HomeMy WebLinkAboutSPRING CREEK FARMS NORTH - ODP - 24-00A - CORRESPONDENCE - REVISIONSADDITIONAL RESPONSE TO COMMENTS
Traffic Operations:
The applicant met with Eric Bracke and Matt Baker regarding the planned
improvements of the Timberline/Prospect intersection on December 5th.
Forestry:
The types of trees that exist on site are noted on the O.D.P. drawing. The
applicant will contact the City Forester to evaluate the trees during the P.D.P.
process.
Transfort:
The location and number of new and/or improved bus stops will be determined
at the P.D.P. level. The applicant will contact G. Rossiter with Transfort at that
time.
Transportation Planning:
All comments from this department apply to P.D.P. level issues and these will be
addressed when the applicant reaches that stage in the process.
En ing eering_
All comments have been taken into consideration and/or applied to the revised
O.D.P. drawings (not the Cover Sheet, but the Land Use Map) that accompany
this 2nd re -submittal. Intersection spacing and quality have been noted for both
Drake and Timberline on the revised O.D.P. drawings. Any revised traffic study
information is available through the case planner, Troy Jones. The attached
revised C DP drawings indicate a potential pedestrian crossing of the existing
railroad tracks. The crossing is subject to the approval of the Union Pacific
Railroad and the Public Utilities Commission. General note #2 has been
corrected per comments. The next required level of traffic study is to be
submitted at the P.D.P. level.
Stormwater:
All comments have been taken into consideration and/or applied. Please refer to
the revise report and drawings included in this 2nd re -submittal of the O.D.P.
CK: eom
4
g. Prior to the Hearing, I will need 10 copies of the ODP plans (including any
revisions based on these comments) so they can be distributed to the board.
The requested ten (10) copies of the O.D.P. plans for the Planning and Zoning
meeting on January 181h will be turned in to the case planner by noon on
Monday January 8th in preparation for the P&Z work session on Friday
January 12th.
3
status report verifying continuing efforts toward resolving the issues is
required within the same timeline.
Revisions submitted within 30 business days of receiving Staff Comments.
b. I have a meeting scheduled between city staff, the Union Pacific Railroad,
and a representative of the Public Utilities Commission on December 7rh to
discuss the issue of pedestrian underpasses along the Union Pacific Railroad
track between Prospect and the south end of town. Among the topics to be
discussed will be the pedestrian crossing that city staff is requiring you to
make. I will keep you informed of the outcome of this meeting.
Nuszer Kopatz attended this meeting. As a result, the applicant will begin
addressing the feasibility of pedestrian underpass or overhead crossing and
will meet with UPRR and PUC regarding the application process.
c. Please see the attached flyer regarding the design charette planned for
11/29 and 11/30.
The charette was held The Spring Creek Farms project was not impacted by
the results of the charette.
d. Please take off reference to the bike lanes along Drake and Timberline. The
bike lanes are part of the ultimate street design for these streets, which
are not really part of this application.
All comments have been taken into consideration and/or applied to the
revised O. D. P. dra wings.
e. Extend the potential future pedestrian connection across the railroad tracks
to the multi -modal trail. See current planning redlines.
The attached revised O.D.P. drawings indicate a potential pedestrian crossing
of the existing railroad tracks. The crossing is subject to the approval of the
Union Pacific Railroad and the Public Utilities Commission.
f. There is no P&Z meeting on January 4, 2000. I will schedule the item for
the next available meeting which is January 18, 2001. Before the hearing,
you need to arrange with and Eric Bracke and Matt Baker what role you will
have with the Prospect/Timberline improvements as a result of this
project's impact on the intersection.
The requested meeting was held on December 5th at the City Traffic Office.
The applicants participation and two (2) alternative options were discussed.
Eric Bracke and Matt Baker will make a final determination within the next
two (2) weeks (by approximately December 20, 2000).
2
PLANNING 1 LANDSCAPE ARCHITECTURE 1 D E V t L 0 P M E N T CONSULTING
urban design associates
To: City of Fort Collins, Community Planning and Environmental Services
Staff
From: Nuszer Kopatz
Date: December 20, 2000
RE: Current Planning Staff Review Comments, 2nd Set-11.16.00
Spring Creek Farms Overall Development Plan - RESPONSE
COMMENTS:
1. Stormwater, Engineering, Transportation Planning, Water/Wastewater,
Forestry, Advance Planning, Poudre Fire Authority, Traffic Operations,
Transfort, :
a. Please see the attached comment sheets and/or redlined plans from these
departments.
No comments regarding the Spring Creek Farms O.D.P. were received from the
following: Advanced Planning, PFA, or Water/Wastewater. All other
comments have been taken into consideration and/or applied (please see below).
2. Current Planning:
a. Section 2.2.11 of the Land Use Code requires that an applicant submit
revisions based on this letter within 90 days or the project application
becomes null and void. A re -submittal addressing these comments is due by
February 14, 2000. A 30 day extension to this deadline is available. All
requests for an extension should be directed to the Current Planning
Director. If remaining issues are those that do not require plan revisions, a
1
1129 CHEROKEE STREET T DENVER 1 CO 1 80204 1 303/534-3881 1 FAX 303/534.3884
mainboz@nuszer-kopatz.com