HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, THE SHOPS @ RIGDEN FARM - PDP - 56-98R - CORRESPONDENCE - (8)building scales to about 254' from north to south, counting the entrance canopy. They've indicated that Retail C is 184'
from north to south, but it scales to about 189' or 190'. If the building permit applciation for Retail C comes in with a
dimension greater than 184', then we won't be able to approve the permit. No envelope dimensions are shown for the
bank or for the future pads, and I still don't see setback distances shown to property lines for the bank or King Soopers,
The previous site plan at least showed the setback distances for the future pads, but even those are missing from the
most recent site plan.
REPEAT COMMENT: They still need to CLEARLY label and dimension the building envelopes and show distance to
lot lines. i.e. what's the buliding envelope and dimensions for King Soopers? They show dimensions of 192' x 317'.
However, putting a scale to the plan, the building is about 255' x 320'. So they need to show, dimension and label the
envelope line for all buildings. In addition, they have responded that distances to lot lines are shown, especially for
Phase 1 buildings. I don't see any such dimensions for those buildings. They do show setback distances for the future
pads to what I assume are lot lines, but they need to label those lines as lot lines.
Original comment: Building envelopes should be clearly labeled and dimensioned on the site plan, and distances from
envelope to lot lines shown.
Number: 6 Created: 10/10/2002
REPEAT, REPEAT COMMENT, 7-31-03: 1 still don't see where the height of the screen wall is indicated.
REPEAT COMMENT: Their letter indicates they've shown the height of the screen wall on the elevation drawings. I
don't see it shown, at least not on sheets 5 of 9 through 7 of 9.
Original comment: Need to indicate the height of the screen wall along Drake.
Number: 243 Created: 7/31 /2003
Their latest "Response to Comments" letter did not address any of Zoning's previous comments. So there's no
narrative to explain what they did in response to the previous comments. Looking at the plans, it appears that they took
care of some of the outstanding issues but not others.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Steve Olt
City Planner
Page 16
Concrete encase all storm sewer joints/lines 10 feet each way at all water main crossings when the storm sewer is
above or within 18-inches vertically of the water mains.
Number: 249 Created: 8/6/2003
See site, landscape and utility plans for other comments.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 2 Created: 10/10/2002
REPEAT, REPEAT COMMENT, 7-31-03: Still don't see the trash detail in the architectural drawings.
REPEAT COMMENT: Their response letter states that the trash detail is provided in the civil engineering drawings.
That's ok, but not sufficient. They MUST provide it in the architectural plans. The zoning department will inspect it for
compliance, not Engineering. Zoning doesn't get copies of the approved civil drawings, so it does no good to have the
detail in those drawings.
Original comment: Need to provide a trash enclosure detail
Number: 3 Created: 10/10/2002
rREPEAT, REPEAT COMMENT, 7-31-03: They've now removed the specific signs from the buildings, with the
exception of the 1st Bank. They have shown dashed boxes on the retail buildings as suggested in my earlier comment,
however they aren't labeled. What are the dashed boxes? I assume they represent sign locations, but they need to
label them as such. The King Soopers elevations show no signs and no dashed boxes, therefore I assume King
Soopers will have no signs. Since this is in the neighborhood sign district, we can only issue sign permits for signs in
locations shown on the approved elevations. Need to remove the specific "1st bank" signs from the elevations.
REPEAT COMMENT: They still show SPECIFIC signage on the elevation drawings. The King Soopers signs are still
too tall and don't comply. Their repsonse letter states that they've eliminated references to specific signage. Since they
still show specific signage, they obviously haven't eliminate references. They should do as suggested in the original
comment - use a dashed box to show the proposed typical location of wall signs.
Original comment: The signs shown on the King Soopers building do not comply with the sign code. This is in the
neighborhood sign district, wherein each tenant is allowed only 1 sign per exterior wall (3.8.7(E)(10)). The "bakery",
"deli", "food", etc signs are all considered to be individual signs. All the signage will need to be "grouped" in order to be
considered 1 sign. Also, the "king coopers" signs are too tall. It is not advised to put specific signs on the elevation
drawings. Rather it is best to just show a generic dashed box whereever they propose signage to be located, and label
them as "sign location, typical". This applies to all the elevation drawings on sheets 5 of 9 through 7 of 9.
Number: 4 Created: 10/10/2002
REPEAT, REPEAT COMMENT, 7-31-03: Assuming that the dashed boxes on the east elevations will be possible sign
locations, they still need_ to add the note regarding lighting as explained below, or ask for a modification.
REPEAT COMMENT: I appreciate their response comment regarding the issue of illumination of signs on the east
walls. However, Section 3.8.7(E)(12) still applies since the NC zone does allow residential uses. They cite Sec.
4.19(D)(1) to explain what MIGHT occur on the east side of Illinois. However, we have no guarantee that is how it
would develop. It's possible that the developer on the east side could ask for a modification to 4.19(D)(1). Therefore,
we have to apply the strict language of 3.8.7(E)(12). That means they need to add a note as explained in my original
comment, or remove the signs from the east walls. If they don't want to add the note or remove the signs, then they'll
need to request a modification to 3.8.7(E)(12).
Original comment: There are a lot of signs proposed on the east elevations of buildings B and C. If the property on the
east side of Illinois is for residential, then signs on the east walls will not be allowed to be illuminated between the hours
of 11:00 pm (or 112 hour after closing, whichever time is later) and 6:00 am. (3.8.7(E)(12)). A note should be added to
the plan to this affect.
Number: 5 Created: 10/10/2002
REPEAT, REPEAT COMMENT, 7-31-03: 1 see that flag note #1 indicates lot lines, but other than that I still don't see
where they've addressed this previous comment. For example, King soopers dimensions still state 192 x 317, but the
Page 15
order to agree on the best possible alignment for the proposed storm lines and inlets. The current configuration is not
acceptable to the City.
Department: Transfort Issue Contact: Garold Smith
Topic: Transportation
Number: 242 Created: 7/28/2003
Future Transit Stop addressed as Detail #49; therefore, no further comments.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 251 Created: 8/8/2003
A bike rack near the entrance of First Bank needs to be added to all plan sets. Also since Retail Bldg. C is proposed to
have a double frontage, a bike rack will also need to be added near the entrances fronting the large parking lot.
Number: 252 Created: 8/8/2003
In order to accommodate new ADA guidelines and the sight impaired, the pedestrian refuge across Drake should have
the truncated domes as detectible warnings placed at the edge of the refuge area and the traffic lane. The warnings are
similar to the truncated domes required for all new access ramps.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility Plans
Number: 98 Created: 10/30/2002
2/3/03 Repeat comment; Maintain 4 feet of separation between meter pits and all permanent structures (i.e. building
envelopes, light poles, trash enclosures, etc.). Meter must be placed in pits outside of buildings. Curb stops and meter
pits are not allowed in sidewalks and drives. The only meter pit and curb stop which will be allowed in a walk will be
that at the King Soopers building. The remaining pad sites should be evaluated for size and location of services at the
time they are developed.
Number: 181 Created: 2/5/2003
As previous indicated, include a note on the SITE PLAN that "Any work required on water and sewer lines which
requires removal of decorative hard surfacing shall be repaired with an asphalt patch and shall be the
owners/developers responsibility to repair decorative surfacing".
Number: 182 Created: 2/6/2003
As previously indicated, more thought needs to be given to the location of the future pad site water and sewer stubs.
When services are stubbed out of the asphalt for future buildings they are very seldom in the right locate or the right
size. It is our suggestion that the future buildings install there own services which will be sized according to the use and
located in the right location. It apears to us that the proposed location for the meter pits for lots 6 and 7 will located in
the sidewalk infront of the buildings.
Number: 244 Created: 8/6/2003
Remove all reference from all plans that water mains are to be constructed with PVC pipe.
Number: 245 Created: 8/6/2003
Include the note to use cathodic protection isolation for the connection of the fire hydrant on the existing 24-inch water
main.
Number: 246 Created: 8/6/2003
Maintain 10 feet of separation between thrust blocks on water lines and all other underground utilities.
Number: 247 Created: 8/6/2003
As previously indicated, raise proposed storm sewers to the extent possible to avoid water main lowerings. Use joint
deflection when possible to avoid fitting lowerings of water mains. Water mains are to maintain 4.5 feet to 5.5 feet
depth of bury. When this is not possible use joint deflection to achieve a maximum of 6.5 feet of bury and use fittings to
lower water mains beyond 6.5 feet.
Number: 248
Created: 8/6/2003
Page 14
Topic: Erosion Control
Number: 149 Created: 11 /1 /2002
Second Review
July 29, 2003
1. There are no page numbers in your report.
2. The calculations need to be for the site being constructed, not the 61h filing.
Please put a note on the plan indicating that all disturbed areas not immediately built
upon (within 30 days), will be seeded and mulched.
4. Please delete the Larimer County Street Standards drainage and erosion control notes.
Replace with the City of Fort Collins standard erosion control notes.
Please put a note on the plan relating to the inlets and how they are to be first straw -
baled, then gravel filtered.
Topic: Grading Plan
Number: 255 Created: 8/12/2003
The grading plan on Limon Drive lacks a lot of detail. It is not clear how the proposed Limon Drive elevations would tie
into the existing grades on the east side of Limon Drive. There are many missing spot elavations on the east side of
the buildings along Limon Drive. Finished Floor elevations for buildings were not called out, rim elevations for
proposed inlets should also be specified.
Topic: Report
Number: 138 Created: 11/1/2002
8/6/03 REPEAT
Drainage report is preliminary in nature. Needs to be signed and stamped. It should have a better -written section that
shows in table format what original assumptions were made for flows from the site and actual flow amounts.
Calculations should include street capacity analysis for Illinois Dr, inlet calcs, hydraulic grade lines for all storm sewers,
2-year and 100-year designs. comment not addressed.
Topic: Storm Lines C and D outlet swale
Number: 210 Created: 2/13/2003
8/6/03 Please show how the Rigden Farm 6th Filing will tie into the Drake Road storm sewer. The design for that
section of storm sewer that was to be done by JR Engineering and built by the overall Rigden Farm developer but was
not submitted with these plans as previously requested.
Topic: Storm sewer profiles
Number: 147 Created: 11 /1 /2002
8/6/03 REPEAT Please add HGL, make sure all pipes have water -tight joints. Provide appropriate details for
encasement whenever needed. Please number manholes and inlets correctly, make sure that the same line is
identified in both plan and profile view place inlets at all sump locations, be consistent between top and horizontal views
in the direction of the pipe profile. Add maintenace notes. Reduce or minimize water line lowerings if possible.
Topic: Utility Conflicts
Number: 256 Created: 8/12/2003
The proposed storm lines along Limon Drive are shown to be under proposed or future sidewalks on the east and west
side of Limon. The alignment chosen for these storm lines and some inlets present a conflict with proposed tree grates
in the pedestrian walkway areas. It is recommeded that a meeting be set up with City Engineering and Stormwater in
Page 13
The drainage basins on the east side of the street do not seem to include the sidewalk area
and rest of the row on the east. This area will also drain to the street and seems it should
be considered part of those basins.
Number: 298 Created: 8/13/2003
Need to label the future pads as `future pad A', 'future pad B' etc on the overall utility plan.
This is necessary to work with the note that is to be placed on the site plan regarding the
need for separate plans for these sites when they come in for review.
Number: 299 Created: 8/13/2003
Sheet R-1 typical x-sections. Need to correctly show the areas of mill and overlay and
reconstruction. Do not identify the pavement design as that will not be known until a final
soils report and pavement design is done after the utility installation and grading work is
completed.
Number: 314
See comments regarding details on the plans.
Department: Light & Power
Topic: General
Number: 241
No comments
Created: 8/18/2003
Issue Contact: Monica Moore
Created: 7/21 /2003
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 250 Created: 8/6/2003
Lighting: The parking lot to the northeast of the KS building needs a minimum of 0.5fc throughout the parking area.
Service Doors: Service doors should have a small viewport to allow employees to surveil exterior without having to exit
building. Also aids employees security when leaving building.
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Building B Expansion
Number: 253 Created: 8/8/2003
The current plans call for Building B to have the potential to be expanded to the north at a later date. As currently
shown this building expansion would infringe,upon the proposed storm line and would not be allowed as shown. Please
either revise the location of the proposed storm sewer or reduce the future building footprint to preserve at least a 10
foot separation from the building to the storm line.
Topic: Easements
Number: 145 Created: 11 /1 /2002
REPEAT 8/6/03
Please provide off -site easements for all storm sewer or drainage swales extensions beyond the property line. A letter
of intent is needed prior to hearing and full easements would be required prior to plan approval. In the case of the
offsite drainage swale on the lot directly to the east of this site which is in an existing drainage easement, a letter from
the property owners would be needed
Page 12
driving area of the street. Multiple pipes, lowering the pipes or other options will need to be
looked at if cover can not be met with the above conditions.
Number: 237 Created: 2/14/2003
Need to include the truncated dome detail for ADA. Use the CDOT or Greeley detail.
8/13/03 This was not provided, but is no longer required for this project.
Number: 291 Created: 8/13/2003
Sheet C5 needs to be labeled as on -site signing and pavement marking plans so there is no
confusion between this sheet and the specific street signing and striping plans. A few things
are shown here that are not shown on the individual street striping plans.
Number: 292 Created: 8/13/2003
Correctly show the limits of the ill and overlays on the appropriate sheets.
Number: 293 Created: 8/13/2003
As was indicated in the fax that was sent to you after the last round of review the patching
limits for the driveway and street cut off of Custer need to be shown to the lane line of the
street with the following note added applying specifically to these two cuts only. Limit of
patching if pavement disturbed.
Number: 294 Created: 8/13/2003
Need to move the storm drain pipe that is under the proposed and future sidewalk across
the street. Where it is being shown to be located the street trees in tree grates can not be
planted. If the pipe is moved into the street area need to make sure that minimum cover is
met.
Number: 295 Created: 8/13/2003
Please keep the manholes out of the sidewalk and crosswalk areas if possible.
Number: 296 Created: 8/13/2003
Need to show how the grading ties into the existing grades to the east of the site.
Number: 297
Created: 8/13/2003
Page 11
Number: 289 Created: 8/13/2003
Vertical curves shown are way too short.
Number: 290 Created: 8/13/2003
We have a concern with the design shown that a hump in Timberline Road will be created
due to the rise of the entrance driveway from the existing elevation due to the relocation of
the low point. A better design maybe to install an area inlet in what was the low spot (a
variance from Engineering would be needed for this). With the driveway grades built
properly so only overflow would go into the site, standards for drainage across a sidewalk
would be meet. We would need to look at what impact the rise you show has once x-
sections have been updated to show the correct mill and overlay tie in line. We will not
allow a bump in this major roadway.
Topic: Utility Plans
Number: 30 Created: 10/29/2002
10/29/02 The typical cross section for Illinois.
Show the sidewalk and tree grate location.
2/4/03 locate the tree grates
8/13/03 Identify the slope range for the different portions of the sidewalks on the typical
sections.
Number: 40 Created: 10/29/2002
10/29/02 Need more elevations and information provided at the access driveways. The access driveways are to be
concrete to the property line built in accordance with detail 7-29B. No more than 500 sq feet of area can drain across
the sidewalk. Need more information to verify that this is being built. 2/13/03 Still have two drives which need more
information. From the elevations provided it is not clear where the drainage goes. Need of know what is to be inflow
and outflow curb and gutter.
8/13/03 The access point off of Custer still has not had high points identified to check this.
Number: 64 Created: 10/29/2002
10/29/02 For all utilities and pipes located under streets a minimum 2 feet of cover below the subgrade is required. See
Section 12.2.2. A few locations do not meet this and when the x-section of Illinois Drive is corrected a few more places
may not meet this requirement. 2/13/03 Still true - a couple of locations do not appear to have minium cover. Also
missing a few stormsewer profiles, thus unable to determine if minimum cover is being provided there.
8/13/03 Still not meeting minimum cover in all locations. Storm line C - Need to identify that
elliptical pipe with tongue and groove fittings is to be used for the section of pipe that runs
under the street. Storm line E - Need to lower the pipe or use elliptical pipe with tongue and
groove fittings. Storm line F - Flatten the slope on this pipe or lower the pipe. Storm line K -
Need to use elliptical pipe with tongue and groove fittings. Storm line M - Need to lower the
pipe or use elliptical pipe with tongue and groove fittings.
If minimum cover can still not be achieved with the use of elliptical pipe with tongue and
groove fittings, 2'/2 foot cover (top of pipe to flowline) will be accepted within the parking
areas with the use of the elliptical pipe and tongue and groove fittings. A variance for this
will need to be submitted for this. Minimum cover still needs to be maintained within the
Page 10
Number: 282 Created: 8/13/2003
Add the following note to the site plan. Future Pads A, B, C, And D are approved with
regards to land use only. Subsequent development of each building will require City
approval of site specific utility plans (prepared by a licensed engineer in the State of
Colorado) for the area surrounding each building currently noted as "Future Pads" on the
Rigden Farm 8th Filing The Shops at Rigden Farm utility plans. Said approval shall be in
conjunction with an associated minor or major amendment (as applicable). Drainage
reports, erosion control deposits, and inspection fees may also be required with the
development of each building.
Number: 283 Created: 8/13/2003
Need to dimension the building envelopes and locate them.
Topic: Timberline Road
Number: 71 Created: 10/29/2002
10/29/02 the right turn transition length and the turn lane length. 2/13/03 This has been done for the interim (needs to
be corrected), but needs to be done also for the ultimate.
8/13/03 Not labeled on either plan now.
Number: 284 Created: 8/13/2003
Need to meet minimum grade requirements several areas are way too flat.
Number: 285 Created: 8/13/2003
Need to meet minimum grade requirements for grades going into an inlet. See Section
7.4.1.B.4.0 regarding the sumps in the flowline.
Number: 286 Created: 8/13/2003
Need to meet minimum arc length requirements for the curve in the right turn lane.
Number: 287 Created: 8/13/2003
Show the correct mill and overlay line - out to the bike lane.
Number: 288 Created: 8/13/2003
Need to show grade across the access point. If inlets remain wherer they are shown it looks
as if it will need to be a vertical curve.
Page 9
Number: 305 Created: 8/18/2003
Need to make sure that the signal poles are not shown being located within the sidewalk
ramps or sidewalk areas. Show the existing sidewalk placement on the southwest corner.
Topic: site/landscape plans
Number: 275 Created: 8/13/2003
Need to show the trees and tree wells on the south portion of Illinois adjacent to future pads
A and B.
Number: 276 Created: 8/13/2003
There are a few conflicts between storm inlets and tree wells - need to meet stormwater
separation requirements.
Number: 277 Created: 8/13/2003
The site and landscape plans differ in what sidewalk and improvements internal to the site
are to be built/ shown - need to be consistent.
Number: 278 Created: 8/13/2003
The king soopers building is currently shown encroaching into easements on the north, east,
and south sides. No portion of a building including the footings or overhangs can be within
an easement. The bank is not shown in an easement, but is abutting it - need to make sure
that it meets these requirements.
Number: 279 Created: 8/13/2003
The x'd out area north of retail B - what does this represent? It is not labeled. Entire x'd out
area can not be a future building as an easement runs under a portion of it.
Number: 280 Created: 8/13/2003
Need to make sure it is clear that the sidewalk is to be built all along the west side of Illinois.
This sidewalk is needed to meet pedestrian levels of service and provide connection to
existing neighborhood. It was not shown shaded on the site plans as the rest of the walk
that appears intended to be put in.
Number: 281 Created: 8/13/2003
Do not show easements that are being vacated with this project on the site plan - it will only
confuse things especially when one of the easement lines runs through the building.
Page 8
Number: 273 Created: 8/13/2003
Where there are inlets at the corner of the parking stall they need to be radii.
Number: 274 Created: 8/13/2003
Additional comments will be made once a revised design of Illinois is received.
Topic: Plat
Number: 217 Created: 2/13/2003
Correct the certification of dedication statement, repair guarantee statement, notice of other documents statement, and
the approved form by the City Engineer statement and signature line.
8/13/03 minor correction still needed on the City Engineer statement.
Number: 222 Created: 2/13/2003
Need to show the separation between the different types of easements. Or can make it easier and just call them utility
and/or drainage easements as appropriate.
8/13/03 Needs some more work.
Topic: signing and striping plans
Number: 300 Created: 8/13/2003
These plans will need to be reviewed by Traffic Operations with the next round of review. I
know you are missing signs and information, but it them who decides what is needed.
Number: 301 Created: 8/13/2003
Need to label the taper and storage lengths for the turn lanes.
Number: 302 Created: 8/18/2003
Need to identify through lane taper lengths and ratios.
Number: 303 Created: 8/18/2003
Show propsed edge of pavement and taper length that is needed on Drake to tie into
existing pavement. The bike lane width needs to remain.
Number: 304 Created: 8/18/2003
Missing part of Illinois Street.
Page 7
Number: 53 Created: 10/29/2002
10/29/02 Will need to figure out if the directional ramp at the intersection of Illinois Drive and Custer Drive will work with
the existing inlet location. May need a detail to show that this will work and how it will fit. 2/13/03 Response was it will
work, but the ramp is not shown. Still need to see how this works.
8/13/03 Ramp is shown, but do not show the limits of the inlet and what the spacing is
between the edge of the ramp - need to have enough room for the curb transition.
Number: 199 Created: 2/13/2003
Need to define the station points along the flowline where the curves are. Need to be able to relate the profiles to the
plan view.
8/13/03 still applicable
Number: 200 Created: 2/13/2003
Max grade change (except at an inlet) is .40%. Grade change at an inlet would be 1 % (.5% going into the inlet on both
sides).
8/13/03 As per correspondence that was sent to you between reviews, the City has
identified several areas where design can differ from the standards if proper justification and
variance requests are submitted. As indicated in that memo - the City will agree to and
require the use of a quarter crown on this project. The center portion of the roadway will
need to have a consistent 2% cross slope the parking area beyond can have a varying slope
within the 2-3% range. For the flowline slopes within the parking areas (inset areas)
variance requests for the use of .40% minimum flowline grade and for point grade breaks of
up to 1.2% will be accepted. Variance requests for the two above mentioned items would
need to be submitted, but as indicated they would be approved. The use of grade breaks at
the small curb returns for the inset parking is encouraged. In accordance with the standards
grade breaks here can be up to 3% but due to the fact that this area would not be driven on
(within the parking area) we could accept slightly larger grade breaks that that if needed.
We are okay with the sidewalk outside of the clear walkway ranging from 1.0 to 6.0% and
the sidewalk within the clear walkway area can range from 1.0 to 2.0%.
Number: 202 Created: 2/13/2003
If it makes sense and does not affect the ride of the road greater grade changes going into the parking areas will be
allowed. Additional information needs to be provided on the plans to determine how the plan and profile correspond
and weather the changes shown are acceptable. 8/13/03 still true.
Number: 204 Created: 2/13/2003
Need to identify the true lengths of those areas that are not parallel to the centerline.
8/13/03 Believe it is identified, but need more complete plans to verify.
Number: 272 Created: 8/13/2003
Provide station and elevation of all horizontal curves including PI's, PC's, PT's, etc; high or
low points and PI of all vertical curves (per 3.3.4.A.9) station and elevations of all curb
returns, midpoint elevations and additional locations as necessary (3.3.4.A.10)
Page 6
10/29/02 See the plans for additional comments. 2/13/03 Still applicable. 8/13/03 Still applicable.
Number: 231 Created: 2/13/2003
Need to see what the screen wall/fence looks like and what material it is made of. It will need to be designed so that
the utilities located under it or going under it can be accessed without the wall falling down or that those sections of
fence can be removed during utility work. Several of the posts are sitting directly on or very dose to a utility.
8/13/03 haven't seen this yet - 1 don't normally get the archetetural plans if this is where the
detail is at. Normally fences and walls details are provided on the landscape plans
Number: 271 Created: 8/13/2003
Text size, placement and plans in general need to meet standards - see appendix E for
minimum requirements.
Topic: Illinois Drive
Number: 44 Created: 10/29/2002
10/29/02 Provide curb return profile information. 2/13/03 Curb returns need to meet minimum grades and standards for
grade changes.
8/13/03 need adjustment to these on both ends of Illinois to facilitate proper drainage.
Limon street curb return info not yet provided.
Number: 45 Created: 10/29/2002
10/29/02 Provide elevations at the intersections in accordance with standards. Provide on plan view or provide
separate intersection details. 2/13/03 repeat
8/13/03 See comments on the details. Additional information and/or adjustments to grades
are needed.
Number: 46 Created: 10/29/2002
10/29/02 Use 30 mph design speed for this road. 2/13/03 still applicable. 8/13/03 still applicable
Number: 48 Created: 10/29/2002
10/29/02 Identify inlet size and location in the profiles. 2/13/03 Repeat - Have several low points that do not have inlets
shown at them. Need to provide inlets at low spots or adjust grades so that low spots are at the inlets. Can not have
an inlet located within a curb return or where a ramp is located.
8/13/03 Need to identify the inlet size and locations in the profiles.
Number: 52 Created: 10/29/2002
10/29/02 Need to show how the drainage is going to work along the flowline of this street. The curb line defining the
parking needs to be designed similar to how the curbs are built in downtown. 2/13/03 the drainage has not been
shown to work along the street yet.
8/13/03 Awaiting the resubmittal of this sheet - current sheet submitted with set has many
areas where in grades are not being met.
Page 5
Topic: drake road ultimate
Number: 265 Created: 8/13/2003
Don't need most of the information shown on the first sheet as it will be existing.
Number: 266 Created: 8/13/2003
Stations on the flowline profile do not match those indicated on the plan view.
Number: 267 Created: 8/13/2003
Need to identify what station the end of the existing curb on both sides is equal to in the JR
Eng plans.
Number: 268 Created: 8/13/2003
Don't show saw cut lines the entire roadway will be reconstructed from sta 18+00 to th3e
east excepot for the median curb and gutter and the north flowline curb.
Number: 269 Created: 8/13/2003
Need to meet minimum grade requirements.
Number: 270 Created: 8/13/2003
Need a radius where the tie into existing design - can't tie in with an angle point
Topic: General
Number: 19 Created: 10/29/2002
10/29/02 Variance requests are to be from a licensed Engineer. The letter(s) need to include all the information
required in section 1.9.2 including a justification. 2/13/03 Still applicable. 8/13/03 Still applicable
Number: 20 Created: 10/29/2002
10/29/02 A letter of intent for off -site easements and/or row needs to be from and signed by the person(s) dedicating
the easement/ row. Easements are needed for any area outside of the plated boundary or dedicated row where work is
to be done with the project. Will need row for the left turn lane on Drake from the property on the north side of Drake
Road. It also appears that easements will be needed from the property to the east. 2/4/03 repeat 8/13/03 still
applies
Number: 24 Created: 10/29/2002
10/29/02 Provide information as required in the Appendix E-4 returned to the applicant. 2/13/03 Still applicable
Number: 25
Created: 10/29/2002
Page 4
Need to properly show the area to be overlayed - as was faxed to you previously. The 1 ft
saw cuts shown are not allowed as the streets are newly built full mill and overlay is
required. This applies to all the streets.
Number: 259 Created: 8/13/2003
Flowline design needs to meet minimum grades (a variance request for the use of .40%
maybe accepted here.)
Number: 260 Created: 8/13/2003
Need to identify the limits of the ultimate improvements and temporary pavement
improvements. This limit is the same station as was identified in the prior plans, it is the end
of the curb and gutter built on the south side of the street. The area to the east of this is not
an acceptable roadway base or x-slopes to be built on or tied into for ultimate design. This
project will need to mill and overlay this area to be able to add the pavement needed on the
north and tie it in with acceptable x-slopes. Ideally this work will not need to be done if
Rigden 61h is constructing the ultimate improvements at the same time that you are.
Number: 261 Created: 8/13/2003
Need to show the grading that is needed for this left turn lane work and to tie into existing
grades on the North. May still need the roadside ditch if it is still being used for irrigation.
Nothing so far has been shown.
Number: 262 Created: 8/13/2003
Need to make sure that the left turn lane design accomidates at least a wb-60 and a b-40
vehicle (per chapter 8) plus any larger vehicle that you might anticipate using this access. I
put a turning template on it and it appears to need some modifications. Show me that it
works with a work sheet or provide me with a CADD file so that I can use autoturn on it.
Number: 263 Created: 8/13/2003
Need to provide a pavement taper at the end of the new curb and gutter and provide a
design for it (edge of pavement). Needs to tie in keeping the bikelane shoulder width.
Number: 264 Created: 8/13/2003
Need to provide details of all the median that is being installed. Identify the crown line, what
is inflow curb and gutter, and elevations in the ped refuge (see detail for design req). The
noses of the edians need to be designed in accordance with detail #801.
Page 3
Number: 311 Created: 8/18/2003
Timberline cross sections - The sidewalk that you are reconstructing needs to slope toward
the street, including the parkway area. Place the sidewalk at an elevation that the parkway
slope ends up being between the minimum and maximum range for both the interim and
ultimate design. A bermed parkway as you are showing it will not work, it will trap water
against the sidewalk and cause drainage problems.
Number: 312 Created: 8/18/2003
Timberline cross sections - Need to label the existing slope on each section and the
proposed slope of the mill and overlay/ new section. Tie into existing section needs to be
done at a lane line and the slope of the portion being reconstructed needs to be greater than
or equal to the existing slope.
Number: 313 Created: 8/18/2003
Once slopes and information are identified on the cross sections they can be checked to
determine if the street designs for slope and construction meet standards.
Topic: Drake Road
Number: 75 Created: 10/29/2002
10/29/03 Identify the additional row that is needed on the property north of Drake Road to accommodate the additional
width needed to provide the left turn lane with the ultimate design. 2/4/03 repeat the row needs to be identified and
obtained. Will need a letter of intent prior to being scheduled for a hearing.
8/13/03 Need letter of intent for the row and slope, utility and drainage easement that is
needed on the North.
Number: 76 Created: 10/29/2002
10/29/02 Need to provide flowline and median profiles and information, Curve data, cross sections and striping plans for
the interim design and ultimate design for Drake Road. 2/4/03 repeat
8/13/03 Have provided information other than the median profiles. Will need to provide
median profiles or provide enough spot elevations to ensure that the median is placed at the
proper grade to achieve standard x-slopes. Can that be done with just grade breaks and no
vertical curves. See later comments on design info provided.
Number: 257 Created: 8/13/2003
Are you planning on building the sidewalk on the N. side of Drake? The City does not want
you to do this as the sidewalk will likely have to be removed when the N. side is developed
for the utility installations. Make sure the plans clearly show what you are doing.
Number: 258
Created: 8/13/2003
Page 2
6aSTAFF PROJECT REVIEW
citvof Fort Collins
WYATT & ASSOC. Date: 8/19/2003
DENNIS WYATT p� dtz
1865 S. PEARL ST. l014 ,,�,� ��,(1
DENVER, CO 802107G' (.aOJt a�"""�'
(WIPiw•
Staff has reviewed your submittal for RIGDEN FARM 8TH FILING, THE SHOPS @
RIGDEN FARM, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: cross sections
Number: 306 Created: 8/18/2003
See 3.3.4.D for all information that is to be provided on cross sections. Use a key and
different symbol/ fill to identify which areas are to be mill and overlay and which areas are to
be new construction.
Number: 307 Created: 8/18/2003
Need to show how the grades will tie into existing grades on the north side of drake and
what the proposed slope is.
Number: 308 Created: 8/18/2003
The area beyond 18+00 (east) on Drake Road for the interim will need to be a full overlay in
order to tie the new pavement into the existing pavement and meet x-slope grade
requirements. None of the pavement in this area will be a part of the ultimate pavement
section. Existing Drake Road east of where curb and gutter exist now will need to be fully
reconstructed with the ultimate improvements. So an overlay is adequate to tie the curb and
gutter in on an interim basis, but in the area beyond 18+00 the pavement will be fully
removed and the base constructed to meet standards when this area is built to ultimate
conditions.
Number: 309 Created: 8/18/2003
Need to note on the Drake interim improvements x-sections that stations 11+00 to 18+00
are ultimate improvements and that x-sections for 18+00 and above are interim
improvements. For the Drake Road ultimate x-sections only need to show x-sections
starting at 18+00.
Number: 310 Created: 8/18/2003
Need to note on the plans that the sections are based on centerline stationing.
Page 1