Loading...
HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, THE SHOPS @ RIGDEN FARM - PDP - 56-98R - CORRESPONDENCE - REVISIONS (5)be granted and the project can be placed on the agenda for a Planning and Zoning hearing scheduled for early next month. Please inform us of your progress of the review of the enclosed plans so we can start to plan for the next stages of development of the project. We are currently in the process of updating the Final Development Plan and Final Plat drawings to reflect the changes stated above and corrected drawings will be submitted to the city upon their completion. Thank you for your time and consideration in evaluating the enclosed documents. We anxiously await your comments and the chance to advance the project to the next level of review and final compliance stages towards approval. Cordially, CL J ' er Gr Wyatt & Associates, P.C. WYATT &ASSOCIATES, P.C. X A ARCHITECTS & PLANNERS 1865 s. pearl st., denver, colorado 80210 ph. (303) 698-1717 fax (303) 778-6004 August 14, 2003 Steve Olt, Planner Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80524 Re: #56-98R Rigden Farm, 86 Filing, Shops at Rigden Farm PDP (Type H, LUC) Dear Steve, We have made the necessary changes requested by the planning department and the engineering department on the current site plans that I have enclosed for your review and approval. The changes made are as follows: 1. Utility easements that came into contact with buildings and/or building envelopes have been corrected. In particular, the storm sewer line and easement to the north of the King Soopers has been modified to clear all building elements, site walls, and building mechanical and electrical equipment. Also, the confect with this storm sewer easement and the proposed building envelope of the future building to the north of retail B has been resolved. The east -west utility easement directly to the south of the King Soopers has been shifted to avoid conflicts with the building columns and the columns of the drive -dim pharmacy canopy. 2. The 1stBank building (Lot 8) has been relocated directly east 4.2 feet to avoid the encroaching electrical utility easement to the west of the building. 3. A note has been added to the architectural site plan, Sheet No. 2 of 11, stating that a temporary concrete sidewalk shall be constructed along the southwest portion of Illinois Drive at the time of building construction. Future tree grate locations have been shown as light lines on the plan. After development and construction of future pads A & B, street trees and tree grates will be added to match existing conditions along the west side of Illinois Drive. It is necessary to suspend the installation of street trees in this particular undeveloped area along Illinois because the future building construction phase of pads A & B would require their removal for access to the site. 4. The overhang of the decorative steel canopies on the west elevation of the King Soopers has been adjusted as to not project into the nearby right-of-way. It is to our understanding that upon the review and recognition of changes made above on the architectural site plan enclosed, a conditional approval or acceptance of the project will