Loading...
HomeMy WebLinkAboutSPRING CREEK FARMS NORTH - ODP - 24-00A - CORRESPONDENCE - REVISIONS (8)To: City of Fort Collins, Water & Waste Water Department From: Manhard Consulting Ltd. Date: October 6, 2000 RE: Current Planning Staff Review Comments - 9/20/00 Spring Creek Farms Overall Development Plan - RESPONSE 1. All water and sewer mains will remain in drives. 2. No services will be connected to the 24-inch water main. A main -to -main connection has been planned at Sagebrush. 3. This will be completed as a part of the final design. 4. Plan Comments; a. Sewer is not looped to itself. There is a high dry manhole because one manhole is less expensive for the city to maintain then two manholes 50 feet apart. b. Water and Sanitary will be in drives. c. No services will come from Timberline or Drake. There will be four main line wet - taps for the internal distribution system. The internal distribution system will have all the service taps. d. Mains will be 10' apart. They were drawn conceptually for this plan. e. Cathodic protection, Field locating, test sta., etc will be shown on final plans. f. Sewer has been extended to property line.