Number: 213 Created: 2/13/2003
Please maintain at least 5' clear between the line from inlet D-2 to the proposed water meter pit.
Topic: Landscape Plan
Number: 215 Created: 2/13/2003
Please show in shadow line weight the proposed storm sewer alignments on the landscape plan in
order to check for and avoid potential conflict(s) between proposed storm sewers and proposed
landscaping.
Topic: Plat
Number: 216 Created: 2/13/2003
Please rename al instances of 1 "Storm Easement" to "Drainage Easement"
Topic: Report
Number: 138 Created: l l/l/2002
Drainage report is preliminary in nature. Needs to be signed and stamped. It should have a better -
written section that shows in table format what original assumptions were made for flows from the
site and actual flow amounts. Calculations should include street capacity analysis for Illinois Dr, inlet
talcs, hydraulic grade lines for all storm sewers, 2-year and 100-year designs. comment not
addressed.
Topic: Storm Lines C and D outlet swale
Number: 210 Created: 2/13/2003
Please discuss how the Rigden Farm 6th Filing plans need to be modified in order to tie in to the
proposed Drake Road storm sewer. Need to contact Rigden Farm overall developer to coordinate
these changes.
Topic: Storm sewer profiles
Number: 147 Created: l l/l/2002
Please add HGL, make sure all pipes have water -tight joints. Provide appropriate details for
encasement whenever needed. Please number manholes and inlets correctly, make sure that the same
line is identified in both plan and profile view place inlets at all sump locations, be consistent with
horizontal scale in pipe profile.
Topic: Subdrain
Number: 142 Created: l l / 1 /2002
Existing subdrain on site is not shown or identified, it will cause many conflicts with proposed
development and cannot be ignored. These plans do not show or address that subdrain.
Plans should identify location of subdrain and call for its removal explicitly.
Topic: Timberline Road Flowline Profile
Number: 212 Created: 2/13/2003
Please provide a revised flowline profile for Timberline Road in the area that is being modified, show
proposed inlet locations.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 169 Created: 2/5/2003
Page 11
o
Number: 99 Created: 10/30/2002
2/3/03 Repeat comment; Show and label all existing water and sewer stubs. Clearly define if they are
to be used or abandoned. If they are to be abandoned they must be abandoned at the main. Water and
sewer main stubs may not be used for services.
Number: 181
Created: 2/5/2003
Include a note on the site plan that "Any work required on water and sewer lines which requires
removal of decorative hard surfacing shall be repaired with an asphalt patch and shall be the
owners/developers responsibility to repair decorative surfacing".
Number: 182 Created: 2/6/2003
Water services must be perpendicular to the main from the main to a point 5 feet downstream of the
meter pit. More thought needs to be given to the location of the future pad site water and sewer stubs.
When services are stubbed out of the asphalt for future buildings they are very seldom in the right
locate or the right size. It is our suggestion that the future buildings install there own services which
will be sized according to the use and located in the right location.
Number: 183 Created: 2/6/2003
Provide all information necessary for the construction of the water main lowering (i.e. invert of utility
being crossed, elevation of lowered section, 5 feet clear separation between 45 degree fittings and
utility being crossed, etc.).
Number: 185
Created: 2/10/2003
Extend sanitary sewer mains in drives to minimize the extreme lengths of services and to eliminate
multiple clean outs.
Number: 186 Created: 2/ 10/2003
See site, landscape and utility plans for other comments.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project, please feel
free to call me at (970) 221-6750.
Yours Truly,
Steve Olt
City Planner
Page 14
Number: 170 Created: 2/5/2003
To enhance the pedestrian circulation between buildings please provide a walkway connection from
Lot 7 Future Pad D to First Bank. The walk can be designed to go through the horseshoe shaped
landscaped / parking island.
Number: 171 Created: 2/5/2003
Design and show directional ramps at the Illinois / Custer intersection per LCUASS. Crosswalks
should not be located in the drainage pan.
Number: 172 Created: 2/5/2003
Provide ramp and sidewalk connection to the north bound crosswalk at Illinois and Drake Rd. The
sidewalk, ramp and pedestrian refuge should directly align with the Illinois sidewalk, but still be
aligned with the proposed street intersection with the Side Hill project to the north. Some
coordination with the development to the north may be required.
Number: 173 Created: 2/5/2003
Please relocate the trash enclosure from the drive aisle adjacent to the north side of future Pad A and
relocate to the parking lot. This will eliminate any potential vehicle conflicts between trash haulers
and personal vehicles. But be sure not to create sight distance issues for pedestrians or vehicles.
Number: 175 Created: 2/5/2003
Relocate the bike rack for Bldg. C near the store entrances on Illinois Dr.
Number: 176 Created: 2/5/2003
Is the ATM shown on the site plan handicap accessible? It appears from the site plan that a column
may be located in the center of the walk,? or will there be a walk-up ATM accessible near the bank's
entrance. If so it should be operable during the same hours as the proposed drive -up ATM.
Number: 178 Created: 2/5/2003
The proposed locations of the tree grates and lighting fixtures on the plan sets severely constrain
pedestrian movement along Illinois Dr. The tree grates should be placed one foot from the edge of the
curb, then the four foot tree grate, which allows for the remaining 7 feet to be used for pedestrian
circulation. This minimum 7 foot clear space is desirable for activity centers and required for
downtown.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: landscape
Number: 97 Created: 10/29/2002
2/3/03 Repeat Comment; Maintain 10 feet of separation between water/sewer lines and all trees.
Topic: Utility Plans
Number: 98 Created: 10/30/2002
2/3/03 Repeat comment; Show and label all curb stops and meter pits. Draw meter pits to scale.
Maintain 4 feet of separation between meter pits and all permanent structures (I.e. building envelopes,
light poles, trash enclosures, etc.). Meter must be placed in pits outside of buildings. Curb stops
must be with 2 feet of meter pits and also within utility easements.
Page 13
There are inconsistencies between the landscape, site plan and the utility plan set, please correct. For
example, the bike rack for Bldg. B is shown on the site plan, but not on the Utility plans or Landscape
plans Also please include the crosswalk and pedestrian refuge at the Drake and Illinois intersection
on the landscape plans.
Number: 179
Created: 2/5/2003
What is the intent of the open area between Future Pads A & B? Is it a future plaza area? Please
identify on the plan sets.
Topic: Timberline Road
Number: 174
Created: 2/5/2003
The bike lanes on Timberline Road need to maintain a 6 foot width when located between travel lanes
and an 8 foot width when located adjacent to the curb. Bike lane striping should be continuous
crossing the drive aisle entrance.
Topic: Transportation
Number: 102
Created: 10/30/2002
Follow-up: Please provide more detailed signage and striping plans for Timberline, Drake, Illinois
and Custer. Plan sheets should include turn arrows, proper signage locations, bike lane stencils and
sign locations, etc... (2-5-02). Provide a signing and striping plan for all surrounding streets of the
proposed development (Timberline, Drake, Illinois, & Custer).
Number: 117
Created: 10/30/2002
Follow-up: Please provide a copy of the photometric analysis with the next submittal (2-5-02).
Increase the lighting levels at the Illinois and Drake intersection for pedestrian visibility, security, and
safety.
Number: 118 Created: 10/30/2002
Follow up: Please provide details of the lighting fixtures proposed along Illinois Drive. Are these
pedestrian in scale and design? Additional light fixtures may be required with the review of the
photometric analysis (2-5-02). Include amenities that promote, enhance safety, and convenience for
alternative modes and accomplishes the required Level of Service (LOS) for pedestrians, transit users
or bikes. The TIS is lacking any discussion on how LOS B for Visual Interests and Amenities is
achieved, especially along Illinois. Please provide further information on these amenities that will be
provided. Also please include a more detailed set of plans for Illinois Drive that illustrates these
improvements.
Number: 121
Created: 10/30/2002
Follow-up: To clarify the first round comment, a 6' walk is required along the east side of Lot 6
Future Pad C and the drive aisle entering the site from Custer. Also a 6' walk along the west side of
Lot 7 Future Pad D that connects to the Custer sidewalk is needed. It is unclear from the plan sets.
The future sidewalks for Future Pads A & B are shown, but future sidewalk locations are lacking for
Pads C & D. Construct a 6 foot walk (minimum) along the southern edge of the drive aisle off of
Custer and along the northern edge of Lot 6..
Number: 135
Created: 10/31 /2002
Follow-up: At the November 25, 2002 meeting pedestrian improvements were discussed for internal
circulation, however, these improvements are not reflected (2-5-02). The parking lot layout needs to
address points of conflict and the interrelation of pedestrian, vehicle, and bike circulation in order to
provide continuous direct pedestrian access with a minimum of drive -aisle crossings. ([LUC 3.2.2
(E.5)]
Page 12
Number: 164 Created: 1/28/2003
Lot 8 needs to have the utility easement extended from the proposed transformer location toward
Timberline Road. In addition, the electric line should continue from the transformer to a vault that
will be added along Timberline Road.
Number: 165 Created: 1/28/2003
Show the electric line along Illinois Drive behind the curb and gas at least 5-feet back of electric.
Number: 166 Created: 1/28/2003
If this project is to be phased, lots must be built sequentially to ensure that electric facilities can be
installed through the site.
Number: 167 Created: 1/28/2003
The landscape plan shows a street tree being installed at the intersection of Drake Road and
Timberline Road which does not maintain minimum clearances to the existing streetlight.
Show all existing streetlights on the utility plan and landscape plan.
Department: Police
Topic: General
Number: 180
No updated photometric information.
Issue Contact: Joseph Gerdom
Created: 2/5/2003
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Easements
Number: 145 Created: l l/1/2002
Please provide off -site easements for all storm sewer extensions beyond the property line. A letter of
intent is needed prior to hearing and full easements would be required prior to plan approval.
Topic: Erosion Control
Number: 149
February 12, 2003
Created: l l / 1 /2002
Please provide report, plans and calculations in accordance with City of Fort Collins erosion control
specifications. Please contact Bob Zakley City Erosion Control Inspector to set up a meeting and
discuss this project.
Topic: Gas Line conflict at Storm Line C lateral
Number: 211 Created: 2/13/2003
Please provide elevation of the gas line and the proposed storm drain lateral that crosses the gas line
and feeds into Line C. Check for potential conflict, maintain 18" clear from pipe outside diameter.
Topic: Illinois Drive Drainage
Number: 209 Created: 2/ 13/2003
Please make sure that flows along the east flowline of Illinois Drive are channeled through cross pans
at street intersections.
Topic: Inlet B-5 A profile
Number: 214 Created: 2/ 13/2003
Please provide a profile between inlet B-5 A and Line B. Check for conflicts with existing utilities.
Page 10
7-32A Street intersection x-pan approach detail (eely if will have a street ..with a X pan. Ne ne µfe
1. far, butother details For them are ,.1-,......)
1 n1 1�Pe 147 baFFieadeor GDPT d ♦ 'l will l( ..s well)
i detail will r�wvrcc a.. � ..�
16 3 vef4ieal and h 1 1earanees F '.1 ...11...
2/13/03 Struck out items provided other two details not yet provided.
Number: 223 Created: 2/13/2003
Your general note #3. If you desire to leave this statement on the plans, we need a letter from you for
our files that gives us permission to reproduce these plans. Once signed these plans become public
documents on file with us. At that time we will make copies for anyone that requests them.
Number: 224 Created: 2/13/2003
Make minor changes/corrections to the Illinois typical x-section.
Number: 225 Created: 2/13/2003
Need to provide a typical section for Limon. This can be on the Limon Design sheet.
Number: 226 Created: 2/13/2003
The radii for the entry drives where changed to meet the standards are correctly shown, but the radii
at the street intersections were changed from what was originally correctly shown. They are now
shown too small, Drake and Illinois is a 25 ft radius not the 15 ft shown, and Custer and Illinois is a
20 ft radius not the 15 foot shown.
Number: 227 Created: 2/13/2003
Need to add a directional ramp at Drake and Illinois for the Xing going north.
Number: 228 Created: 2/13/2003
Need to show the directional ramps to be installed at Custer and Illinois intersection.
Number: 229 Created: 2/13/2003
Need to make sure that the access driveways correspond with the maximum x-slopes allowed. Need
to meet ADA requirements of 48:1 in the sidewalk area. The ramps and x-section of the drive will be
built in accordance with detail 7-29B.
Department: Light & Power Issue Contact: Monica Moore
Topic: General
Number: 160 Created: 1/28/2003
The transformer for King Soopers and Lot 2 is not located in the utility easement.
Number: 161 • Created: 1/28/2003
The transformer between lots 6 and 7 needs to be located within 10-feet from a paved drive -over
surface.
Number: 162 Created: 1/28/2003
The utility easements identified on the plat must encompass the placement of the electric lines and
transformers.
Number: 163 Created: 1/28/2003
Pad C is shown over a proposed 10-foot gas and electric easement.
Page 9
between the access points the taper needs to meet the min taper requirement of 8:1 (96 feet) and the
remaining distance will be the tumlane/decel length.
Number: 71 Created: 10/29/2002
10/29/02 the right turn transition length and the turn lane length. 2/13/03 This has been done for the
interim (needs to be corrected), but needs to be done also for the ultimate.
Number: 73 Created: 10/29/2002
10/29/02 Add the patching note. 2/4/03 repeat
Number: 208 Created: 2/13/2003
The right turn lane curb and gutter work being shown for the right turn lane at Drake Road does not
need to be shown as being done now. It will be done with the future widening of the road. This
needs to be shown as a part of the ultimate design provided along here.
Topic: Utility Plans
Number: 30 Created: 10/29/2002
10/29/02 The typical cross section for Illinois.
Show the sidewalk and tree grate location.
2/4/03 locate the tree grates
Number: 40 Created: 10/29/2002
10/29/02 Need more elevations and information provided at the access driveways. The access
driveways are to be concrete to the property line built in accordance with detail 7-29B. No more than
500 sq feet of area can drain across the sidewalk. Need more information to verify that this is being
built. 2/13/03 Still have two drives which need more information. From the elevations provided it is
not clear where the drainage goes. Need to know what is to be inflow and outflow curb and gutter.
Number: 41 Created: 10/29/2002
10/29/02 Provide flow arrows on the grading plan in the street. 2/13/03 Repeat
Number: 62 Created: 10/29/2002
10/29/02 Add the following note to the Overall Utility Plan sheet. It will also need to be added to the
sheets where the driveway cuts, new curb and gutter and median modifications are shown. I have not
identified the limits of paving as until we know all the proposed cuts for utilities and curb and gutter
replacement this can not fully be determined. The note is as follows: Limits of street cuts are
approximate. Final limits to be determined in the field by the City Engineering Inspector. All repairs
to be in accordance with City Street Repair Standards. 2/13/03 Repeat
Number: 64 Created: 10/29/2002
10/29/02 For all utilities and pipes located under streets a minimum 2 feet of cover below the
subgrade is required. See Section 12.2.2. A few locations do not meet this and when the x-section of
Illinois Drive is corrected a few more places may not meet this requirement. 2/13/03 Still true - a
couple of locations do not appear to have minimum cover. Also missing a few storm sewer profiles,
thus unable to determine if minimum cover is being provided there.
Number: 83 Created: 10/29/2002
10/29/02 Provide the additional details:
7-29B high volume driveway (t=6")
Page 8
Number: 217 Created: 2/13/2003
Correct the certification of dedication statement, repair guarantee statement, notice of other
documents statement, and the approved form by the City Engineer statement and signature line.
Number: 218 Created: 2/13/2003
Does the City own part of this property? I didn't think we did, but you show the City signing as an
owner. Unless we do own some of this property the City needs to be removed as an owner.
Number: 219 Created: 2/13/2003
Public service signature probably needs to be more of accepting the easements dedicated to them as
shown rather than signing as an owner.
Number: 220 Created: 2/13/2003
For the easements being noted as being vacated, only the portions within the platted boundaries will
be vacated.
Number: 221 Created: 2/13/2003
The stub for Limon needs to be dedicated in order for the curb returns to be built.
Number: 222 Created: 2/13/2003
Need to show the separation between the different types of easements. Or can make it easier and just
call them utility and/or drainage easements as appropriate.
Topic: Timberline Road
Number: 67 Created: 10/29/2002
10/29/02 Show the ultimate flowline on these plans as it was shown on the Timberline plans. 2/4/03
Need to label the future curb for the right turn at Drake.
Number: 68 Created: 10/29/2002
10/29/02 Need to provide a flowline design and cross sections for this street. The design and cross
sections need to show the design for the interim and for the ultimate 6 lane section. The original
design will change due to the relocation of the driveway into the site. The original right turn lane
design at Drake road included decal for the right -in only access. Now that this access point is gone
the right turn lane needs to be shortened and redesigned. The new right turn lane will need to be
designed for both what is to be built now and for the 6 lane section. Need to show that the driveway
placement will work with radii locations. 2/4/03 repeat
Number: 69 Created: 10/29/2002
10/29/02 Additional row and easements need to be dedicated where the new right turn lane is to be
placed. This was not accounted for in the original dedication. The sidewalk along here will also need
to be built or rebuilt in the ultimate location and the landscaping within the parkway needs to be put
in the ultimate parkway location. Show the new row and easement locations on the plans. 2/4/03
repeat. Row is not shown correctly and the easement is not shown. The row needs to reflect the right
turn lane design. Provide a 15 foot utility easement behind the new row.
Number: 70 Created: 10/29/2002
10/29/02 Will need a variance for the right turn lane design. (does the interim and ultimate differ in
lengths or will the variance work for both?) 2/13/03 A variance was submitted. The calculations
within the variance were incorrect. A right turn lane length of 405 feet is needed with 160 feet of that
being the taper and 245 feet begin the turnlane/ decel length. Since we do not have this distance
Page 7
Number: 204
Created: 2/13/2003
Need to identify the true lengths of those areas that are not parallel to the centerline.
Number: 205
Created: 2/13/2003
The x-slope on the street needs to be consistent. Quarter crowns are not allowed on new construction.
Number: 206 Created: 2/13/2003
Need to show the x-pan that is needed at the intersection of Limon Drive and Illinois Street. It needs
to be built with this street construction.
Number: 207
Created: 2/13/2003
Need to correct the undrainable low spots shown on along Illinois.
Topic: Landscape Plan
Number: 233 Created: 2/13/2003
A note on the site plan indicates easements will be vacated by separate document. If they are to be
done that way and not on the plat I will need to receive a request for the vacation and they will need
to be routed.
Number: 234 Created: 2/13/2003
Curb is being identified on Drake Road that is not planned to be installed.
Number: 235 Created: 2/13/2003
Need to identify on the landscape plan that the street trees on Timberline are to be planted 5 feet the
sidewalk. This will place them in the middle of the future parkway and in that way they should not
need to be removed or disturbed when the future widening is done.
Topic: Limon Drive
Number: 55 Created: 10/29/2002
10/29/02 Show a type III barricade across the street just behind the sidewalk. 2/4/03 Shown, but
needs to be labeled also.
Number: 57
Created: 10/29/2002
10/29/02 Where does the drainage go? Is a cross pan needed across this street or will the drainage off
of Illinois Drive go around the corner onto Limon Drive? If it goes onto Limon need to show where
it goes and provide a swale if necessary. If any amount of drainage will come of the end of the street
rip rap and protection will need to be shown to prevent undermining of the pavement, curb and gutter.
2/4/03 repeat - need to show the x-pan that appears to be needed.
Topic: Plat
Number: 88 Created: 10/29/2002
10/29/02 Need to show the additional row and easements that are needed on Timberline Road to
accommodate the right turn lane. 2/13/03 The row will need to be adjusted based on the change in
the right turn lane design from what was shown and a 15 foot utility easement needs to be dedicated
behind the row.
Number: 89
Created: 10/29/2002
10/29/02 Need to provide an access easement for the parking lot areas. 2/13/03 If other provisions
are to be put in place in lieu of an easement I need to see those documents.
Page 6
Number: 232 Created: 2/13/2003
Response to variance requests will be forthcoming.
Topic: Illinois Drive
Number: 44 Created: 10/29/2002
10/29/02 Provide curb return profile information. 2/13/03 Curb returns need to meet minimum grades
and standards for grade changes.
Number: 45 Created: 10/29/2002
10/29/02 Provide elevations at the intersections in accordance with standards. Provide on plan view
or provide separate intersection details. 2/13/03 repeat
Number: 46 Created: 10/29/2002
10/29/02 Use 30 mph design speed for this road. 2/13/03 still applicable.
Number: 48 Created: 10/29/2002
10/29/02 Identify inlet size and location in the profiles. 2/13/03 Repeat - Have several low points that
do not have inlets shown at them. Need to provide inlets at low spots or adjust grades so that low
spots are at the inlets. Can not have an inlet located within a curb return or where a ramp is located.
Number: 52 Created: 10/29/2002
10/29/02 Need to show how the drainage is going to work along the flowline of this street. The curb
line defining the parking needs to be designed similar to how the curbs are built in downtown.
2/13/03 the drainage has not been shown to work along the street yet.
Number: 53 Created: 10/29/2002
10/29/02 Will need to figure out if the directional ramp at the intersection of Illinois Drive and Custer
Drive will work with the existing inlet location. May need a detail to show that this will work and
how it will fit. 2/13/03 Response was it will work, but the ramp is not shown. Still need to see how
this works.
Number: 199 Created: 2/13/2003
Need to define the station points along the flowline where the curves are. Need to be able to relate
the profiles to the plan view.
Number: 200 Created: 2/13/2003
Max grade change (except at an inlet) is .40%. Grade change at an inlet would be 1% (.5% going into
the inlet on both sides).
Number: 201 Created: 2/13/2003
Minimum grade of .50% needs to be met along the flowline.
Number: 202 Created: 2/13/2003
If it makes sense and does not affect the ride of the road greater grade changes going into the parking
areas will be allowed. Additional information needs to be provided on the plans to determine how the
plan and profile correspond and weather the changes shown are acceptable.
Number: 203 Created: 2/13/2003
Missing some slope information
Page 5
Number: 19 Created: 10/29/2002
10/29/02 Variance requests are to be from a licensed Engineer. The letter(s) need to include all the
information required in section 1.9.2 including a justification. 2/13/03 Still applicable.
Number: 20 Created: 10/29/2002
10/29/02 A letter of intent for off -site easements and/or row needs to be from and signed by the
person(s) dedicating the easement/ row. Easements are needed for any area outside of the plated
boundary or dedicated row where work is to be done with the project. Will need row for the left turn
lane on Drake from the property on the north side of Drake Road. It also appears that easements will
be needed from the property to the east. 2/4/03 repeat
Number: 21 Created: 10/29/2002
10/29/02 Need to show the phasing on these plans. Are the utilities to be phased? Is the parking lot
construction to be phased? Need to show what improvements will be done with each phase. 2/4/03
No phasing is shown will assume everything shown to be built.
Number: 24 Created: 10/29/2002
10/29/02 Provide information as required in the Appendix E-4 returned to the applicant. 2/13/03 Still
applicable
Number: 25 Created: 10/29/2002
10/29/02 See the plans for additional comments.2/13/03 Still applicable.
Number: 33 Created: 10/29/2002
10/29/02 Several variances are needed for the driveways off of Drake Road. These need to be
submitted in. 2/13/03 A couple of the variances need were received. Responses to the request will be
forth coming.
Number: 36 Created: 10/29/2002
10/29/02 Need to meet the parking setback requirements for the parking on Illinois Drive. See detail
19-03. Distance is 100 feet from Drake Road flowline and 60 feet for all other intersections. 2/13/03
Some adjustments need to be made so that these dimensions are met.
Number: 153 Created: 11 /4/2002
11/4/02 Street cut fees for all cuts into existing roadways will be assessed at the time of the
Development Construction Permit. Fees are tripled for roads less than 5 years old (Drake, Custer and
Timberline). For roads where more than one cut is made, an overlay of the entire street width,
including the patched area may be required. 2/13/03 Still applicable. General limits of patch area
will be identified in next round of review.
Number: 154 Created: 11/4/2002
11/4/02 Need to provide signing and striping plans for all streets surrounding the site. 2/13/03 Still
applicable.
Number: 231 Created: 2/13/2003
Need to see what the screen wall/fence looks like and what material it is made of. It will need to be
designed so that the utilities located under it or going under it can be accessed without the wall falling
down or that those sections of fence can be removed during utility work. Several of the posts are
sitting directly on or very close to a utility.
Page 4
2/4/03 repeat the row needs to be identified and obtained. Will need a letter of intent prior to being
scheduled for a hearing.
Number: 76 Created: 10/29/2002
10/29/02 Need to provide flowline and median profiles and information, Curve data, cross sections
and striping plans for the interim design and ultimate design for Drake Road. 2/4/03 repeat
Number: 77 Created: 10/29/2002
10/29/02 This project needs to show how this left lane will tie into the full improvements (JR Eng did
the design - these plans have not been approved yet, we are waiting on all the easements and row they
need to be obtained) when they are built. 2/4/03 repeat
Number: 78 Created: 10/29/2002
10/29/02 This project can tie into the interim pavement if it still exits at the time of construction. If
full improvements have been built or are in the process of being built than this project will need to
work with Rigden Farms to get the ultimate section built. 2/4/03 repeat
Number: 79 Created: 10/29/2002
10/29/03 The design tying this project into the interim pavement section needs to include an
acceptable design that works and needs to go past Iowa. Use a 40:1 taper. 2/13/03 Repeat: A taper
meeting standards needs to be provided.
Number: 81 Created: 10/29/2002
10/29/02 This project needs to address the two one way bridges east of here. This needs to be
evaluated in the traffic study. This project will need to design and pay for the signalization of these
two bridges at the time of construction if not already done by Rigden 6th filing. 2/13/03 The
evaluation was received. The signaliztion requirement will be added to the DA unless traffic
operations indicates that it is no longer necessary or has already been done prior to finalizing the
development agreement for this project.
Number: 195 Created: 2/13/2003
The existing standard lane widths need to remain. The lane widths can not be reduced. Travel and
turn lanes 12 feet wide, bike lanes 8 feet wide, parkway 10 feet wide, sidewalk 6 feet wide, and island
4 feet wide minimum.
Number: 196 Created: 2/13/2003
Add the pavement patch note to this sheet.
Number: 197 Created: 2/13/2003
See plans for another suggested island configuration for the left turn lane. Something like it may
work better.
Number: 198 Created: 2/13/2003
Angle points are not allowed. The tie into existing curb and gutter and transition to future curb and
gutter can not be done with angle points. See standards for min arc lengths required.
Topic: Genera[
Number: 17 Created: 10/29/2002
10/29/02 Provide current general notes and applicable construction notes. 2/13/03 Make corrections
and add missing notes.
Page 3
shop. The King Soopers storefront does not have the same requirements as the retail and could
certainly provide for some trees and shrubs in tree wells and/or planting beds in the hardscape
pedestrian areas between the curb and building. As previously stated, a good example of how
landscaping can be implemented around the "big box" use and associated in -line retail is at the new
Super Wal-Mart store at East Mulberry Street & Lemay Avenue. They have both trees and shrubs in
areas that do not impede pedestrian movement or visibility.
Number: 192 Created: 2/ 12/2003
Signage location only should be shown on the building facades on the Building elevations plans. The
actual content and size is determined through the Zoning Department and the Sign Code after
approval of the project and in association with a building permit application.
Number: 193 Created: 2/ 12/2003
Section 3.5.4(C)(1)(a)2 of the Land Use Code states that ground floor facades that face public streets
shall have arcades, display windows, entry areas, awnings or other such features along no less that
60% of their horizontal length. The west elevation of King Soopers, facing Timberline Road,
certainly does not satisfy this standard. Open trellis canopies have been added to a portion of this
facade in the amount of about 20%. There are no display windows, entry areas, other such features, or
arcades on this side of the building. The definition of "arcade" in The New Illustrated Book of
Development Definitions is:
A continuous passageway parallel to and open to a street, open space, or building, usually
covered by a canopy or permanent roofing, and accessible and open to the public.
Based on this definition, it is difficult to see a continuous passageway that is parallel to and open to
Timberline Road and is accessible and open to the public. There is a limited amount of building
articulation on this facade and it certainly has no public accessibility from the Timberline Road public
sidewalk to the building.
Number: 194
Created: 2/ 12/2003
The northerly -most section of the King Soopers north elevation, about 113' to 115' in length, does not
appear to satisfy the requirement set forth in Section 3.5.4(C)(1)(a)l regarding the projections or
recesses having a depth of at least 3% of the wall/facade length of greater than 100'.
Number: 230 Created: 2/13/2003
Both the east and west elevations of the building identified as Retail 'C' would appear to have equal
pedestrian entry value; however, no doors are shown on either elevation. The "no door" part of this
comment holds true for the south elevation of the building identified as Retail 'A', being the in -line
retail store attached to King Soopers.
Number: 236 Created: 2/13/2003
Is there to be a walk-up service option for the ATM in the bank? Section 3.2.2(H)(4) of the Land Use
Code requires that a walk-up be provided if there is a drive-in, such as the drive-in ATM shown on
the Site & Landscape Plans and the Building Elevations.
Department: Engineering
Topic: Drake Road
Number: 75
Issue Contact: Sheri Wamhoff
Created: 10/29/2002
10/29/03 Identify the additional row that is needed on the property north of Drake Road to
accommodate the additional width needed to provide the left turn lane with the ultimate design.
Page 2
STAFF PROJECT REVIEW
Citvof Fort Collins
Wyatt & Associates Date: 2/13/2003
c/o Dennis Wyatt
1865 South Pearl Street
Denver, CO. 80210
Staff has reviewed your submittal for RIGDEN FARM 8TH FILING, THE SHOPS @ RIGDEN
FARM, and we offer the following comments:
ISSUES:
Department: Advance Planning
Topic: General
Number: 168
No comments.
Issue Contact: Clark Mapes
Created: 2/4/2003
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 187 Created: 2/12/2003
In attempting to satisfy the Facades and Exterior Walls requirement set forth in Section 3.5.4(C)(1) of
the Land Use Code it is important to show in plan view how the projections and recesses are being
accomplished. The Site Plan, at 1 "=50' scale, does not adequately convey how the building footprint
relates to the building elevations. Are the depths and lengths needed to sufficiently break up the
building being provided? I believe that staff and the applicant discussed this at our meeting on
November 25, 2002, and I possibly provided an example plan to the applicant with a specific building
side footprint plan on the same sheet as the corresponding elevation. This method has worked very
well on other projects.
Number: 188 Created: 2/12/2003
The Building Elevations sheets do not appear to show any wall mounted lighting. Is this being
proposed? If so, the Photometric Plan does not reflect this and does not take into consideration wall
mounted lighting. It may have an affect on the overall foot-candles and the security lighting issue that
Police Services is concerned about.
Number: 189 Created: 2/12/2003
Smooth -faced block, as proposed on the Building Elevations, is not permitted on large retail, per
Section 3.5.4(C)(1)(e)4 of the Land Use Code.
Number: 190 Created: 2/12/2003
The plans as submitted do not clearly and legibly show the proposed Future Building north of Retail
B (Site Plan Flag Note 19).
Number: 191 Created: 2/12/2003
City staff did receive the request/justification for Alternative Compliance for the Foundation
Plantings around buildings as set forth in Section 3.2. 1 (E)(2)(d) of the Land Use Code. An
implementation plan of some sort must be provided to ensure that sufficient plantings are
incorporated in pedestrian areas directly related to the King Soopers building and Buildings A, B, and
C. The only real enforceable mechanism the City has after the fact are the approved, recorded and
filed development plans. However, the stated justification for the Alternative Compliance is that the
retail buildings will have display windows that are dependent on pedestrians having access to window
Page 1