HomeMy WebLinkAboutPETERSON PLACE (611 S. PETERSON) - PDP - 35-00 - CORRESPONDENCE - REVISIONS15. Current Planning Department
Steve Oh
Staff comments and concerns red -lined on the drawings have been carefully
reviewed and are addressed or clarified as indicated in the recent submittal.
The comments and concerns expressed at the weekly Staff Review Meeting on March 21,
2001:
En 'ni er
16. Detail of both upstream and downstream water flow under the access point at
Street and the alley are shown on the construction drawing details.
17. Street patching for Peterson Street is shown on the construction/engineering
Transportation Planning/Mark Jackson
18. Bicycle parking is shown as on previous site plan, and can be included in newly
Proposed garages as well.
19. It was determined by Mark Jackson that the walkway need not extend to the west
Side of the site
Natural Resources/Doug Moore
20. Recycling is included in the design.
Stormwater (Basil Hamdan)
21. The comments are addressed in the revised drainage report.
22. See drainage report
23. This project is submitted for another round of review as requested by staff.
All drawings red -lined by City staff with submissions of the revisions are hereby
respectfully submitted.
Landscape Plan the sanitary sewer has been moved to avoid any conflicts.
d. The comment/concern is noted, discussions with Jeff Hill indicated that
the sidewalk is workable and not perceived as a problem as shown.
e. The meter pit detail is provided in the utility detail sheets.
7. Natural Resources Department
Doug Moore
a. The trash enclosure will accommodate recycling receptacles in addition to
the enclosed garages which may be used for some recycling storage prior
to pick-up, if needed.
8. City Forester: no comments or concerns
9. Post Office: no comments or concerns
10. Public Service Company of Colorado: The building will be electric heat, zone
controlled with attention to energy conserving measures in construction details.
11. Transfort: no comments or concerns
12. Transportation Planning
Mark Jackson
a. A bicycle parking rack is shown on the site and landscape plan, garages
May also be used for bicycle storage.
b. Bruce and Susan Froseth met with Mark Jackson on April 26, 2001 at 1:00
p.m. He approved the existing walk as shown on the plans per the prior
submittal due to parking requirements and existing parking shown.
13. Technical Services Department
Jim Hoff
a. The title of the subdivision plat will change per J.R. Wilson as Mr. Wilson
cannot assign an address until the subdivision takes place. The project will
be entitled Peterson Place at this time.
14. Traffic Operations Department
Ward Stanford
a. A meeting with Ward Stanford was cancelled after a telephone discussion
Was held on April 17, 2001. Mr. Standford visited the site and perceived
no outstanding issues related to the previous comments. An access
easement is provided and noted for parking adjacent to Peterson Street.
and verified and revisions made, at the time of installation. The proposed
building is proposed with fire sprinklers. The building will be sprinklered
based upon PFA specifications.
4. Zoning Department:
Gary Lopez
One honeylocust has been added along the alley and the existing honeylocust
On the south property line has been moved to the east to accommodate the
additional tree as requested by Gary Lopez.
5. Engineering Department
Dave Stringer
a. Stormwater review specific comments were received after the April 6,
2001 staff comments. The items of concern are addressed in the
engineering drawings and the drainage report.
b. 2 survey control points are shown in the detail sheets of the engineering
drawings.
c. The detail of the pan aligning with the 6" outlet pipe at curb is shown
On the engineering drawings.
d. A detail of the estimated street repair limits at the driveway reconstruction
As required by the City Repair Standards dated October, 1998 is shown on
the engineering drawings.
e. In response to the comment concerning the address of the new dwelling
Units: Speaking with J.R. Wilson on 6-18-01 at 11:20 am, he stated that
if the lot is subdivided (as required by the City of Fort Collins in this
case), the project will be assigned an address after the subdivision takes
place and cannot be assigned at this point. Therefore, the project will
called: Peterson Place, and be assigned a new address at the appropriate
time.
6. Water/Wastewater Department
Jeff Hill
a. The approximate location of the existing water and sewer services for the
lot adjacent to Peterson Street has been located and is shown on the utility
plan.
b. The standard general note pertaining to shrub separation is shown on the
Landscape Plan and adjustments have been noted on the landscape plan.
c. Required landscape/utility separation distances are noted on the
RREUL [R0SEiR AR(NIIE(iS
June 18, 2001
Steve Olt
Project Planner for the City of Fort Collins
Community Planning and Environmental Services
P.O Box 580
Fort Collins, Co. 80522-0580
Dear Steve,
This document is for the purpose of addressing the staff revisions documented for the 611
Peterson Street (re: Peterson Place), proposed project Development Plan (PDP)- #35-
00 which was submitted based upon staff comments for the earlier revisions. This
response is to the round of comments based upon the February 28, 2001 revisions and
submittal. The staff comments were dated April 6, 2001
1. This property and development request is located at 611 Peterson Street. The lot
fronts on Peterson Street, with an alley along the rear property line. There is an
Existing single family structure on the front of the lot. The property is in the
NCM Neighborhood Conservation, Medium Density Zoning District in the City
Of Fort Collins Land Use Code (LUC). The proposed project is a 3-plex, (garage
with studio above and (2) two -bedroom unit -multi -family building.) Multi -family
residential use is permitted in this District, subject to a Planning and Zoning
Board (Type II) review and public hearing for a decision.
2. AT&T Broadband (CABLE TV) no comments or concerns
3. Poudre Fire Authority:
Michael Chavez
a. Address numerals shown on the plan and detail elevation are located on a
kiosk as requested in earlier comments. The 10" numerals will be placed
on a contrasting background, as in light colored letters on a darker tone
background. Note: this is a change from the comment by we received on
the comments dated November 22, 2000, under 5. a. In this set of
comments, it stated: " Address numerals shall be visible from the street
fronting the property and posted with a minimum of 6" numerals..."
While the change to 10" numerals is noted on the plans, we think that the
6" numerals are more in keeping with the residential multifamily and
single family neighbors and request that this be a consideration due to the
kiosk. The location of the kiosk is shown on the plans. Bruce Froseth
spoke with Mike Chavez and the location of the kiosk will be discussed
1630 South College Avenue / Fort Collins, Colorado 80525 / Phone: 970.224.1840 1 Fax 970.229-9769 / Email, mail®kreullrosetharchitecls.cam / www.kreultrosetharchitects.com