HomeMy WebLinkAboutREDTAIL - MAJOR AMENDMENT - 26-01B - CORRESPONDENCE - REVISIONSThe Redtail, Major Amendment is being placed on the August 16, 20079
Planning & Zoning Board public hearing agenda. Please submit 8 copies
of the following documents no later than Friday, August 3, 2007:
• Site Plan
• Landscape Plan
• Building Elevations Plan
• Lighting Plan
• Shadow Analysis Plan
Be sure and return all red -lined plans if/when you re -submit before the
public hearing.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
*051 W
Steve Olt
City Planner
cc: Susan Joy
Vaught Frye Ripley Associates, Inc.
North Star Design, Inc.
Planning & Zoning file #26-01B
Page 4
Topic: Utility Plans
Number: 45 Created: 7/ 11 /2007
[7/ 11/07] Sheet 10 has a labeled a pedestrian ramp with a "2' sidewalk
chase"...I think this was a mistake or something : )
Number: 46 Created: 7/ 11 / 2007
[7/ 11/07] Depending on the timing, this could actually be revision number
2 with the first revision being the grading sheet you're currently working on.
Please see me about the area around the boxes because if the grading sheet
is approved before this one (more than likely), then you'll need to show the
"new" spot elevations from the newly revised grading sheet.
Department: Light & Power Issue Contact: Doug Martine
Topic: Utility Plans
Number: 41 Created: 7/ 10/2007
[7/ 10/07] The electric transformers for buildings 1-4 will be pad type, most
likely 79" wide x 56" deep and approximately 4.5' tall. They must have 8' of
unobstructed clearance in front and 3' on the other 3 sides, and be a
minimum of 2' from a sidewalk. Also transformers must be within 10' of an
all-weather surface accessible to electric line trucks. It appears this plan
meets all these criteria except sidewalk clearance. It is suggested that these
transformers be farther westerly to be closer to the driveway or parking lot
to provide access. Also, the transformer S.E. of building 3 is shown within
the site distance easement, which it is assumed does not meet the site
easement requirement.
Number: 42 Created: 7/ 10/2007
[7/ 10/07] The electric services from the transformer to these commercial
buildings will be installed by the builder/ developer, and maintained by the
building owner.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 43 Created: 7/ 10/2007
[7/ 10/07] PFA has no additional comments or concerns at this time.
Department: Stormwater-Water-Wastewater Issue
Contact: Basil Hamdan
Topic: Utility Plans
Number: 47 Created: 7/ 13/2007
[7/ 13/07] Please add a note the utility plan labeling the 15 " PVC pipe to
the west of Lot 6as a private pipe system to be owned and maintained by the
property owner(s).
Page 3
screened as a mitigation measure adjacent to the wetlands and natural
areas.
Department: Current Planning Issue Contact: Steve Olt
Topic: Utility Plans
Number: 48 Created: 7/ 19/2007
[7/ 19/07] Terry Farrill of the Fort Collins -Loveland Water District and
the South Fort Collins Sanitation District indicated that they have
reviewed this project and have no further comments. They are ready to sign
the mylars of the plans.
Number: 49 Created: 7/ 19/2007
[7/ 19/07] Dana Leavitt's, the Environmental Planner, current comments
are related to the site lighting and the Lighting Plan (see Comment #36,
above, in this letter).
Department: Engineering Issue Contact: Susan Joy
Topic: General
Number: 22 Created: 5 / 2 / 2007
[7/11/071 The vacation request has been routed with comments due back
by July 20, 2007.
[5/2/07] The building on Lot 8 is located outside of the platted building
envelope and within a utility easement. Please provide a written vacation
request plus a completed TDRF application and the associated fee. I will
route the vacation request to the various utilities and get back to you as
soon as they approve or deny it. Once we've received the paperwork, this
process takes 2 to 3 weeks including mail time. You do NOT have to wait
until the next submittal to do this. You can submit the paperwork anytime
and I'll get it out within a day or two.
Number: 23 Created: 5/ 2 / 2007
[7/ 11 /07] Thanks for the note on the red -lines, Troy! And yes, as long as
the scanning issues are taken care of before mylars, you are fine.
[5/2/07] Scanning issues exist. This does not need to be addressed until
mylars, but just wanted to make you aware of it early on.
Number: 26 Created: 5/2/2007
[7/ 11/07] Just keeping the comment alive until this step has been
completed.
[5 / 2 / 071 We will need to amend the original Development Agreement for
Redtail where the number of building permits change and effect certain
payments or construction of certain improvements. We can work through
that in Final Compliance - it does not need to be addressed prior to hearing.
Number: 44 Created: 7/ 11 /2007
[7/ 11 /07] From Technical Services: No comments.
Page 2
6aSTAFF PROJECT REVIEW
City of Fort Collins
Jon Prouty Date: 07/ 19/2007
Lagunitas Redtail, Inc
3944 JFK Parkway, Suite 12E
Fort Collins, CO 80525
Staff has reviewed your submittal for REDTAIL, MAJOR AMENDMENT -
TYPE 2, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Elevations Plan
Number: 50 Created: 7/ 19/2007
[7/ 19/07] The information submitted for the "special" Building Height
Review, per Section 3.5.1(G), appears to be adequate as it relates to Views,
Light & Shadow, Privacy, and Neighborhood Scale. However, the buildings
are very monolithic, without much architectural articulation or interest as
this relates to form, materials, and color.
Topic: General
Number: 51 Created: 7 / 19 / 2007
[7/ 19/07] The item is being scheduled for the August 16, 2007, Planning
& Zoning Board public hearing for a decision on the Redtail, Major
Amendment to convert this portion of the project from residential to office
uses.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: General
Number: 40 Created: 7/4/2007
[7/4/07] Under Comment # 39, Environmental Planner, Dana Leavitt's
request for an Existing Conditions Plan has been addressed.
Topic: Photometric Plans
Number: 36 Created: 5/2/2007
[7/4/07] Fixture with built in house -side shield is insufficient to screen
light from fixtures. If the consultant does not understand this comment,
have them contact Steve Olt for complete explanation of the standard as
referenced below. In Luminaire Schedule add description for exterior
house -side shield.
[5/2/07] The proposed fixtures on the east and south edges of the new
parking lots adjacent to the buffer areas are to be screened from the buffer
area and the adjacent City owned natural area with house -side shields. To
meet the standards in 3.4.1(E)(1) of the LUC, the actual fixture is to be
Page 1
Comment #48
Acknowledged
Comment #49
Acknowledged
Comment #22
Acknowledged
Comment #23
Continuing to work on scanning issues. This will be resolved before mylars.
Comment #26
Acknowledged
Comment #44
Acknowledged
Comment #45
This was originally a drainage channel. Due to new drainage patterns this "ramp" has been removed. See
revised plans.
Comment #46
Acknowledged. North Star has used "revision 2" for the grading sheets. See revised plans.
Comment #41
Adjusted pads to 79" x 56". See revised.
Comment #42
Acknowledged
Comment #43
Acknowledged
Comment #47
Added notes to the grading and the utility plans that the PVC drain line is the responsibility of the HOA.
SiVrouty
Jo
Enclosures
3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125
a-,
To: Steve Olt
From: Jon Prouty
Re: Redtail Major Amendment #1
Response to Staff Comments --- July 19, 2007
Date: August 28, 2007
Comment #50
With regard to the building's architecture (see color elevation enclosed):
A. Philosophy — our goal is to create a building with a sense of Frank Lloyd Wright horizontal
design elements, which has both simple elegance and design integral to function. This is in
contrast to most office buildings you see today which are concrete cubes or shoe boxes with
architectural doo-dads glued on them.
B. A colored concrete garage at the ground level, softened by landscaping, is complementary to
the brown earth -tone rough face block base band above it.
C. A major design element of the building is the central vertical brown earth -tone rough -faced
block element. Functionally it incorporates the entry lobby and stairs - elevator lobbies at each
level. It is a unique design feature with many subtle design aspects:
- It projects about 6 ft. from the building.
- It has an angled wall top.
- The bank of windows is angled at the top complementary to the roof angle.
- The windows are a major design element with both glass wall design diversity and off -set.
- Three bands of stucco complementary to the rough face block, both in color and texture.
- Three banks of recessed windows.
- Roof step-downs at one end.
Comment #51
Acknowledged --- Major Amendment approved at Planning and Zoning Board public hearing.
Comment #40
Acknowledged
Comment #36
The internal optical system used in the fixture was selected because it has the best backlight control
available on the market. It allows light to actually escape forward AND to the sides while radically
limiting backlight thus making the parking lot it's used in safe (without dark shadows between perimeter
fixtures in the lot itself). With external shielding, the side to side throw can be severely cut off and not
light the areas needed in the lot if the backlight is controlled well, while if the side to side is maintained
you often have more back spill than desired at the sides. The R4SC is such an innovation that the
manufacturer has even put together a full color brochure to explain the physical properties of the optical
system (see attached brochure for your review). There is no factory supplied external shield since it has
been deemed not optically necessary due to the availability of the R4SC optical system.
3944 JFK Parkway, 12E, Fort Collins, CO 80525 • (970) 226-5000 • Fax (970) 226-5125