HomeMy WebLinkAboutLOFTS AT CAMPUS WEST (THE) - PDP/FDP - 28-97 - CORRESPONDENCE - REVISIONS (22)Decmber 10,1998
Project No: 1590-01-97
Basil Hamdan
City of Ft. Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80524
Re: Lofts at Campus West; Ft. Collins, Colorado
Dear Basil,
This letter serves as the response to your review comments concerning the final utility plans and
the Final Drainage and Erosion Control Report for Lofts at Campus West.
We have addressed the utility plan review comments, as well as written comments noted on your
Project Comment Sheet dated Decmber 1, 1998.
Written Comments
• Drainage easements are now dedicated to the city.
• Calculations of flows for cross sections C-C and D-D are now consistent.
• The Manning's n value for the Swale section L-L behind the units is now 0.06.
• Limits of pond inundation are now shaded on the Drainage and Erosion Control Plan.
Plan Redlines
• All details are located on the detail sheet. This is noted in the legend.
• The flowline elevation noted on the alley cross section F-F is correct. The report has been
corrected. The change has neglible effect on the results.
• The water surface elevation noted on the plan for section E-E has been corrected on the
plans.
This concludes our response to your review comments concerning the final utility plans for Lofts
at Campus West. We feel that all comments have been addressed adequately and a request for
mylars after your next review is appropriate. If you have further minor revisions, please call us
directly at 226-5334 so we can resolve the issue immediately.
Sincerely,
Mark Oberschmidt, Design Engineer
Shear Engineering Corporation
MEO / mo
cc: John Donaldson, Timberline Property Management
Dana Lockwood, Lockwood Architects
Sheri Wamhoff; City of Fort Collins Engineering
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311