HomeMy WebLinkAboutFOSSIL CREEK COMMUNITY PARK - PDP - 44-00 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject..
Planner:
Engineer: _AkcG
TraMc Operations:
Date. y
Items Requested
Site land Plat Utility Drainage fl t Other Items Re wired
Engineering
Redlined Items Being Returned
Site land Plat UtilityDrainage fl t Other hems Being Returned
Stormwater
Water/Wastewate
TrafhcOperations
><
Trans. Planning
x
i
Transfort •
Natural Resources
X.A
X
Park Planning
Totals
T
Other:
Note: All redlined items should be returned with the resubmittal/ resdsissas.
- 3 �pr�s/Lr9lt�iv,o�
Re7visions Routing Sleet
PC
I
BUILDING INSPECTION
LIGHT & POWER
NN
m
eR
�mM
����������
PAN
-�.-----.--
•
.--.-ADVANCE
--�.-�
PLANNING -Now
IN
'
--.--
_...-�.-.WATER
m
CONSERVATION
m
IN
• •
--�--�-.--.-PUBLIC
.--..----.--
IN
SERVICE-
��.��.---ON
--.-
m
e ' •
-....--.--.--
e
Own—
m m�
RAILROAD: ' 1 i
--.
--.
M-*----
' e.
wimmmm�i1
mamammm17
mmmmm�l
mommom�
mm
MEN
rm
T--R)c� is ►to