HomeMy WebLinkAboutFOSSIL CREEK COMMUNITY PARK - PDP - 44-00 - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject:
Planner: aL Traffic Operations:
Date: — 9-
Items Requited
Site Land Plat NO Drainage R t Other items Required
Engineering
Stormwater X �-
Water/Waitewate
Redlined Items Being Returned
Site Land Plat Utility Drainage R t Other items Being Returned
TralfcOperationi
—
—
Trans. Planning
—
Tramlbrt
-
-
Natural Resources
—
—
Park Planning
Totals
Gj
Z
Q\
2,
.
t---- -{rGrexa
Other: —°
Note: All redlined Items should be returned with the roubmittal/ reMont.
'lei
V
f�
Revtsions Routing
Item: [# 4d- -
-
Date:
C
r-v�tcuh�Ccr�ve64 �y�`°
Cd�
FILE. PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
FORESTRY
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION '
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE/THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE/PRPA
am
LLIdL
l�
heetv,7
o;
Rsr. S 07.97 -r 1. 1t
`� — � c�nav�t� ,Ve-c" z`�