Loading...
HomeMy WebLinkAboutREDTAIL - MAJOR AMENDMENT - 26-01B - CORRESPONDENCE -The Redtail, Major Amendment is being placed on the August 16, 2007, Planning & Zoning Board public hearing agenda. Please submit 8 copies of the following documents no later than Friday, August 3, 2007: • Site Plan • Landscape Plan • Building Elevations Plan • Lighting Plan • Shadow Analysis Plan Be sure and return all red -lined plans if/when you re -submit before the public hearing. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yoo�jurr/s�T� Truly, --;1 W Steve Olt City Planner cc: Susan Joy Vaught Frye Ripley Associates, Inc. North Star Design, Inc. Planning & Zoning file #26-01B Page 4 r Topic: Utility Plans Number: 45 Created: 7 / 11 / 2007 [7/ 11/07] Sheet 10 has a labeled a pedestrian ramp with a "2' sidewalk chase"...I think this was a mistake or something : ) Number: 46 Created: 7/ 11 / 2007 [7/ 11 / 07] Depending on the timing, this could actually be revision number 2 with the first revision being the grading sheet you're currently working on. Please see me about the area around the boxes because if the grading sheet is approved before this one (more than likely), then you'll need to show the "new" spot elevations from the newly revised grading sheet. Department: Light & Power Issue Contact: Doug Martine Topic: Utility Plans Number: 41 Created: 7/ 10/2007 [7/ 10/07] The electric transformers for buildings 1-4 will be pad type, most likely 79" wide x 56" deep and approximately 4.5' tall. They must have 8' of unobstructed clearance in front and 3' on the other 3 sides, and be a minimum of 2' from a sidewalk. Also transformers must be within 10' of an all-weather surface accessible to electric line trucks. It appears this plan meets all these criteria except sidewalk clearance. It is suggested that these transformers be farther westerly to be closer to the driveway or parking lot to provide access. Also, the transformer S.E. of building 3 is shown within the site distance easement, which it is assumed does not meet the site easement requirement. Number: 42 Created: 7/ 10/2007 [7/ 10/07] The electric services from the transformer to these commercial buildings will be installed by the builder/developer, and maintained by the building owner. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 43 Created: 7/ 10/2007 [7/ 10/07] PFA has no additional comments or concerns at this time. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Utility Plans Number: 47 Created: 7/ 13/2007 [7/ 13/07] Please add a note the utility plan labeling the 15 " PVC pipe to the west of Lot 6as a private pipe system to be owned and maintained by the property owner(s). Page 3 screened as a mitigation measure adjacent to the wetlands and natural areas. Department: Current Planning Issue Contact: Steve Olt Topic: Utility Plans Number: 48 Created: 7/ 19/2007 [7/ 19/07] Terry Farrill of the Fort Collins -Loveland Water District and the South Fort Collins Sanitation District indicated that they have reviewed this project and have no further comments. They are ready to sign the mylars of the plans. Number: 49 Created: 7/ 19/2007 [7/ 19/07] Dana Leavitt's, the Environmental Planner, current comments are related to the site lighting and the Lighting Plan (see Comment #36, above, in this letter). Department: Engineering Issue Contact: Susan Joy Topic: General Number: 22 Created: 5 / 2 / 2007 [7/ 11/07] The vacation request has been routed with comments due back by July 20, 2007. [5/2/07] The building on Lot 8 is located outside of the platted building envelope and within a utility easement. Please provide a written vacation request plus a completed TDRF application and the associated fee. I will route the vacation request to the various utilities and get back to you as soon as they approve or deny it. Once we've received the paperwork, this process takes 2 to 3 weeks including mail time. You do NOT have to wait until the next submittal to do this. You can submit the paperwork anytime and I'll get it out within a day or two. Number: 23 Created: 5 / 2 / 2007 [7/ 11/07] Thanks for the note on the red -lines, Troy! And yes, as long as the scanning issues are taken care of before mylars, you are fine. [5/2/07] Scanning issues exist. This does not need to be addressed until mylars, but just wanted to make you aware of it early on. Number: 26 Created: 5/2/2007 [7/ 11/07] Just keeping the comment alive until this step has been completed. [5/2/07] We will need to amend the original Development Agreement for Redtail where the number of building permits change and effect certain payments or construction of certain improvements. We can work through that in Final Compliance - it does not need to be addressed prior to hearing. Number: 44 Created: 7/ 11 / 2007 [7/ 11 /07] From Technical Services: No comments. Page 2 STAFF PROJECT REVIEW Cityof Fod Collins Jon Prouty Date: 07/ 19/2007 Lagunitas Redtail, Inc 3944 JFK Parkway, Suite 12E Fort Collins, CO 80525 Staff has reviewed your submittal for REDTAIL, MAJOR AMENDMENT - TYPE 2, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Elevations Plan Number: 50 Created: 7/ 19/2007 [7/ 19/07] The information submitted for the "special" Building Height Review, per Section 3.5.1(G), appears to be adequate as it relates to Views, Light & Shadow, Privacy, and Neighborhood Scale. However, the buildings are very monolithic, without much architectural articulation or interest as this relates to form, materials, and color. Topic: General Number: 51 Created: 7/ 19/2007 [7/ 19/07] The item is being scheduled for the August 16, 2007, Planning & Zoning Board public hearing for a decision on the Redtail, Major Amendment to convert this portion of the project from residential to office uses. Department: Current Planning Issue Contact: Dana Leavitt Topic: General Number: 40 Created: 7 / 4 / 2007 [7/4/07] Under Comment # 39, Environmental Planner, Dana Leavitt's request for an Existing Conditions Plan has been addressed. Topic: Photometric Plans Number: 36 Created: 5/2/2007 [7/4/07] Fixture with built in house -side shield is insufficient to screen light from fixtures. If the consultant does not understand this comment, have them contact Steve Olt for complete explanation of the standard as referenced below. In Luminaire Schedule add description for exterior house -side shield. [5/2/07] The proposed fixtures on the east and south edges of the new parking lots adjacent to the buffer areas are to be screened from the buffer area and the adjacent City owned natural area with house -side shields. To meet the standards in 3.4.1(E)(1) of the LUC, the actual fixture is to be Page 1