Loading...
HomeMy WebLinkAboutLOFTS AT CAMPUS WEST (THE) - PDP/FDP - 28-97 - CORRESPONDENCE - REVISIONS (25)August 24, 1998 Page 2 Project No: 1590-01-97 This concludes our response to your review comments concerning the final utility plans for Lofts at Campus West. If you have further questions or comments, or if you require additional information, call at 226-5334. Sincerely, Mark Oberschmidt, Design Engineer Shear Engineering Corporation MEO/mo cc: John Donaldson, Timberline Property Management Carl Glaser, Glaser Associates Brian W. Shear, Shear Engineering Corporation August 24, 1998 Project No: 1590-01-97 Roger Buffington / Jeff Hill City of Fort Collins Water and Wastewater Utility 700 Wood Street Ft. Collins, Colorado 80521 Re: Lofts at Campus West; Ft. Collins, Colorado Dear Roger and Jeff, This letter serves as the response to your review comments concerning the final utility plans for Lofts at Campus West dated June 23, 1998. We have addressed the utility plan review comments on the attached redlines as follows. Plan Redlines The hydrant has been relocated at the west end of the site at the request of the PFA. A blowoff has been provided at the eastern terminus of the line. The curb stops have been moved to within 0.5 feet of the meter pits. The meter pits are a minimum of 4.0 feet away from the seat wall. The existing sewer stub to the property was potholed on 8/12/98. The sewer profile has been updated to reflect the actual conditions based on the pothole information. The existing sewer service from the manhole in front of Sullivan's Tavern was also located horizontally when the potholes were completed. The service extends along the east side of the walk all the way to the north property line. No modifications are required in our opinion since the service extends to the property line. Construction notes have been adjusted according to your comments and the plan revisions based on the pothole data. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1