: 1590-01-97
Roger Buffington / Jeff Hill
City of Fort Collins Water and Wastewater Utility
700 Wood Street
Ft. Collins, Colorado 80521
Re: Lofts at Campus West; Ft. Collins, Colorado
Dear Roger and Jeff,
This letter serves as the response to your review comments concerning the final utility plans for
Lofts at Campus West dated June 23, 1998. We have addressed the utility plan review
comments on the attached redlines as follows.
Plan Redlines
The hydrant has been relocated at the west end of the site at the request of the PFA. A blowoff
has been provided at the eastern terminus of the line.
The curb stops have been moved to within 0.5 feet of the meter pits. The meter pits are a
minimum of 4.0 feet away from the seat wall.
The existing sewer stub to the property was potholed on 8/12/98. The sewer profile has been
updated to reflect the actual conditions based on the pothole information. The existing sewer
service from the manhole in front of Sullivan's Tavern was also located horizontally when the
potholes were completed. The service extends along the east side of the walk all the way to the
north property line. No modifications are required in our opinion since the service extends to the
property line.
Construction notes have been adjusted according to your comments and the plan revisions based
on the pothole data.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1