HomeMy WebLinkAboutRIGDEN FARM, 8TH FILING, THE SHOPS @ RIGDEN FARM - PDP - 56-98R - CORRESPONDENCE - REVISIONS (5)be granted and the project can be placed on the agenda for a Planning and Zoning hearing
scheduled for early next month. Please inform us of your progress of the review of the
enclosed plans so we can start to plan for the next stages of development of the project. We
are currently in the process of updating the Final Development Plan and Final Plat drawings
to reflect the changes stated above and corrected drawings will be submitted to the city upon
their completion.
Thank you for your time and consideration in evaluating the enclosed documents. We
anxiously await your comments and the chance to advance the project to the next level of
review and final compliance stages towards approval.
Cordially,
CL
J ' er Gr
Wyatt & Associates, P.C.
WYATT &ASSOCIATES, P.C. X A ARCHITECTS & PLANNERS
1865 s. pearl st., denver, colorado 80210 ph. (303) 698-1717 fax (303) 778-6004
August 14, 2003
Steve Olt, Planner
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
Re: #56-98R Rigden Farm, 86 Filing, Shops at Rigden Farm PDP (Type H, LUC)
Dear Steve,
We have made the necessary changes requested by the planning department and the
engineering department on the current site plans that I have enclosed for your review and
approval. The changes made are as follows:
1. Utility easements that came into contact with buildings and/or building envelopes
have been corrected. In particular, the storm sewer line and easement to the north of
the King Soopers has been modified to clear all building elements, site walls, and
building mechanical and electrical equipment. Also, the confect with this storm
sewer easement and the proposed building envelope of the future building to the
north of retail B has been resolved. The east -west utility easement directly to the
south of the King Soopers has been shifted to avoid conflicts with the building
columns and the columns of the drive -dim pharmacy canopy.
2. The 1stBank building (Lot 8) has been relocated directly east 4.2 feet to avoid the
encroaching electrical utility easement to the west of the building.
3. A note has been added to the architectural site plan, Sheet No. 2 of 11, stating that a
temporary concrete sidewalk shall be constructed along the southwest portion of
Illinois Drive at the time of building construction. Future tree grate locations have
been shown as light lines on the plan. After development and construction of future
pads A & B, street trees and tree grates will be added to match existing conditions
along the west side of Illinois Drive. It is necessary to suspend the installation of
street trees in this particular undeveloped area along Illinois because the future
building construction phase of pads A & B would require their removal for access to
the site.
4. The overhang of the decorative steel canopies on the west elevation of the King
Soopers has been adjusted as to not project into the nearby right-of-way.
It is to our understanding that upon the review and recognition of changes made above on
the architectural site plan enclosed, a conditional approval or acceptance of the project will