HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYFUTURE TRANSIT LEVEL OF SERVICE
Travel Time Worksheet
,a� MIN}iq
h$�i'.
JL< N
:t y v Ai > T5l
'afl'mr«....w a '�' �,p4
CSU Campus Transit Center
4.8
18
37
2.1
Foothills Fashion Mall
2.0
11
24
2.2
Fort Collins High School
3.9
16
37
2.3
Downtown Fort Collins
5.3
19
40
2.1
Total Travel Time
64
138
2.2
Service Level Standards Worksheet
w
Hours of Weekday Service 18 hours 16 hours X
Weekday Frequency of Service 15 minutes 20 minutes X
Travel Time Factor 2.0 x 2.0 x X
Peak Load Factor s 1.2 <_ 1.2 X
2 of 4 = LOS.D
i i i i i i i i i i >• ;� i i i i i� i
Multimodal Transportation Level of Service Manual p.20
LOS Standards for Development Review - Bicycle
Figure 7. Bicycle LOS Worksheet
level of service - connectivity
nmunnan actual proposed
base connectivity: C 110-
pecific connections to priority sites:
s
description of applicable
destination area within 1,320'
including address
destination area
classification
(see text)
City of Fort Collins Transportation Master Plan
Pedestrian LOS Worksheet
Project Location Classification: Transit Corridor & Other
y S4]� � &`,.� � 1�'F`, y.'4..µ iwFr`�rk Y i'� ]`�{ � S r�..,�.�t�.�►�, 4 A V'n
r >�% f 1 $'VJ �P`•`F'`"�"k`clai. F. N1'�d5'Srx' `�z�7 �t 5x aL�+; ��� tlt t r{Z ry M'{Fayt
1
Offices adjacent to the
site (Fossil Creek Office
Park)
Office
Minimum
B
B
B
C
B
Actual
A
D
A
B
C
Proposed
A
D
A
B
C
2
Commercial uses north
of the site
Commercial
Minimum
B
B
B
C
B
Actual
A
D
A
B
C
Proposed
A
B
A
B
C
3
Commercial/office uses
northeast of the site
Commercial/
Office
Minimum
B
B
B
C
B
Actual
B
D
C
B
C
Proposed
B
D
C
B
C
4
Residential area east of
the site (Fossil Creek)
Residential
Minimum
B
B
B
C
B
Actual
A
D
C
B
C
Proposed
A
D
C
B
C
5
Fairway Estates
Residential
Minimum
B
B
B
C
B
Actual
B
D
C
B
C
Proposed
B
D
C
B
C
6
Minimum
Actual
Proposed
7
Minimum
Actual
Proposed
g
Minimum
Actual
Proposed
g
Minimum
Actual
Proposed
10
Minimum
Actual
Proposed
0
Cameron
SCALE: 1"=1000'
PEDESTRIAN INFLUENCE AREA
10
0
ss�y
z
APPENDIX G
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
'Analyst:
Agency/Co.:
Date Performed:
Analysis Time Period:
'Intersection:
Jurisdiction:
Analysis Year:
Project ID: 0106
'East/West Street:
North/South Street:
Michael
Matthew J. Delich, P.E.
2/22/01
am
Co ege/RT-in/RT-out
Fort Colljns
short on total
RT-in/RT-out
College
Intersection Orientation: NS
' Vehicle
Major Street: Approach
Movement 1
Study period (hrs): 0.25
Volumes and Adjustments
Northbound Southbound
2 3 1 4 5 6
' L
T R
I L T
R
Volume
1370
20
-Hour Factor, PHF
0.95
0.95
'Peak
Hourly Flow Rate, HFR
1442
21
Percent Heavy Vehicles
-- --
Median Type Undivided
RT Channelized?
'Lanes
2 0
Configuration
T TR
Upstream Signal?
No
No
'Minor Street: Approach
Westbound
Eastbound
Movement 7
8 9
1 10 11
12
L
T R
I L T
R'
'Volume
Peak Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade M
Median Storage
flared Approach: Exists?
Storage
T Channelized?
Lanes
Configuration
9
Delay, Queue Length, and Level
Approach NB SB Westbound
,Movement 1 4 1 7 8 9
Lane Config I
0.95
15
2
0
No
1
R
of Service
Eastbound
1 10 11 12
1 R
v (vph)
15
'C (m) (vph)
807
v/c
0.02
95% queue length
0.06
ontrol Delay
9.5
CIS
A
��� pproach Delay
9.5
Approach LOS
A
katthew
Matthew
HCS2000: Unsignalized Intersections Release 4.1
J. Delich
J. Delich, P.E.
HCS2000: Unsignalized Intersections Release 4.1
'
TWO-WAY STOP CONTROL SUMMARY
'Analyst:
Agency/Co.:
Date Performed:
Analysis Time Period
'Intersection:
Jurisdiction:
Analysis Year:
Project ID: 0106
East/West Street:
North/South Street:
Michael
Matthew J. Delich, P.E.
2/22/01
am m
am
Fort Collins —
short <Gtotal
RT-in/RT-out
College
Intersection Orientation: NS
Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
Peak -Hour Factor, PHF
Hourly Flow Rate, HFR --
Percent Heavy Vehicles
Median Type Undivided
RT Channelized?
,Lanes
Configuration
Upstream Signal? No
0.95 0.95
800 84
2 0
T TR
No
,Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R I L T R
,Volume
Peak Hour Factor, PHF
Hourly Flow Rate, HFR
,Percent Heavy Vehicles
Percent Grade M
Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
_Configuration
111
5
0.95
5
2
0
No
1
R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
,Movement 1 4 1 7 8 9 1 10 11 12
Lane Config I I R
(vph)
1")C
,v (m) (vph)
912
v/c
0.01
95% queue length
0.02
ontrol Delay
9.0
OS
A
pproach Delay
9.0
Approach LOS
A
katthew
Matthew
HCS2000: Unsignalized Intersections Release 4.1
J. Delich
J. Delich, P.E.
Intersection Performance Summary _
'Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 336
1292
0.41
0.26
31.4
C
TR 393
1636
0.15
0.24
30.1
C
31.0
C
Vestbound
LT 336
1400
0.19
0.24
30.5
C
21.0
C
R 712
1583
0.41
0.45
18.9
B
Northbound
377
1770
0.07
0.59
8.6
A '
TR 2476
I
5054
0.66
0.49
16.5
B
16.4
B
'Southbound
L 429
1770
0.87
0.67
45.1
D
TR 2991
5070
0.60
0.59
8.2
A
14.5
B
Intersection
Delay
= 16.5
(sec/veh)
Intersection
LOS = B
' HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
'Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
'Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
_ OPERATIONAL ANALYSIS
Analyst: Michael
MAgency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16 01
Analysis Time Period: am p
Intersection: Col ege/Fossil Creek/Cameron
rea Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long kgr total
iproject ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
I'
HCS2000: Signalized Intersections Release 4.1
Michael
Inter.: College/Fossil Creek/Cameron
'Analyst:
Agency: Matthew J.
Delich,
P.E.
Area Type: All other areas
Date: 2/16/01
Jurisd: Fort Collins
am ®
Year recent short ong bkgr total
'Period:
Project ID: 0106
E/W St: Fossil Creek/Cameron
N/S St: College
'
SIGNALIZED INTERSECTION
SUMMARY
I Eastbound
i Westbound i Northbound I Southbound 1
L
T R
1 L T
R I L T R I L T R 1
I_
Lo. Lanes 1 1
__
1 0
1__
I 0 1
1 _ _ 1_
1 I 1 3 0 1 1 3 0 1
LGConfig 1 L
TR
I LT
R I L TR I L TR i
1130
10 45
150 10
275 125 1495 65 1355 1680 35 1
'Volume
Lane Width 112.0
12.0
1 12.0
12.0 112.0 12.0 112.0 12.0 1
RTOR Vol 1
0
1
0 1 0 I 0 I
'Duration 0.25
Area
Type: All
other areas
_
Signal
Operations
Phase Combination
1 2
3 4
1 5 6 7 8
'EB Left
A
I NB Left A P
Thru
A
1 Thru P
Right
A
1 Right P
Peds
X
I Peds X
B Left
A
I SB Left A A P
Thru
A
I Thru A P
' Right
A
1 Right A P
Peds
X
I Peds X
NB Right
I EB Right
Right
I WB Right A A
'SB
Green
24.0
6.0 10.0 49.0
Yellow
3.0
0.0 0.0 4.0
Red
2.0
0.0 0.0 2.0
r11
Cycle Length: 100.0 secs
11
Intersection Performance
Summary
Lane
Adj Sat
os
Lane
Group
Approach
URatippr/
Lane Group
Flow Rate
_
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 406
1269
0.10
0.32
24.0
C
TR 516
1666
0.07
0.31
24.4
C
24.2
C
Westbound
'LT 435
.1403
0.18
0.31
25.4
C
21.9
C
R 697
1583
0.53
0.44
21.2
C
Northbound
L 390
1770
0.14
0.59
9.3
A
TR 2530
5060
0.69
0.50
16.1
B
15.9
B
Southbound
L 269
1770
0.72
0.59
30.0
C
TR 2531
5061
0.40
0.50
12.4
B
15.3
B
' Intersection Delay
= 16.7
(sec/veh) Intersection
LOS = B
' HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
'Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Lone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
' OPERATIONAL ANALYSIS
Analyst: Michael
,Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2//�16/01
Analysis Time Period: /ampm
Intersection: ollege/Fossil Creek/Cameron
'Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long bkgrd tota
' Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1
Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date:. 2/16/01
Period: am m
Project ID: 0106
E/W St: Fossil Creek/Cameron
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year : recent short lon bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound
I L T R I L T R I L T R I L T R
No. Lanes 1 1 1 0 1 0 1 1 1 1 3 0 1 1
LGConfig I L TR I LT R 1 L TR I L
,Volume 140 10 25 165 10 350 150 1595 55 1185
Lane Width 112.0 12.0 1 12.0 12.0 112.0 12.0 112.0
RTOR Vol I 0 I 0 1 0 1
Duration 0.25
'Phase Combination
EB Left
Thru
Right
Peds
B Left
Thru
' Right
Peds
NB Right
'SB Right
Green
Yellow
111 Red
L'
A
A
A
X
A
A
X
31.0
3.0
2.0
Area
Type: All other
areas
Signal Operations -
3 4 1
I NB
Left
I
Thru
I
Right
I
Peds
I SB
Left
I
Thru
i
Right
I
Peds
I EB
Right
WB
Right
3 0
TR
930 30
12.0
0
5 6
7 8
A P
P
P
X
A P
P
P
X
A
8.0 50.0
0.0 4.0
0.0 2.0
Cycle Length: 100.0
secs
APPENDIX F
HCS2000: Unsignalized Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Agency/Co.:
p-*_ performed:
Analysis Time Period:
Intersection:
Jurisdiction:
'Analysis Year:
Project ID: 0106
East/West Street:
' North/South Street:
Michael
Matthew J. Delich, P.E.
2/221,Q1
am m
College/RT-in/RT-out
Fort Collins
(5> long ota1
RT-in/RT-out
College
Intersection Orientation: NS
Study period (hrs): 0.25
Vehicle
Volumes and Adjustments
Major Street: Approach
Northbound
Southbound
Movement 1
2 3 1 4
5
6
L
T R I L
T
R
' Volume
1705
20
Peak -Hour Factor, PHF
0.95
0.95
Hourly Flow Rate, HFR
1794
21
Percent Heavy Vehicles
Median Type Undivided
RT Channelized?
No
Lanes
2 1
Configuration
T R
Upstream Signal?
No
No
' Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
'Volume
Peak Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade M
Median Storage
Flared Approach: Exists?
Storage
'RT Channelized?
Lanes
Configuration
Approach
Movement
Lane Config
v (vph)
C(m) (vph)
'v/c
95% queue length
Control Delay
LOS
'Approach Delay
Approach LOS
0 0
1
R
15
0.95
15
2
RM
Delay, Queue Length, and Level of Service
NB SB Westbound Eastbound
1 4 1 7 8 9 I 10 11 12
1 I R
HCS2000: Unsignalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
9.9
A
751
0.02
0.06
9.9
A
II
HCS2000: Unsignalized•Intersections Release 4.1
TWO-WAY STOP CONTROL SUMMARY
'Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/22/01
Analysis Time Period: am pm
'Intersection: ollege/RT-in/RT-out
Jurisdiction: FOX= Collins
Analysis Year: short long total
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
' Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
' L T R I L T R
volume
feak-Hour Factor, PHF
ourly Flow Rate, HFRercent Heavy Vehicles
Median Type Undivided
RT Channelized?
'Lanes
Configuration
Upstream Signal? No
0.95 0.95
994 84
2 1
T R
No
No
' Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R I L T R
Volume 5
Peak Hour Factor, PHF 0.95
Hourly Flow Rate, HFR 5
'Percent Heavy Vehicles 2
Percent Grade M 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1
,Configuration R
Approach
Movement
Lane Config
,v (vph)
C (m) (vph)
v/c
95% queue length
,Control Delay
LOS
Approach Delay
Approach LOS
,Matthew J
Matthew J
Delay, Queue Length, and Level of Service
NB SB Westbound Eastbound
1 4 1 7 8 9 1 10 11 12
I 1 R
HCS2000: Unsignalized Intersections Release 4.1
Delich
Delich, P.E.
9.1
A
891
0.01
0.02
9.1
A
Appr/ Lane
Lane Group
Grp Capacity
'Eastbound
L 363
'TR 425
Westbound
_Intersection Performance Summary_
Adj Sat Ratios Lane Group
Flow Rate
(s) v/c g/C Delay LOS
1346 0.38 0.27 30.3 C
1636 0.14 0.26 28.5 C
LT 378
1453
0.14
R 712
1583
0.36
Northbound
L 363
1770
0.07
T 1734
3539
0.74
R 776
1583
0.07
Southbound
L 385
1770
0.85
T 2017
3539
0.72
R 902
1583
0.04
Intersection Delay = 18.4
0.26
28.6
C
0.45
18.3
B
0.57
9.9
A
0.49
18.8
B
0.49
13.7
B
0.64 42.1
0.57 11.3
0.57 9.5
(sec/veh)
Approach
Delay LOS
29.8 C
20.1 C
18.5 B
D
B 16.8 B
A
Intersection LOS = B
' HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061
E-Mail: mdelich@frii.com
Analyst:
'Agency/Co.:
Date Performed:
Analysis Time Period:
Intersection:
Area Type:
Jurisdiction:
Analysis Year:
Project ID: 0106
Fax:
OPERATIONAL ANALYSIS
Michael
Matthew J. Delich, P.E.
2/16/01
(970) 669-5034
am m
Col ege/Fossil Creek/Cameron
All other areas
Fort Col ns
recent shor long bkgrd tota
East/West Street
Fossil Creek/Cameron
North/South Street
College
11
HCS2000: Signalized Intersections Release 4.1
tAnalyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
'Period: am�
Project ID: 0106
E/W St: Fossil Creek/Cameron
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year : recent short long bkgr total
N/S St: College
1
SIGNALIZED INTERSECTION
SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound
1
'
I L
T R
I L T
R
I L
T R
I L T
R
No. Lanes
1 1
1 0
I 0 1
1
1 1
2 1
I 1 2
-1
1 1
LGConfig
I L
TR
I LT
R
I L
T R
I L T
R 1
Volume
1130
10 45
140 10
240
12.5,
1220 55
1310 1375
35 1
Lane Width
112.0
12.0
1 12.0
12.0
112.0
12.0 12.0
112.0 12.0
12.0 1
RTOR Vol
1
0
1
0
1
0
1
0 I
Duration
0.25
Area
Type: All
other
areas
Signal
Operations
Phase Combination
1 2
3 4
1
5
6
7 8
EB Left
A
1 NB
Left
A
P
Thru
A
1
Thru
P
Right
A
1
Right
P
'
Peds
X
I
Peds
X
WB Left
A
1 SB
Left
A
A
P
Thru
A
I
Thru
A
P
'
Right
A
I
Right
A
P
Peds
X
I
Peds
X
Right
I EB
Right
'NB
SB Right
I WB
Right
A
A
Green
26.0
6.0
8.0
49.0
Yellow
3.0
0.0
0.0
4.0
All Red
2.0
0.0
0.0
2.0
Cycle
Length:
100.0
secs
11
it
11
11
Appr/
Lane
Lane
Group
Grp
Capacity
IEastbound
L 389
'TR 483
Westbound
_Intersection Performance Summary_
Adj Sat Ratios Lane Group
Flow Rate__
(s) v/c g/C Delay LOS
Approach
Delay LOS
1297 0.11 0.30 25.4 C
1666 0.08 0.29 25.8 C 25.6 C
LT
413
1425
0.17
R
633
1583
0.53
Northbound
L
436
1770
0.12
T
1911
3539
0.72
R
855
1583
0.05
'Southbound
L
261
1770
0.64
T
1911
3539
0.42
R
855
1583
0.04
Intersection
Delay
= 15.0
0.29 26.7 C 24.2 C
0.40 23.7 C
0.61 8.5 • A
0.54 14.5 B 14.2 B
0.54 11.0 B
0.61 19.2 B
0.54 10.2 B 11.8 B
0.54 10.9 B
(sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Lone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
I_OPERATIONAL ANALYSIS
Analyst: Michael
Fgency/Co.: Matthew J. Delich, P.E.
ate Performed: 2/16/01
Analysis Time Period: m pm
Intersection: ollege/Fossil Creek/Cameron
!Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long bkgrd tota
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCs2000: Signalized Intersections Release 4.1
'Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
tPeriod: pm
Project D: 0106
E/W St: Fossil.Creek/Cameron
'No. Lanes
LGConfig
'Volume
Lane.Width
RTOR Vol
Duration
I Eastbound
I L T R
I 1 1 0
I L TR
140 10 25
112.0 12.0
1 0
.25
Phase Combination
i
EB Left
A
Thru
A
Right
A,
Peds
X
WB Left
A
Thru
A
Right
A
Peds
X
Right
'NB
SB Right
Green
29.0
Yellow
3.0
All Red
2.0
if
C
11
11
it
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Coll' s
Year : recent short long bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
d
Westbound
i Northbound
I SouE oun
L T
R
I L T
R
I L T
R
I 0 1
1
I 1 2
1
1 1 2
1
LT
R
I L T
R
I L T
R
155 10
320
150 1305
40
1160 760
30
1 12.0
12.0
112.0 12.0
12.0
112.0 12.0
12.0
I
0
1
0
1
0
Area Type: All other areas
Signal Operations_
2 3 4 I
NB Left
Thru
Right
i Peds
1 SB Left
Thru
Right
Peds
EB Right
WB Right
5 6
7 8
A P
P
P
A P
P
P
X
A
6.0 54.0
0.0 4.0
0.0 2.0
Cycle Length: 100.0
secs
11
APPENDIX E
Intersection Performance Summary
'Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 344
1322
0.22
0.26
29.3
C
TR 389
1621
0.10
0.24
29.7
C
29.4
C
'
Westbound
LT 334
1391
0.17
0.24
30.4
C
20.8
C
R 712
1583
0.41
0.45
18.9
B
Northbound
L 380
1770
0.01
0.59
8.4
A
TR 2476
5054
0.66
0.49
16.5
B
16.5
B
,Southbound
L 429
1770
0.87
0.67
45.1
D
TR 2995
5076
0.59
0.59
8.0
A
14.5
B
Intersection Delav
= 16.2
(sec/veh)
Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
,Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
'Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Fgency/Co.: Matthew J. Delich, P.E.
ate Performed: 2/16 O1
Analysis Time Period: a pm
�ntersection: Co ege/Fossil Creek/Cameron
rea Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long bkgrd total
troject ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1
Analyst: Michael Inter.: College/Fossil Creek/Cameron
gency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 2/16 O1 Jurisd: Fort Collins
'Period: am Year recent short ong bkgrd total
Project ID: 0106
E/W St: Fossil Creek/Cameron N/S St: College
SIGNALIZED INTERSECTION SUMMARY
-IEastbound I Westbound I Northbound I Southbound I
I L T R I L T R I L T R I L T R I
I I _I __ I_ I
ko. Lanes 1 1 1 0 i 0 1 1 1 1 3 0 I 1 3 0 I
LGConfig I L TR I LT R I L TR I L TR I
Lolume 170 5 30 150 5 275 15 1495 65 1355 1665 20 I
ane Width 112.0 12.0 I 12.0 12.0 112.0 12.0 112.0 12.0 I
RTOR Vol 1 0 I 0 1 0 1 0 I
Duration 0.25
Area
Type: All other
areas
Signal Operations_
Combination
1 2
3 4 1
,Phase
EB Left
A
I NB
Left
Thru
A
I
Thru
Right
A
I
Right
Peds
kB
X
I
Peds
Left
A
I SB
Left
Thru
A
I
Thru
Right
A
I
Right
Peds
X
I
Peds
NB Right
I EB
Right
'SB Right
I WB
Right
Green
24.0
Yellow
3.0
,All Red
2.0
5 6
7 8
A
P
P
P
X
A A
P
A
P
A
P
X
A A
6.0 10.0 49.0
0.0 0.0 4.0
0.0 0.0 2.0
Cycle Length: 100.0
secs
Intersection Performance Summary
'Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 413
1291
0.03
0.32
23.3
C
' TR 518
1671
0.03
0.31
24.1
C
23.8
C
Westbound
LT 435
1402
0.17
0.31
25.3
C
21.9
C
R 697
1583
0.53
0.44
21.2
C
Northbound
'L 384
1770
0.07
0.59
9.1
A
TR 2530
5060
0.69
0.50
16.1
B
16.0
B
Southbound
L 269
1770
0.72
0.59
30.0
C
TR 2521
5042
0.41
0.50
12.5
B
15.3
B
Intersection Delay
= 16.6
(sec/veh)
Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16/01
Analysis Time Period: �pm
Intersection: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long bkgrd total
' Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
' HCS2000: Signalized Intersections Release 4.1
Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
Period: pm
Project D: 0106
E/W St: Fossil Creek/Cameron
No. Lanes
LGConfig
Volume
Lane Width
RTOR Vol
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year : recent short lon bkgr total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
1 Eastbound I Westbound 1 Northbound
I L T R I L T R I L T R
1 1 1 0 1 0 1 1 1 1 3 0
1 L TR I LT R I L TR
110 5 10 165 5 350 125 1595 55
112.0 12.0 1 12.0 12.0 112.0 12.0
1 0 I 0 1 0
Duration 0.25
uomninazion
i
,enase
EB Left
A
Thru
A
Right
A
Peds
X
WB Left
A
Thru
A
Right
A
Peds
X
NB Right
'SB Right
Green
31.0
Yellow
3.0
All Red
2.0
Area Type: All other areas
Signal Operations_
2 �3 4 1
1 NB Left
1 Thru
1 Right
Peds
1 SB Left
1 Thru
1 Right
1 Peds
1 EB Right
1 WB Right
1 Southbound
1 L T R
I
I 1 3 0
L TR
1185 925 55
112.0 12.0
1 0
5 6
7 8
A P
P
P
X
A P
P
P
X
A
8.0 50.0
0.0 4.0
0.0 2.0
Cycle Length: 100.0
secs
APPENDIX D
II
'Appr/ Lane
Lane Group
Grp Capacity
_Intersection Performance Summary_
Adj Sat Ratios Lane Group
Flow Rate
(s) v/c g/C Delay LOS
Eastbound
L 365 1353
' TR 421 1621
Westbound
0.20 0.27
0.09 0.26
LT
374
1439
0.13
R
712
1583
0.36
Northbound
L
367
1770
0.01
T
1734
3539
0.74
R
776
1583
0.07
ISouthbound
L
385
1770
0.85
T
2017
3539
0.71
R
902
1583
0.02
'
Intersection
Delay
= 18.1
28.5 C
28.1 C
Approach
Delay LOS
28.3 C
0.26
28.5
C 19.9
B
0.45
18.3
B
0.57
9.7
A
0.49
18.8
B 18.6
B
0.49
13.7
B
0.64
42.1
D
0.57
11.2
B 16.8
B
0.57
9.4
A
(sec/veh)
Intersection
LOS = B
' HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
'Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
' Phone: (970) 669-2061
E-Mail: mdelich@frii.com
■
Analyst:
'Agency/Co.:
Date Performed:
Analysis Time Period:
Intersection:
'Area Type:
Jurisdiction:
Analysis Year:
Project ID: 0106
II
it
Fax: (970) 669-5034
OPERATIONAL ANALYSIS
Michael
Matthew J. Delich, P.E.
2/16/01
o ege/Fossil Creek/Cameron
All other areas
Fort Collins
recent hort long kgrd total
East/West Street
Fossil Creek/Cameron
North/South Street
College
' HCS2000: Signalized Intersections Release 4.1
'Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
'Period: am m
Project ID: 0106
E/W St: Fossil Creek/Cameron
' No. Lanes
LGConfig
'Volume
Lane Width
RTOR Vol
Eastbound
I L T R
1 1 1 0
L TR
170 5 30
112.0 12.0
1 0
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Coll' s
Year : recent short long kgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
Westbound
i Northbound
I Southbound
L T R
I L T
R
I L T
R
1 1 2
1
1 0 1 1
1 1 2
1
LT R
I L T
R
I L T
R
140 5 240
15 1220
55
1310 1360
20
1 12.0 12.0
112.0 12.0
12.0
112.0 12.0
12.0
I 0
1
0
1
0
' Duration 0.25
Area
Type: All other
areas
Signal Operations_
Phase Combination
1 2
3 4 1
EB Left
A
1 NB
Left
Thru
A
I
Thru
Right
A
1
Right
Peds
X
1
Peds
WB Left
A
I SB
Left
Thru
A
I
Thru
' Right
A
1
Right
Peds
X
1
Peds
NB Right
1 EB
Right
'SB Right
I WB
Right
Green
26.0
Yellow
3.0
' All Red
2.0
5 6
7 8
A
P
P
P
X
A A
P
A
P
A
P
X
A A
6.0 8.0 49.0
0.0 0.0 4.0
0.0 0.0 2.0
Cycle Length: 100.0
secs
'Appr/ Lane
Lane Group
Grp Capacity
'Eastbound
L 396
'TR 485
Westbound
_Intersection Performance Summary_
Adj Sat Ratios Lane Group
Flow Rate _
(s) v/c g/C Delay LOS
1321 0.03 0.30 24.7 C
1671 0.03 0.29 25.5 C
'LT
412
1421
0.15
R
633
1583
0.53
Northbound
L
437
1770
0.06
T
1911
3539
0.72
R
855
1583
0.05
ISouthbound
L
261
1770
0.64
T
1911
3539
0.42
R
855
1583
0.07
,
Intersection
Delay
= 14.8
Approach
Delay LOS
25.2 C
0.29
26.5
C 24.2
C
0.40
23.7
C
0.61
8.2
A
0.54
14.5
B 14.3
B
0.54
11.0
B
0.61
19.2
B
0.54
10.2
B 11.7
B
0.54
11.1
B
(sec/veh)
Intersection
LOS = B
1 HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
'Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
t
Phone: (970) 669-2061
Fax: (970) 669-5034
E-Mail: mdelich@frii.com
_
'
OPERATIONAL ANALYSIS
Analyst:
Michael
Matthew J. Delich, P.E.
'Agency/Co.:
Date Performed:
2 16/01
Analysis Time Period:
am m
Intersection:
ollege/Fossil Creek/Cameron
�rea Type:
All other areas
Jurisdiction:
Analysis Year:
Fort Coll" s
recent hort long bkgr total
,Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1
Michael
Inter.: College/Fossil Creek/Cameron
'Analyst:
Agency: Matthew J.
Delich,
P.E. Area Type: All other areas
Date: 2/16/01
Period- am pm
Jurisd: Fort Collins
Year recent or long kgr total
' Project ID: 0106
E/W St: Fossil. Creek/Cameron
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
► Eastbound
I Westbound ► Northbound ► Southbound I
L
T R
I L T R I L T R I L T R I
'No. Lanes I 1
1 0 1 1 1 1 2 1 I 1 2 1 1
1 0
LGConfig I L
TR
I LT R I L T R I L T R I
110
5 10
155 5 320 125 1305 40. 1160 755 55 1
'Volume
Lane Width 112.0
12.0
( 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 1
RTOR Vol 1
0
I 0. I 0 I 0
'Duration
0.25
Area
Type: All other areas
Signal Operations
Phase Combination
1 2
3 4 1 5 6 7 8
,EB
Left
A
I NB Left A P
Thru
A
I Thru P
Right
A
I Right P
'
Peds
X
I Peds X
WB Left
A
I SB Left A P
Thru
A
I Thru P
' Right
A
I Right P
Peds
X
I Peds X
NB Right.
I EB Right
Right
I WB Right A
'SB
Green
29.0
6.0 54.0
Yellow
3.0
0.0 ,4.0
Red
2.0
0.0 2.0
'All
Cycle Length: 100.0 secs
11
11
APPENDIX C
UNSIGNALIZED INTERSECTIONS
SIGNALIZED INTERSECTIONS
Average TotalDelayserivell_<
10>
m
10 and < 20>
20 and _< 35.>
35 and _< 55>
55 and _< 80>80
Intersection Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 119
1297
0.33
0.09
62.0
E
TR 137
1627
0.14
0.08
60.7
E
61.6
E
Westbound
LT 114
1350
0.30
0.08
62.5
E
52.0
D
R 346
1583
0.15
0.22
45.1
D
Northbound
L 456
1770
0.00
0.85
1.8
A
T 2617
3539
0.48
0.74
1.1
A
1.3
A
R 1171
1583
0.04
0.74
5.1
A
Southbound
L 493
1770
0.17
0.85
2.1
A
T 2617
3539
0.54
0.74
1.3
A
1.4
A
R 1171
1583
0.01
0.74
4.9
A
Intersection Delay
= 4.0
(sec/veh)
Intersection
LOS = A
' HCS2000:
Signalized Intersections Release 4.1
Matthew J. Delich
'Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061
Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
2/16/01
Analysis Time Period:
am
Intersection:
College/Fossil Creek/Cameron
Area Type:
All other areas
Jurisdiction:
Fort Collins
Year:
ecen short long bkgrd total
,Analysis
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
1
HCS2000: Signalized Intersections Release 4.1
Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
UPPeriod: am a)
roject ID: 0106
E/W St: Fossil Creek/Cameron
Inter.:'College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year ecent short long bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound b d I Northbound I Southbound
I L T R
I
No. Lanes
LGConfig I L TR
(Volume 137 3
Lane Width 112.0 12.0
RTOR Vol I
Duration 0.25
c:omnination
i
�Phase
EB Left
A
Thru
A
Right
A
Peds
X
WB Left
A
Thru
A
'
Right
A
Peds
X
NB Right
SB Right
Green
12.0
Yellow
3.0
All Red
2.0
11
It
If
R]
15
,3
West oun
L T R
I L T
R
I L T
R
1 1 2
1
I 1 2
1
1 0 1 1
LT R
I L T
R
I L T
R
130 2 49
12 1197
49
179 1332
10
1 12.0 12.0
112.0 12.0
12.0
112.0 12.0
12.0
I 0
1
0
1
0
Area Type: All other
areas
Signal Operations_
2 3 4 I
NB
Left
Thru
1
Right
1
Peds
SB
Left
Thru
Right
Peds
EB
Right
1 WB
Right
5 6
7 8
A P
P
P
X
A P
P
P
X
A
14.0 105.0
0.0 4.0
0.0 2.0
Cycle Length: 142.0
secs
11
Appr/ Lane
Lane Group
Grp Capacity
_Intersection Performance Summary_
Adj Sat Ratios Lane Group
Flow Rate
(s) v/c g/C Delay LOS
Approach
Delay LOS
Eastbound
L 110 1206 0.04 0.09 58.9 E
rTR 134 1583 0.04 0.08 59.9 E 59.5 E
Westbound
'LT
115
1365
0.35
R.
346
1583
0.26
Northbound
rL
666
1770
0.01
T
2617
3539
0.51
R
1171
1583
0.03
ISouthbound
L
470
1770
0.09
T
2617
3539
0.30
R
1171
1583
0.02
1
Intersection
Delay
= 4.2
0.08
63.1
E 51.5 D
0.22
46.4
D
0.85
1.8
A
0.74
1.2
A 1.3 A
0.74
5.0
A
0.85 2.0
0.74 0.7
0.74 4.9
(sec/veh)
A
A 0.9 A
A
Intersection LOS = A
rHCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
rMatthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Lone: (970) 669-2061 Fax:
E-Mail: mdelich@frii.com
IOPERATIONAL ANALYSIS
(970) 669-5034
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
,Date Performed:
2/16/01
Analysis Time Period:
(g)pm.
Intersection:
College/Fossil Creek/Cameron
,Area Type:
All other areas
Jurisdiction:
Fo Collins
Analysis Year:
recent short long bkgrd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
r
11
HCS2000: Signalized Intersections Release 4.1
1 Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
Period: 051t>
' pm
I D• Project 0106
E/W St: Fossil Creek/Cameron
No. Lanes
LGConfig
1 Volume
Lane Width
RTOR Vol
tDuration
Eastbound
L T R
I 1 1
L TR
14 0
112.0 12.0
1
0.25
Phase Combination
1
EB Left
A
Thru
A
Right
A
Peds
X
WB Left
A
Thru
A
'
Right
A
Peds
X
NB Right
SB Right
Green
12.0
Yellow
3.0
' All Red
2.0
If
11
C
0
N
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year recen short long bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
Westbound I Northbound
L T R I L T R
I 1
1 0 1 1 1 1 2 1
LT R 1 L T R
136 2 86 19 1277 37
12.0 12.0 112.0 12.0 12.0
I 0 I 0
Area Type: All other areas
Signal Operations_
2 3 4 I
1 NB Left
Thru
1 Right
1 Peds
SB Left
1 Thru
Right
1 Peds
1 EB Right
1 WB Right
Southbound
L T R
I
1 2 1
L T R
142 739 24
112.0 12.0 12.0
1 0
5 6
7 8
A P
P
P
X
A P
P
P
X
A
14.0 105.0
0.0 4.0
0.0 2.0
Cycle Length: 142.0
secs
11
APPENDIX B
1
i
1
1
1
i
1
= M M M M M M M m M M 1111110 M M = M M m M
MATTHEW J. DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND, CO-80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 2-7-01 Observer: Michael
Day: Wednesday City: Fort Collins
R = right turn Intersection: US287IFosell CreeldCafneron
S = straight
I = loft film
Time
Northbound: US287
Southbound: US287
Total
Eastbound: Cameron
Westbound: Fossil Creek
Total
Total
—LTS
FR
Total
L
S
R
Total
L
S
R
Total
L
S
R
Total
Begins
northisouth
east1west
All
7:30
0
1281
1 8
p
12
175
3
t
479
0
0
3
711-14
12
0
18
30
33
512
7:45
1
332
3
'Nil
5
167
5
tw all,
513
0
1
8
1
26
11 w
8:00
3
376
8
13
209
10
aw-RIO, 1Z
619
0�
0
1
2
0
27
30
649
8:15
5
288
18
W
12
188
6
of
517
517
3
0
1
21111111 1 . -
14
7:304:30
1�
1323Ly
805
2128
10
124
34
2262
s.
PHF
0.85
0.87
0.63
-0.89
4:30
1
263
13
g,
17,1285
1 3
f
582
8
1
4
11
1
19
826
11, MCI,
,
4:45
1
321
10
Al
EDP
25
342
5
INV
704
5
1
5
V'H
gti
7
0
13
31
735
A fA
5:00
0
325
15
20
373
1
11
734
15
1
3
1 ffi§00
7.
1
9
36
7.70
5:15
0
288
11
5'
17
332
1
'6
649
9
0
3
VR
5
0
8
3'
25
674
4:30-5:30
0
1248
1 1 �
t"k
ZA
1421
2669
55
81
136
2805
PHFJ
1 0.92
0.9
0.72
Lid
APPENDIX A
IV. CONCLUSIONS
This study assessed the impacts of the Redtail PDP development on
the short range and long range street system in the vicinity of the
proposed development. As a result of this analysis, the following is
concluded:
The development of the Redtail PDP is feasible from a traffic
engineering standpoint. At full development, the Redtail PDP will
generate approximately 1134 daily trip ends, 128 morning peak hour
trip ends, and 138 afternoon peak hour trip ends.
Current operation at the College/Fossil Creek/Cameron intersection
is acceptable. Acceptable operation at signalized intersections
during the peak hours is defined as level of service D or better.
It is expected that no additional traffic signals will be
warranted, due to the existing signal at the College/Fossil
Creek/Cameron intersection.
- In the short range future, given full development of the Redtail
PDP and an increase in background traffic, the College/Fossil
Creek/Cameron and College/RT-in/RT-out intersections will operate
acceptably.
- In the long range future, given full development of the Redtail
PDP, the College/Fossil Creek/Cameron and College/RT-in/RT-out
intersections will operate acceptably during the peak hours. The
' short range and long range geometry is shown in Figures 10 and 11,
respectively.
- Acceptable level of service is achieved for bicycle and transit
modes based upon the measures in the multi -modal transportation
guidelines. With. regard to pedestrian level of service, gaps in
the sidewalk system should be filled in by adjacent property
■ owners.
21
commercial area north of the site, the commercial/office area
northeast of the site, and the residential area (Fossil Creek) east of
the site. This site is in an area type termed "transit corridor" and
"other." The level of service determination assumes that future
developments will build their streets in accordance with Fort Collins
Standards. This being the case, pedestrian facilities will exist
adjacent to vacant property. This is a reasonable assumption. The
sidewalk system in the area along Fossil Creek was never developed.
The Pedestrian LOS Worksheet is provided in Appendix G. The minimum
level of service for "transit corridor" is B for all categories,
except for the visual interest & amenities category where it is LOS C.
The minimum level of service for "other" is C for all measured
categories. The primary concern with regard to pedestrian level of
service is the discontinuity of the sidewalk system. Much of the area
was developed in Larimer County, and as such, sidewalks were neither
required nor built. It is incumbent upon the adjacent property owner
to build sidewalks where they do not currently exist.
Bicycle Level of Service
' Based upon Fort Collins bicycle LOS criteria, there are no
destination areas within 1320 feet of the Redtail PDP. The Bicycle LOS
Worksheet is provided in Appendix G, which indicates that the base
connectivity is acceptable at level of service C.
Transit Level of Service
Currently, there is limited transit service in the area. In the
future, transit service will be improved. In the future, there will
be 20 minute transit service on College Avenue. It is anticipated
that the level of service will be in the D category with
implementation of the City's Transit Development Plan. A future
transit level of service worksheet is provided in Appendix G.
20
Carr
:,reek
-.a-- - Denotes Lane
LONG RANGE (2020) GEOMETRY
pw
Figure 11
19
Carr
Creek
. — - Denotes Lane
SHORT RANGE (2005) GEOMETRY
N
Figure 10
18
TABLE 5
Short Range Total Peak Hour Operation
y
.iceNOW
T
lV
kp�
...d
Ss'1
FiF Nn G
B
B
College/Fossil Creek/Cameron
OVERALL
(signal)
College/RT-in/RT-out
EB RT
A
A
(stop sign)
TABLE 6
Long Range Total Peak Hour Operation
College/Fossil Creek/Cameron OVERALL B B
(signal)
College/RT-in/RT-out EB RT A A
(stop sign)
17
' Using the traffic volumes shown in Figure 8 and the recommended
geometrics, the College/Fossil Creek/Cameron and College/RT-in/RT-out
intersections operate in the short range total condition as indicated
in Table 5. Calculation forms for these analyses are provided in
Appendix E. The key intersections will operate acceptably.
' Using the traffic volumes shown in Figure 9 and recommended
geometrics, the College/Fossil Creek/Cameron and College/RT-in/RT-out
intersections operate in the long range total condition as indicated
in Table 6. Calculation forms for these analyses are provided in
Appendix F. The key intersections will operate acceptably.
The short range and long range geometry is shown in Figures 10 and
11, respectively. The existing cross section of College Avenue is wide
enough to provide for 2 through lanes in each direction, a center median
for designated left -turn lanes, and a wide shoulder that is striped with
right -turn auxiliary lanes at appropriate locations. It is classified
as an NR-A Highway. Using the State Highway Access Code (1998) as the
reference, the right -turn auxiliary lanes should be 500 feet long
including a bay taper at 15:1. The left -turn lanes must also provide
for this same deceleration length plus the ability to store potential
left -turn queues. In the short range future, the northbound storage
length is 50 feet and the southbound storage length is 300 feet. A
northbound right -turn acceleration lane is required for traffic entering
College Avenue from westbound Fossil Creek Parkway. This lane already
exists and would not be the responsibility of the Redtail PDP. The
southbound storage length is required due to the forecasted traffic with
the connection of Fossil Creek Parkway between College Avenue and Lemay
Avenue. Once this connection is made, actual traffic counts should be
used to determine the southbound left -turn storage length. -There is a
significant north to south decreasing grade on College Avenue north of
the College/Fossil Creek/Cameron intersection. Adjustments to the
deceleration length should be made, as appropriate. In the long range
future, the Fort Collins Master Street Plan indicates that College
Avenue has three through lanes in each direction. The right -turning
volumes are not high enough to require separate right -turn lanes at the
College/Fossil Creek/Cameron or College/RT-in/RT-out intersections with
the six -lane cross section. The left -turn storage lengths described
earlier are sufficient in the long range future. Since there is enough
width on Cameron Drive, it is recommended in both the short range and
long range futures that an eastbound left -turn lane and a through/right-
turn lane be striped on Cameron Drive. The westbound geometry on Fossil
Creek Parkway can remain as it exists currently.
Pedestrian Level of Service
Appendix G shows a map of the area that i
s
TABLE 3
Short Range Background Peak Hour Operation
J
r y Y�
IIM-
nd
MINIM Ylh'K:'sI
9 a ..... r• !4
R �i n+ F Y
+
„�'.
..
.. ,. �v� l`v"+, .n
B B
College/Fossil Creek/Cameron
OVERALL
(signal)
TABLE 4 I
Long Range Background Peak Hour Operation
College/Fossil Creek/Cameron I OVERALL I B I B
(signal)
15
to
LO
O
N
O O
N �
O �-
O
JI
RT-in/RT-out 5/15
0
0 LO
co
to M
350/275
o a �
It° °'
+ 10/10
65/50
Cameron
40/130
10/10
25/45
Ul) to LO
o v QQ
to to
LO
0
AM/PM
Rounded to Nearest
5 Vehicles
LONG RANGE (2020) TOTAL
PEAK HOUR TRAFFIC
Fossil Creek
N
Figure 9
14
L0
O
ti
O
N Lf)
09
O
JI
RT-in/RT-out 5/15
r� O
� � M
320/240
o
10/10
55/40
Can
40/130
1
10/10 —y
25/45
uO O ,n
o N o
LO v
LO
M
AM/PM
Rounded to Nearest
5 Vehicles
SHORT RANGE (2005) TOTAL
PEAK HOUR TRAFFIC
Fossil Creek
n
d
Figure 8
13
Carr
m
E,
reek
Fil k Ti a MA
SITE GENERATED PEAK HOUR TRAFFIC
N
Figure 7
12
Cameron
d
0
coLO
o°U*)
N � 350/275
Un rn �— 5/5
65/50
10/70
5/5 —w-- LO U") LO
10/30 N v Ul)
LO
Ln
to
AM/PM
Rounded to Nearest
5 Vehicles
LONG RANGE (2020) BACKGROUND
PEAK HOUR TRAFFIC
Fossil Creek
N
Figure 6
11
Cameron
0
0
Coo
O M
320/240
5/5
J j � ,— 55/40
1WO --)� t T
5/5 —� �n o LO
10/30 N NLO
o
0
M
T-
AM/PM
Rounded to Nearest
5 Vehicles
SHORT RANGE (2005) BACKGROUND
PEAK HOUR TRAFFIC
Fossil Creek
AhL
Figure 5
10
Background Traffic Projections
Figures 5 and 6 show the respective short range and long range
background traffic projections. Background traffic projections for the
short range and long range future horizons were obtained by contacting
Fort Collins Transportation Planning Staff and reviewing the Huntington
Hills Apartments traffic study prepared for this area of Fort Collins.
The peak hour traffic was increased to reflect the connection of Fossil
Creek Parkway between College Avenue and Lemay Avenue. In addition,
there are five office buildings on Coronado Court that were approved a
number of years ago within the Fossil Creek Office Park, but have not
yet been built. The background traffic includes the generated traffic
from these yet unbuilt office buildings.
Trip Assignment
Trip assignment is how the generated and distributed trips are
expected to be loaded on the street system. The assigned trips are the
resultant of the trip distribution process. Figure 7 shows the site
generated peak hour traffic assignment. Figure 8 shows the total (site
plus background) short range peak hour traffic at the key intersections.
Figure 9 shows the total long range morning and afternoon peak hour
traffic at the key intersections. It should be noted, due to the right-
in/right-out access to College Avenue, a portion of the existing Fossil
Creek Office Park traffic will utilize this access.
Signal Warrants
As a matter of policy, traffic signals are not installed at any
location unless warrants are met according to the Manual on Uniform
Traffic Control Devices. Signal warrant analyses were not required due
to the existing signal at the College/Fossil Creek/Cameron intersection.
operation Analysis
Capacity analyses were performed at the College/Fossil Creek/
' Cameron and College/RT-in/RT-out intersections. The operations analyses
were conducted for the short range analysis, reflecting a year 2005
condition. The long range analysis reflects a year 2020 condition.
Using the traffic volumes shown in Figure 5, the College/Fossil
Creek/Cameron intersection operates in the short range background
condition as indicated in Table 3. Calculation forms for these analyses
are provided in Appendix C. The key intersection will operate
acceptably during the peak hours.
I ' Using the traffic volumes shown in Figure 6, the College/Fossil
Creek/Cameron intersection operates in the long range background
condition as indicated in Table 4. Calculation forms for these analyses
' are provided in Appendix D. The key intersection will operate
acceptably during the peak hours.
' 9
0
�o
Site
U
I I
ICameron
L_-J
0
M
OFFICE
LO
cm
I o
Site
I I U
ICameron
L__J
0
0
M
TRIP DISTRIBUTION
5%
----------
Fossil Creek
_ 5%Am—
_
Fossil Creek
RESIDENTIAL
IM
N
Figure 4
8
1
' SITE PLAN
1
[► OM-147_ 4:4
N
CREEK
WAY
Figure 3
III. PROPOSED DEVELOPMENT
The Redtail. PDP is an office and residential development, located
west of College Avenue near the existing Cameron Park and developing
Fossil Creek Office Park in Fort Collins. Figure 3 shows a site plan of
the Redtail PDP. The site plan shows primary access via the
College/Fossil Creek/Cameron intersection. Right-in/right-out access is
also shown at a location approximately 725 feet north of the
College/Fossil Creek/Cameron intersection. This is the existing access
to the Mill Brothers Nursery property. This access is shown on the
adopted "South College Avenue Access Control Study/Plan," 1988. This
access is also shown on the "South College Avenue Access Control Plan
Update" which is currently going through the public review process.
The short range analysis (Year 2005) includes development of the Redtail
PDP and an appropriate increase in background traffic. The long range
analysis year is considered to be 2020.
Trip Generation
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street system. A
compilation of trip generation information contained in Trip Generation,
6`" Edition, ITE was used to estimate trips that would be generated by
the proposed/expected uses at this site. The proposal is for eight
office buildings of 7,000 square feet each, eight apartment buildings
with eight units in each, and two apartment buildings with seven units
in each. Table 2 shows the expected trip generation on a daily and peak
hour basis.
TABLE 2
Trip Generation
WIN
710
Office
56.0 KSF
11.01 617
1.37 77 0.19 11
0.25
14 1.24 75
220
Apartment
78 D.U.
6.63
517
0.08
6
0.43 34
0.42
33
0.20
16
Total
1134
83
45
47
91
Trip Distribution
Directional distribution of the generated trips was determined for
the Redtail PDP based upon the distribution of the existing traffic
volumes and the location of trip productions for these types of land
uses. Figure 4 shows the trip distributions used for both the office
and residential uses.
C
Existing Operation
The College/Fossil Creek/Cameron intersection was evaluated using
techniques provided in the 2000 Highway Capacity Manual. The peak hour
operation is shown in Table 1. Calculation forms are provided in
Appendix B. A description of level of service for signalized and
unsignalized intersections from the 2000 Highway Capacity Manual is also
provided in Appendix B. The key intersection operates acceptably during
both the morning and afternoon peak hours. Acceptable operation at
signalized intersections during the peak hours is defined as level of
service D or better. Experience indicates that if level of service D
can be achieved during the peak hours, operation will be at level of
service C or better for 20-22 hours of an average weekday.
TABLE 7
Current Peak Hour Operation
«MW
College/Fossil Creek/Cameron
OVERALL
A A
(signal)
Pedestrian Facilities
Pedestrian facilities in this area are sporadic. Sidewalks exist
in the developing Fossil Creek Office Park. Sidewalks also exist
adjacent to the commercial/office uses north and northeast of the
site. There are no sidewalks along Fossil Creek Parkway or on Cameron
Drive, within Cameron Park. This site is within 1320 feet of:
existing residential areas east of the site _ and existing
commercial/office uses east, north, and northeast of the site. While
there are residential uses to the west, within 1320 feet of this site,
they are not accessible due to the railroad tracks.
Bicycle Facilities
There are bicycle facilities along College Avenue. Along Fossil
Creek Parkway bike lanes are not striped, however there is sufficient
width for bicycles to operate safely. There are no bike lanes on
Cameron Drive, since it is a local street.
Transit Facilities
The Fox Trot is within
College Avenue from Harmony
provides year-round service
7:00pm.
1320 feet of this site. It operates along
Road, south into Loveland. The Fox Trot
on 60 minute headways between 6:15am and
5
N
cm
0
U
N
M
O � O
\
— 86/49
IVM N
IN fl- v
--w-2/2 36/30
Cameron
4/37 —J'
Fossil Creek
1
0/3 —►
I("
rn v
6/15
ti
M
ti
N
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 2
4
N
0
U
Harmon
Redtail DP
E
J
Cameron
T
m°
r
04
N
co
Trilby
11 SCALE: 1"=2000'
SITE LOCATION Figure 1
11 3
II. EXISTING CONDITIONS
The location of the Redtail PDP is shown in Figure 1. It is
important that a thorough understanding of the existing conditions be.
presented.
Land Use
Land uses in the area are primarily commercial/office and
residential. Commercial/office uses exist adjacent to the site, to the
north, and to the.northeast across College Avenue. Residential uses
exist east of the site across College Avenue. The center of Fort
Collins lies to the north of the Redtail PDP.
Roads
The primary streets near the Redtail PDP site are College Avenue,
Fossil Creek Parkway, and Cameron Drive. College Avenue is to the east
of the Redtail PDP. It is a north -south street designated as an
arterial in the Fort Collins Master Street Plan. In this area, College
Avenue has a four -lane cross section with a center left -turn median and
right -turn auxiliary lanes. There are northbound/southbound left -turn
lanes and a northbound/southbound right -turn lanes on College Avenue,
approaching Fossil Creek Parkway and Cameron Drive. The existing speed
limit in this area is 50 mph. The College/Fossil Creek/Cameron
intersection has signal control
Fossil Creek Parkway is east of the Redtail PDP. It is an east -
west street designated as a collector on the Fort Collins Master Street
Plan. Currently, it is has a two-lane cross section with a wide raised
center median. The westbound approach to College Avenue has a left-
turn/through lane and a right -turn lane. Fossil Creek Parkway lines up
with Cameron Drive, which is west of College Avenue. By/before the
short range (2005) future, it is expected that Fossil Creek Parkway will
be extended east, to Lemay Avenue.
Cameron Drive is west of the Redtail PDP and will serve as an
access to the site. Cameron Drive is an east -west street designated as
a local street on the Fort Collins Master Street Plan. In this area,
Cameron Drive has a two-lane cross section. The eastbound approach to
College Avenue has a left -turn lane and a through/right-turn lane.
These lanes are not striped, however they function as mentioned above.
There is an unnamed frontage road just (251) west of College Avenue.
This road will serve the office portion of the Redtail PDP.
Existing Traffic
Recent peak hour counts at the College/Fossil Creek/Cameron
intersection are shown in Figure 2. Raw traffic count data is provided
in Appendix A. The traffic data at the College/Fossil Creek/Cameron
intersection was collected in February 2001.
2
I. INTRODUCTION
This transportation impact study addresses the capacity,
geometric, and control requirements at and near the proposed development
known as the Redtail PDP. The Redtail PDP is located west of College
Avenue near the existing Cameron Park in Fort Collins, Colorado.
Cameron Park is an established office park that is on both sides of
Cameron Drive. There are signs indicating the developing Fossil Creek
Office Park located just north of Cameron Park.
During the course of the analysis, numerous contacts were made
with the project planning consultant (VF Ripley Associates), the project
developer (Lagunitas Companies), the Fort Collins Transportation
Planning Staff, and the Fort Collins Traffic Engineering Staff. This
study generally conforms to the format set forth in the Fort Collins
transportation impact study guidelines. The study involved the
following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key
intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and
transit modes of transportation.
1
LIST OF FIGURES
Figure
Page
1.
Site
Location ........................................
3
2.
Recent
Peak
Hour Traffic .............................
4
3.
Site
Plan ............................................
7
4.
Trip
Distribution
....................................
8
5.
Short
Range
(2005)
Background Peak Hour Traffic ......
10
6.
Long
Range
(2020)
Background Peak Hour Traffic .......
11
7.
Site
Generated Peak Hour Traffic .....................
12
8.
Short Range
(2005)
Total Peak Hour Traffic ...........
13
9.
Long
Range
(2020)
Total Peak -Hour Traffic ............
14.
10.
Short Range
(2005)
Geometry ..........................
18
11.
Long
Range
(2020)
Geometry ...........................
19
APPENDIX
A Recent Peak Hour Traffic
B Current Peak Hour operation/Level of Service Descriptions
C Short Range Background Traffic Operation
D Long Range Background Traffic operation
E Short Range Total Traffic Operation
F Long Range Total Traffic Operation
G Pedestrian/Bicycle/Transit Level of Service Worksheets
TABLE OF CONTENTS
Page
I. Introduction ......................................... 1
II. Existing Conditions .................................. 2
LandUse ............................................. 2
Roads................................................ 2
Existing Traffic ..................................... 2
ExistingOperation ................................... 5
Pedestrian Facilities ................................ 5
Bicycle Facilities ................................... 5
Transit Facilities ................................... 5
III. Proposed Development ................................. 6
Trip Generation ...................................... 6
Trip Distribution .................................... 6
Background Traffic Projections ....................... 9
TripAssignment ...................................... 9
SignalWarrants ...................................... 9
Operation Analysis ................................... 9
Pedestrian Level of Service .......................... 16
Bicycle Level of Service ............................. 20
Transit Level of Service ............................. 20
Iv. Conclusions .......................................... 21
LIST OF TABLES
Table
Page
1.
Current Peak Hour Operation ..........................
5
2.
Trip Generation ......................................
6
3.
Short Range Background Traffic
Peak Hour Operation ...
15
4.
Long Range Background Traffic
Peak Hour Operation ....
15
5.
Short Range Total Traffic Peak
Hour Operation ........
17
6.
Long Range Total Traffic Peak
Hour Operation .........
17
REDTAIL PDP
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
FEBRUARY 2001
Prepared for:
Lagunitas Companies
3950 JFK Parkway, Bldg. 12
Fort Collins, CO 80525
Prepared by:
MATTHEW J. DELICH, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034