Loading...
HomeMy WebLinkAboutSPRING CREEK FARMS NORTH - ODP - 24-00A - CORRESPONDENCE - TRAFFIC STUDY (3)Troy Jones - Johnson Farm Page 1 From: Eric Bracke To: Cameron Gloss; Dave Stringer; Kathleen Reavis Date: Mon, Sep 11, 2000 3:21 PM Subject: Johnson Farm At this time. I am not inclined to accept the TIS for the Johnson Farm Project located on the NW corner of Drake and Timberline. In particular, I have asked the applicants traffic engineer to look at the following: 1. the west access lines up with Sagebrush. The intersection was analyzed as a "T" and not a 4-leg intersection. 2. I have requested the turning movements be revised to reflect what we as staff have discussed and re -analyzed. 3. Storage requirements on Timberline and Drake need to be addressed. Eric