Loading...
HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, THE SHOPS @ RIGDEN FARM - PDP - 56-98R - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTGENERAL LOCATION AND DESCRIPTION LOCATION The Shops at Rigden Farm is located in a part of the northwest quarter of Section 29, TS 7 N, R66W of the 6'h Principal Meridian. This site is more particularly located in the southeast comer of Timberline Road and Drake Road. This site is part of the Overall Development plan for the Rigden Farm O.D.P prepared by JR Engineering dated November, 1999. This overall development plan is part of the "Foothills Basin (Basin G) Master Drainage Plan" by Resource Consultants, Inc. (1981) There is an existing drainage swale through the site within a drainage easement. The easement will be vacated, however, the existing flows from this channel will be hard piped within the proposed storm sewer with The Shops at Rigden Farm development. DESCRIPTION OF PROPERTY The Shops at Rigden Farms is 10.88 acres. The groundcover consists of native weeds and grasses along with cultivated fields. The soil conditions consist of 1-5 feet of man placed fill overlaying 5 to 16 feet of lean clay with sand to lean sandy clay. Groundwater is encountered at approximate depths of 12 to 15 % feet below the ground surface. The site is located within Zone X of FIRM map of Larimer County community —panel number 080101 0193 E. The north portion of the site generally slopes to the southeast to the existing drainage swale. The lower (south) portion of the site drains to the northeast to the same drainage swale. The site is zoned Neighborhood Commercial and the development will be in general compliance with the Ft. Collins design criteria and construction standards. The Shops at Rigden Farm is a proposed commercial development that shall include a King Soopers grocery store along with a variety of retail shops, restaurants and parking. A public stormwater system shall be constructed within the site to service these developments. The surrounding developments are a multi -use development that will include other commercial, single family residential, multi -family, open space, and a community center. There are no onsite detention ponds to collect the onsite runoff. The required detention per the City of Ft. Collins is included as part of the overall drainage plan for the entire Rigden Farm development. The Shops at Rigden Farm will comply with the Overall drainage plan provided by JR Engineering (November, 1999). /MFj Kimley-Horn �;M and Associates, Inc. Vicinity Map (Not To Scale) MULBERRY ST \\ A m i o m m > c cmi < m � ti PROSPECT RD. m m 287 SITE DRAKE RO i ( I `LISTER DR� RIGDEN HORSETOOTH RD 7 FARMS HARMONY DR VIC NfTY MAP POP'111111 Kimley-Horn lkb—.111111 and Associates. Inc. ENGINEER'S CERTIFICATION I hereby attest that this report for the preliminary drainage design of The Shops at Rigden Farm was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Stone Drainage Design Criteria for the responsible parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for drainage facilities designed by others. Carter R. Farley Registered Professional Engineer State of Colorado No. 36252 11111"',MI KiVey-Horn �:M and Associates, Inc. ENGINEER'S CERTIFICATION......................................................................... ... »».»» ..... 1 VICINITY MAP (NOT TO SCALE) ...................... _................................ ............................................ ...... 2 GENERAL LOCATION AND DESCRIPTION.........................................................................................3 LOCATION................................................................................................................................................ 3 DESCRIPTIONOF PROPERTY...............................................................................................................3 DRAINAGEBASINS AND SUB-BASINS..................................................................................................4 MAJORBASIN DESCRIPTION................................................................................................................4 SUB -BASIN DESCRIPTION.....................................................................................................................4 BasinsAl-A4, A OSI, OS2.................................................................................................................. 5 BasinsA5-A9, A OS3, OS4.................................................................................................................. 5 BasinsAll AI4, OS5, OS6.................................................................................................................... 5 DRAINAGE DESIGN CRITERIA ..... ................... ....... ........ ...._...»............................. .......... 5 REGULATIONS......................................................................................................................................... 5 HYDROLOGICALCRITERIA..................................................................................................................5 HYDRAULICCRITERIA..........................................................................................................................6 WAIVER/VARIANCE FROM CRITERIA................................................................................................6 STORMWATER QUALITY CONSIDERATIONS...................................................................................6 WETLAND PRESERVATION AND MITIGATION...........................................................................»...6 CONCLUSIONS..........................................................................................................................................6 COMPLIANCEWITH STANDARDS.......................................................................................................6 DRAINAGECONCEPT.............................................................................................................................7 REFERENCES..............................................................................................................................................8 APPENDIX A — HYDROLOGIC COMPUTATIONS...............................................................................9 IAPPENDIX B — HYDRAULIC COMPUTATIONS................................................................................10 Kirnand Associaey-Horn l � tes, Inc. ■ PRELIMINARY DRAINAGE REPORT The Shops at Rigden Farm Ft. Collins, Colorado Prepared for: Wyatt and Associates, Inc. 1865 South Pearl Street Denver, CO 80210 Prepared by: Kimley-Horn and Associates, Inc. 1515 Arapahoe Street, Tower 1, Suite 500 Denver, CO 80202 067831002 September, 2002 mKimley-Horn and Associates, Inc. ❑�� Kimley-Horn and Associates, Inc.