HomeMy WebLinkAboutLOFTS AT CAMPUS WEST (THE) - PDP/FDP - 28-97 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject:
Planner:
Engineer:
Traffic Operations:
Date:
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Items Requested
Site land Plat Utility Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
Stormwater
Water/Wastewater
Traffic Operations
.
Trans. Planning
Transfort
Natural Resources
Park Planning
Totals
`I
i Revisions Routing She t
6
1
ENGINEERING: PAVEMENT
..r...mmmmmom
.........
-..
-BUILDING......i..m..m
LIGHT & POWER
m........m..m
MAPPING / DRAFTING
.........m..m
ADVANCE PLANNING
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
PUBLIC SERVICE
I�I�1►1�1�/.......�
STATE HIGHWAY DEPARTMENT
►
.........m..m
.........C..m
gc
1�
Rev. 5-07-97 ) C
I 2
n