HomeMy WebLinkAboutSPRING CREEK FARMS NORTH - ODP - 24-00A - CORRESPONDENCE - (5)e. Extend the potential future pedestrian connection across the railroad tracks
to the multi -modal trail. See current planning redlines.
f. There is no P&Z meeting on January 4, 2000. I will schedule the item for
the next available meeting which is January 18, 2001. Before the hearing,
.you need to arrange with and Eric Bracke and Matt Baker what role you will
have with the Prospect/Timberline improvements as a result of this
project's impact on the intersection.
g. Prior to the Hearing, I will need 10 copies of the ON plans (including any
revisions based on these comments) so they can be distributed to the board.
If you have any questions about these or any other issues related to this project
please feel free to call be at 221-6206.
Y urs truly,
i
�.i
i
Tro Jg es
City Planner
iA
Commu � Planning and Environmental � vices
Current Planning
City of Fort Collins
Liza Mueller
Nuser Kopatz.
1129 Cherokee Street
Denver, CO 80204
STAFF REVIEW COMMENTS
November 16, 2000
Staff has reviewed your submittal the Spring Creek Farms ODP, and we offer the
following comments:
- - COMMENTS:
1. Stormwater, Engineering Transportation Planning, Water/Wastewater,
Forestry, Advance Planning, Poudre Fire Authority, Traffic Operations,
Transfort, :
a. Please see the attached comment sheets and/or redlined plans from these
departments.
2. Current Planning:
a. Section 2.2.11 of the Land Use Code requires that an applicant submit
revisions based on this letter within 90 days or the project application
becomes null and void. A re -submittal addressing these comments is due by
February 14, 2000. A 30 day extension to this deadline is available. All
requests for an extension should be directed to the Current Planning
Director. If remaining issues are those that do not require plan revisions, a
status report verifying continuing efforts toward resolving the issues is
required within the same timeline.
b. I have a meeting scheduled between city staff, the Union Pacific Railroad,
and a representative of the Public Utilities Commission on December 7"' to
discuss the issue of pedestrian underpasses along the Union Pacific Railroad
track between Prospect and the south end of town. Among the topics to be
discussed will be the pedestrian crossing that city staff is requiring you to
make. I will keep you informed of the outcome of this meeting.
c. Please see the attached flyer regarding the design charette planned for
11/29 and 11/30.
d. Please take off reference to the bike lanes along Drake and Timberline. The
bike lanes are part of the ultimate street design for these streets, which
are not really part of this application.
.w.