9. 050102: Sheet 6 — It appears that you need an easement for the riprap and drainage on the west
side of Timberline as well as a temporary construction easement.
Response: The interim drainage is designed to stay within the existing ROW. The soil riprap can
be placed without leaving the ROW. The ultimate drainage design will be directed
into inlets within the street and conveyed to existing storm systems. Therefore, the
ultimate design stays within the ultimate ROW.
10. 050102: Sheet 7,8 — See redlines for correction to the Crosswalk Markings Note. If there is a
study required, then it should be required now, not after the plans are approved.
Response: The crosswalk note was corrected per the redlines.
Thank you for your review and approval of these plans and responses. If you need further
clarification on any of the above responses, please call me (419-1316) at your convenience.
Sincerely,
Nolte Associates, Inc.
Thomas Ochwat, P.E.
Senior Engineer
NOLTE ASSOCIATES, INC.
Mr. Ted Shepard
May 29, 2002
Page 9
Response: Nolte Associates, Inc is making the variance request. The letter is included with this
submittal.
37. Resolved.
38. Radial curb return radius must be in accordance with Table 8-2 and Land Use Code 3.6.6.D.4.g —
the minimum turning radius for emergency fire access roads and in parking lots shall be twenty-
five (25) feet inside and fifty (50) feet outside. Label all curb return radii on plans.
The radius on the NE corner of Timberline and Zephyr needs to be 25' according to table 8-2,
LCUASS. Currently shown as a 30'.
Response: The radius at the NE corner has been changed to a 25' radius.
39. Show existing and proposed property lines, easements, building envelopes, buffer zones, ROW,
etc., properly labeled and dimensioned. Include a legend. Each sheet.
Response: All known property lines, easements, buildings, etc. have been shown.
40. Resolved.
Street Plan & Profile (Responses provided by David Evans & Associates)
1. Resolved.
2. Resolved.
3. Resolved.
4. Sheet 5-Future Inlets by station 44+00 on the right and left flowlines — do we need them to
construct now? Need to show how the design will work without them.
Show the inlet on the west side of Timberline as" proposed" instead of `future" as it will be
required with the ultimate design.
Response: The inlet on the west side is shown as proposed for the ultimate design. It is not
shown for the interim design.
5. Resolved.
6. Resolved.
7. 050102: Rename sheets 2 and 3 to General Notes and General Notes, Cont'd or the third page
could also be called Construction Notes.
Response: The sheet names have been changed.
8. 050102: Sheet 4 — sidewalks need to match the School plans. See redlines.
Response: The latest school plans have been incorporated into the drawing so the sidewalk now
matches their plans.
NOLTE ASSOCIATES, INC.
Mr. Ted Shepard
May 29, 2002
Page 8
Response: A legend has been added to all of the sheets.
5. LCUASS 3.3.1 Cover sheet requirements:
A. Provide the General Notes, Appendix E-1. Fill in the blanks with the appropriate information.
Need to update, there are currently 48 notes. Can download off the web site or call me and I can
email.
Response: The latest General Notes were emailed to us by the City of Fort Collins. They have
been incorporated into the Construction Plans.
B. Resolved.
C. Resolved.
D. Resolved.
E. Resolved.
15. Resolved.
16. Resolved.
17. Resolved.
18. Resolved.
19. Resolved.
20. Resolved.
21. Resolved.
22. Resolved.
23. Resolved.
24. Resolved.
25. Resolved.
26. Resolved.
27. Resolved.
28. Resolved.
29. Resolved.
30. Resolved.
31. Resolved.
32. Resolved.
33. Resolved.
34. Resolved.
35. Resolved.
36. LCUASS Tables 7-1, 7-3, Minimum sight distance at driveways and intersections on an Arterial
is 1030'. Minimum distance between high volume driveways and intersections with a raised
median is 660' measured between as the separations between centerlines. A variance request
must be submitted in accordance with LCUASS 1.9.2.
Did not receive the variance request as noted in the response letter.
NOLTE ASSOCIATES, INC.
Mr. Ted Shepard
May 29, 2002
Page 7
Response: The street capacity calculations have been provided in the drainage report and
correspond to design point 400.
The inlet has been designed to capture the 10-yr storm and is reflected in the drainage
report. During the interim condition, flows will travel in historic patterns into the
undeveloped basins 401 and runoff will be picked up in the parking lot inlet at D.P.
200.
The Timberline Road Improvements show the existing culvert to be removed. The
storm system in Zephyr Road is to be extended to the west of Timberline Road as part
of the Timbers P.U.D. This is reflected in the plans.
103.- Please show the Timbers extended pipe on Zephyr and across Timberline to the West.
Currently these plans do not show the pipe that is to be extended across Timberline as per the
revised Timbers utility plan set.
-The proposed 10-foot inlet on the east side of Timberline needs to be tied into the school's
storm sewer system. Please indicate on the plans which of the two projects will build this
inlet and the tie; will it be done by the road project or the school project?
-Inlet design on the Timberline Road: the inlet on the east side of Timberline flow should be
designed to carry the 10 year flow through the inlet, while in the 100 year, since Timberline
is an arterial street the encroachment in the street should be such that it leaves at least one
lane open in each direction. Please design the inlet on Timberline Road and the pipe to meet
these design requirements.
Response: The Timberline Road Improvements show the existing culvert to be removed. The
storm system in Zephyr Road is to be extended to the west of Timberline Road as part
of the Timbers P.U.D. This is reflected in the plans.
The inlet will be built as part of the road improvements.
The inlet has been designed to accept the 10-year runoff as well as the 100-year
runoff. During the major storm the water spread is 21.24' that will encroach the
remaining lane by 1.24'-leaving a lane width of approximately I V free of water.
Timberline Road Improvement Plan (Responses provided by David Evans & Associates)
1. Resolved.
2. Resolved.
3. Resolved.
4. LCUASS 3.2.12 Legend of Symbols — each sheet shall include a legend that identifies the
symbols pertaining to the sheet.
The legend is missing on a few sheets.
NOLTE ASSOCIATES, INC.
Mr. Ted Shepard
May 29, 2002
Page 6
Response: This ramp is to be used for emergency access and has been designed in accordance
with 7-29a.
9. 050102: Show the soccer and baseball fields.
Response: Noted and addressed.
10. 050102: Show all utilities. Our standards require this so that we can verify that you are
meeting the separation requirements between the utilities and the trees, etc.
Response: Noted and addressed.
11. 050102: The City of Fort Collins requires that the information I've asked for be clearly
shown on the Site Plan and that they match the Utility and Landscape plans. Your in-house
policy is understandable, however these comments will remain unresolved and the plans
unapproved until the plans are brought into compliance.
Response: Noted
Stormwater
102. The plans for the Timberline Road Improvements show the existing culvert under Timberline
to be extended and tied into the school's drainage system, while your plans show that the
pipe is to be abandoned and removed. Please revise your plans to be consistent with the
Timberline Road Improvements Plan.
Response: The Timberline Road Improvements show the existing culvert to be removed. The
storm system in Zephyr Road is to be extended to the west of Timberline Road as part
of the Timbers P.U.D. This is reflected in the plans.
100. The section of pipe between SDI 200 and SDI 201 has very minimal cover; please increase
cover on pipe to maintain a 1-foot minimum.
Response: Noted
18. Please provide street capacity calculations for Timberline Road.
-There is a low point on Timberline Road that is to the north of the proposed improvements.
The plans call for a future 10' Type R inlet but there is no sizing that was done and the plans
do not show what will happen to street flows in the interim condition.
-The existing 18" CMP under Timberline is shown to be merely extended. The City does not
allow CMP under the ROW, this pipe will need to be removed and replaced with and RCP
culvert. It will need to be sized such that it would be able to handle historic 100-year flows.
-No bends are allowed in the storm sewer without a manhole, please correct.
Mr. Ted Shepard
May 29, 2002
Page 5
policy is understandable, however these comments will remain unresolved and the plans
unapproved until the plans are brought into compliance.
Response: Noted
Landscape Plan
1. Provide a Legend. Need a legend for the public improvements. Repeat. Show ROW,
Easements, etc., See redlines. See Site Plan comments.
Response: Noted and addressed.
2. Show existing and proposed property lines, easements, building envelopes, buffer zones,
ROW etc., properly labeled and dimensioned. Include a legend. Repeat.
Response: Noted and addressed.
3. Incorporate comments from the Site and Utility Plans. Plans do not match.
Response: Noted and addressed.
4. Resolved.
5. Show and label detention pond/fencing. Labeling doesn't match what's shown on the Site
Plan. Which is correct?
Response: Noted and coordinated.
6. Landscape Plan: See redlines. Did not receive the redlines from the first submittal. Unable to
verify if this was resolved. Please see other miscellaneous comments and questions noted on
the redlines.
Response: Noted and addressed.
7. 050102: The high volume drive in the parent/student parking lot is not allowed. Please
coordinate with the Utility plans to show the standard drive cut. Repeat comment from the
Utility plans.
Response: This entrance meets the peak hour volume requirements.
8. 050102: The ramp at Regal and Zephyr is too big — must be designed in accordance with 16-
4a. This is a repeat comment from the Utility comment section.
NOLTE ASSOCIATES, INC.
Mr. Ted Shepard
May 29, 2002
Page 4
6. Resolved.
7. See redlines. I was not given my redlines back from the first submittal, therefore I was unable
to verify that all comments were addressed.
Response: Noted.
8. 050102: No monument signs are allowed in the utility easement. Please move it back out of
the easement.
Response: Noted and addressed.
9. 050102: The ROW and utility easements shown do not match what is shown on the Utility
plans. Please correct.
Response: Noted and coordinated.
10. 050102: The ramp at Regal and Zephyr is too big — must be designed in accordance with 16-
4a. This is a repeat comment from the Utility comment section.
Response: This ramp is to be used for emergency access and has been designed in accordance
with 7-29a.
11. 050102: The high volume drive in the parent/student parking lot is not allowed. Please
coordinate with the Utility plans to show the standard drive cut. Repeat comment from the
Utility plans.
Response: This entrance meets the peak hour volume requirements.
12. 050102: "Ramp by Others" label is incorrect. This must be constructed with this project
Response: Noted and addressed.
13. 050102: Show concrete limits in the bus parking lot.
Response: Noted and addressed.
14. 050102: Show right turn lane off Timberline. Must match The Timbers project.
Response: Noted and addressed.
15. 050102: The City of Fort Collins requires that the information I've asked for be clearly
shown on the Site Plan and that they match the Utility and Landscape plans. Your in-house
NOLTE ASSOCIATES, INC.
Mr. Ted Shepard
May 29, 2002
Page 3
Response: Note and hatching are shown on the Horizontal Control Plan.
18. Parking spaces must be designed in accordance with detail 19-04 of LCUASS
Response: Parking spaces are designed to long term parking specifications.
19. Show right hand turn lane on Timberline into Zephyr.
Response: Noted and addressed.
20. Correction to note #2, Sheet HCO1.
Response: Noted and addressed.
Site Plan
1. Please Dimension all parking spaces. Repeat. Parking spaces must be designed in
accordance with detail 19-04 of LCUASS. Please see 19-04 for length and width
requirements.
Response: Noted. Parking spaces are designed to long term parking specifications.
2. Label proposed features, future modulars, etc. Still need to show soccer fields.
Response: Noted and addressed.
3. Show existing and proposed property line, easements, building envelopes, buffer zones,
ROW etc., properly labeled. Include a legend. Each sheet. Repeat. Show line weights for
fencing, ROW, easements, etc. Must match the utility plans.
Response: Noted and addressed.
4. Coordinate the Site plan with the Utility sheet comments. Repeat. The utility, landscape and
site plans are not coordinated. Several conflicts noted.
Response: Noted.
5. Show and label detention pond and fencing. Doesn't match Landscape plans, Which is
correct?
Response: Noted and addressed.
NOLTE ASSOCIATES, INC.
Mr. Ted Shepard
May 29, 2002
Page 2
Response: Note added at Timberline and Zephyr on Horizontal Control Plan. We are waiting on
the response to the variance request submitted for the Timberline entrance.
7. High volume drive not permitted in the parent/student drop off parking lot. Must be designed
in accordance with LCUASS 7-29a.
Response: This entrance meets the peak hour volume requirements.
8. Resolved
9. Resolved
10. Resolved
11. Show Existing and proposed property lines, easements, building envelopes, buffer zones,
ROW, etc., properly labeled and dimensioned. Include a Legend. Each Sheet.
Response: Noted and addressed
12. Resolved
13. Since you will be keeping the set separate, please provide a typical street section for Zephyr
Road. See the Timberline Road Improvement Plans for example, but don't label it "NIC".
Response: Added to sheet DT03.
14. Relabel sheet CV02 to be called "General Notes" as shown in the index.
Response: Noted and shown on CV02
15. General note 48 — Correction on A, possible B and C to be added. See redlines.
Response: Noted and addressed
16. This was bubbled on the first set or redlines- the ramp at Regal and Zephyr is to big — Must
be designed in accordance with 16-4a. It can match the width of the sidewalk, or in this case
be 8' max.
Response: This ramp is to be used for emergency access and has been designed in accordance
with 7-29a. The Poudre Fire Authority determined the width dimension of this ramp.
17. Call out Gravel Pave areas as noted on the landscape plan. Show the concrete crosswalk
areas in the bus parking lot as shown on the landscape plan.
NOLTE ASSOCIATES, INC.
BEY ON D E N G IN E E R ING
May 29, 2002
Mr. Ted Shepard
Senior Planner
Current Planning Division
City Of Fort Collins
281 N. College Ave.
Fort Collins, CO 80524
SUBJECT: Response to City of Fort Collins Comments dated May 1, 2002
Proposed 2003 Elementary School — Timberline Site
Site Plan Advisory Review, #5-02
Dear Mr. Shepard:
This letter is in response to the comments received from the City of Fort Collins (Engineering and
Storm Water Departments). Specific responses are in the order of each comment sheet and reference
the note number where applicable.
2003 Elementary School Overall Utility Plan
1. Resolved
2. Add note: "Concrete to property line" on all drive entrances to the school.
Response: This note has been added to the Horizontal Control Plan.
3. How will the future inlet by others on Timberline and Timbertrail (?) work with your
drainage design if not in by the time you go to construction?
Response: Corrected labeling. Now shown as proposed.
4. No drainage from the berm over sidewalk along Timberline. Sheet flow should go from back
of sidewalk into ROW, and then b.o.w. into the property.
Response: We are awaiting the response to the variance request.
5. Resolved
6. Radial curb return radius must be in accordance with Table 8-2. Label all curb return radii on
plans.