HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - REPORTS - TRAFFIC STUDY (5)HCS2000: Signalized Intersections Release 4.1
Analyst: Michael
Agency: Matthew J. Delich, P.E
Date: 2/16/01
Period:. am p
Project ID: 0106
E/W St: Fossil Creek/Cameron
No. Lanes
LGConfig
Volume
Lane Width
RTOR Vol
Eastbound
1 L T R
I
L TR
170 5 30
112.0 12.0
1 0
Duration 0.2
Phase Combination
1
EB Left
A
Thru
A
Right
A
Peds
X
WB Left
A.
Thru
A
Right
A
Peds
X
NB Right
SB Right
Green
24.0
Yellow
3.0
All Red
2.0
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year : recent short 4zRGiDtotal
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
Westbound i Northbound I Southbound I
L T R I L T R I L T R 1
1 0 1 1 I 1 3 0 I 1 3 0 I
LT R I L TR I L TR i
150 5 275 15. 1495 65 1355 1665 20 I
1 12.0 12.0 112.0 12.0 112.0 12.0 1
1 0 1 0 1 0 I
Area Type: All other areas
_ Signal Operations_
2 3 4 1
1 NB Left
1 Thru
1 Right
1 Peds
1 SB Left
1 Thru
1 Right
1 Peds
1 EB Right
1 WB Right
5 6
7 8
A
P
P
P
X
A A
P
A
P
A
P
X
A A
6.0 10.0 49.0
0.0 0.0 4.0
0.0 0.0 2.0
Cycle Length: 100.0
secs
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst:. matt
Agency/Co.: mjdpe
Date Performed: 12/17/01
Analysis Time Period: am pm
Intersection: college/fairway
Jurisdiction: fort collins
Units: U. S. Customary,-,.-,,
r
Analysis Year, 200 2020 bakgrd CLSts
Project ID: 0106
East/West Street: fairway lane
North/South Street: college
Intersection Orientation: NS Study period'(hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
20
1515
15
30
1655
30
Peak -Hour Factor, PHF
0.95
0.95
0.95
0.95
0.95
0.95
Hourly Flow Rate, HFR
21
1594
15
31
1742
31
Percent Heavy Vehicles
0
--
--
0
--
-'
Median Type TWLTL
RT Channelized?
No
No
Lanes
1
2 1
1
2 1
Configuration
L
T R
L
T R
Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9
I 10
11
12
L
T
R
I L
T
R
Volume
35
0
40
35
0
25
Peak Hour Factor, PHF
0.95
0.95
0.95
0.95
0.95
0.95
Hourly Flow Rate, HFR
36
0
42
36
0
26
Percent Heavy Vehicles
0
0
0
0
0
0
Percent Grade (8)
0
0
Median Storage 1
Flared Approach: Exists?
Storage
RT Channelized?
No
No
Lanes
0
1 1
1
1 1
Configuration
LT
R
L
T R
Approach
Movement
Lane Config
Delay, Queue Length, and Level of Service
NB SB Westbound Eastbound
1 4 1 7 8 9 I 10 11 12
L L I LT R I L T R
v (vph)
21
31
36
42
36
0
26
C(m) (vph)
356
411
68
334
57
57
298
v/c
0.06
0.08
0.53
0.13
0.63
0.00
0.09
95% queue length
0.19
0.24
2.18
0.43
2.59
0.00
0.28
Control Delay
15.7
14.5
106.4
17.3
142.8
68.2
18.2
LOS
C
B
F
C
F
F
C
Approach Delay
58.4
90.6
Approach LOS
F
F
HCS2000: Unsignalized Intersections Release 4.1a
Intersection Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 413
1291
0.03
0.32
23.3
C
TR 518
1671
0.03
0.31
24.1
C
23.8
C
Westbound
LT 435
1402
0.17
0.31
25.3
C
21.9
C
R 697
1583
0.53
0.44
21.2
C
Northbound
L 384
1770
0.07
0.59
9.1
A
TR 2530
5060
0.69
0.50
16.1
B
16.0
B
Southbound
L 269
1770
0.72
0.59
30.0
C
TR 2521
5042
0.41
0.50
12.5
B
15.3
B
Intersection Delay
= 16.6
(sec/veh) Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16/01
Analysis Time Period: <�pm
Intersection: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long bkgrd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
Site
Cameron
m
a
U
` Fairway
20/9 ---/ 1
0
N
cf)
J
N
O �
N 0/1
--v-1 /2
Fossil Creek
23/16
2/1 —
10/8
�— AM/PM
41
N
SITE GENERATED PEAK HOUR TRAFFIC Figure 3
c
ill
Cameron
Fairway
-.@*— - Denotes Lane
Fossil Creek
N
LONG RANGE (2020) GEOMETRY
Figure 9
Multimodal Transportation Level of Service Manual p. 18
LOS Standards for Development Review - Pedestrian ,
Figure 6. Pedestrian LOS Worksheet
T,c,a�vsit Fi(c�r-try
�OGS �UOr CKIST
City of Port Collins Transportation Master Plan
APPENDIX E
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 12/17/01
Analysis Time Period: am
Intersection: College/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short lon bkgrd total
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound ' Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 1360 15
Peak -Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 1431 15
Percent Heavy Vehicles -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 2 0
Configuration T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
volume 1�
Peak Hour Factor, PHF 0.95
Hourly Flow Rate, HFR 15
Percent Heavy Vehicles 2
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1
Configuration R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config I I R
v (vph)
15
C(m) (vph)
810
v/c
0.02
95% queue length
0.06
Control Delay
9.5
LOS
A
Approach Delay
9.5
Approach LOS
A
HCS2000: Unsignalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 17/O1
Analysis Time Period. am pm
intersection: ollege/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short long bkgrd total
Project Ib: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS
Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5' 6
L T R I L T R
Volume lv�
Peak -Hour Factor, PHF 0.95 0.95
Hourly F1ow'Rate, HFR 824 5
Percent Heavy Vehicles -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 2 0
,.Configuration T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R I L T R
volume
Peak Hour Factor, PHF 0.95
Hourly Flow Rate, HFR 10
Percent Heavy Vehicles 2
Percent Grade (%) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1
Configuration R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config I I R
v (vph)
10
C(m) (vph)
922
v/c
0.01
95% queue length
0.03
Control Delay
8.9
LOS
A
Approach Delay
8.9
Approach LOS
A
HCS2000: Unsignalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
Intersection Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 379
1149
0.56
0.33
29.31
C
T 627
1900
0.03
0.33
22.7
C
27.7
'C
R 533
1615
0.12
0.33
23.5
C
Westbound
L 468
1419
0.22
0.33
24.5
C
TR 542
1641
0.32
0.33
25.4
C
25.1
C
Northbound
L 275
1805
0.23
0.57
19.1
B
TR 2320
5155
0.82
0.45
27.2
C
27.0
C
Southbound
L 275
1805
0.38
0.57
17.8
B
TR 2312
5137
0.93
0.45
33.9
C
33.1
C
Intersection Delay
= 29.8
(sec/veh) Intersection
LOS = C
HCS2000: Signalized Intersections Release 4.1a
Phone: Fax:
E-Mail:
OPERATIONAL ANALYSIS
Analyst:
Agency/Co.:
Date Performed:
Analysis Time Period:
Intersection:
Area Type:
Jurisdiction:
Analysis Year:
Project ID: 0106
fairway
matt
mj dpe
12/17/01
am
college/fairway
All other areas
fort collins
(ETD
East/West Street North/South Street
college
6
Intersection Performance Summary_
Appr/ Lane Adj Sat Ratios Lane Group
Lane Group Flow Rate
Gr CaDacity (s) v/c g/C Delay LOS
Eastbound
L 322
1288
0.34
0.25
31.4
T 475
1900
0.02
0.25
28.3
R 404
1615
0.08
0.25
28.8
Westbound
L 357
1426
0.12
0.25
29.1
TR 411
1642
0.28
0.25
30.6
Northbound
L 343
1805
0.17
0.65
8.2
TR 2728
5148
0.78
0.53
21.0
Southbound
L 275
1805
0.38
0.65
15.9
TR 2709
5111
0.48
0.53
15.4
Intersection Delay
= 19.6
(sec/veh)
Phone:
E-Mail:
Approach
Delay LOS
C 30.7 C
C
C
C 30.2 C
A
C 20.7 C
B
B 15.4 B
Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1a
Analyst:
Agency/Co.:
Date Performed:
Analysis Time Period
Intersection:
Area Type:
Jurisdiction:
Analysis Year:
Project ID: 0106
fairway
Fax:
OPERATIONAL ANALYSIS
matt
mjdpe
12/17/01
pm
college/fairway
All other areas
f, collins
202
East/West Street
North/South Street
college
HCS2000: Signalized Intersections Release 4.1a
Analyst: matt
Agency: mjdpe
Date: 17/01
Period: am pm
Project 0106
E/W St: fairway
Inter.: college/fairway
Area Type: All other areas
Jurisd: fort collins
Year
N/S St: college
INTERSECTION
SUMMARY_
_ _SIGNALIZED
Eastbound I Westbound
I Northbound
L T R I L T R
1 L
T R
No. Lanes
1 1
3 0
1 1 1 1 1 1 1 0
LGConfig
I L T R I L TR
I L
TR
Volume
1105 10 30 140 10 100
155
1915 100
.Lane Width
112.0 12.0 12.0 112.0 12.0
112.0
12.0
RTOR Vol
1 0 1 0
1
0
Duration 0.25
Area
Type: All other
areas
Signal Operations_
Phase Combination
1 2
3 4 1
EB Left
A
1 NB
Left
Thru
A
1
Thru
Right
A
I
Right
Peds
X
I
Peds
WB Left
A
1 SB
Left
Thru
A
1
Thru
Right
A
(
Right
Peds
X
1
Peds
NB Right
I EB
Right
SB Right
1 WB
Right
Green
25.0
Yellow
3.0
All Red
2.0
I Southbound
I L T R
I
I 1 3 0
I L TR
1100 1105 120
112.0 12.0
1 0
5 6 7
A P
P
P
X
A P
P
P
X
12.0 53.0
3.0
0.0 2.0
Cycle Length: 100.0
secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C. Delay LOS Delay LOS
Eastbound
L 310
1193
0.29
TR 387
1613
0.12
Westbound
LT 339
1412
0.19
R 712
1583
0.41
Northbound
L 339
1770
0.05
TR 2476
5054
0.67
Southbound
L 429
1770
0.87
TR .2988
5065
0.60
Intersection Delay = 16.3
0.26 30.1 C
0.24 29.9 C 30.0 C
0.24
30.5
C 21.0
C
0.45
18.9
B
0.59
8.6
A
0.49
16.5
B 16.5
B
0.67
45.2
D
0.59
8.2
A 14.5
B
(sec/veh)
Intersection
LOS = B
HCS2000:,Signalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16 01
Analysis Time Period: am pm
Intersection: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short on bkgrd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1a
Analyst: Michael
Agency: Matthew J. Delich, P.E
Date: 2/16/01
Period: am
Project ID: 0106
E/W St: Fossil Creek/Cameron
No. Lanes
LGConfig
Volume
Lane Width
RTOR Vol
Eastbound
L T R
I
I 1 1 0
L TR
185 5 40
112.0 12.0
1 0
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year : recent short lon bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
Westbound I Northbound
L T R I L T R
I I
1 0 1 1 1 1 3 0
I LT R I L TR
150 10 275 115 1505 65
I 12.0 12.0 112.0 12.0
I 0 1 0
Duration 0.25
Area Type: All other
areas
Signal Operations_
Phase Combination
1
2 3 4 1
EB Left
A
I NB
Left
Thru
A
I
Thru
Right
A
I
Right
Peds
X
I
Peds
WB Left
A
I SB
Left
Thru
A
I
Thru
Right
A
I
Right
Peds
X
I
Peds
NB Right
I EB
Right
SB Right
1 WB
Right
Green
24.0
Yellow
3.0
All Red
2.0
I Southbound
I L T R
I
i 1 3 0
I L TR
1355 1670 45
112.0 12.0
1 0
5
6
.7 8
A
P
P
P
X
A
A
P
A
P
A
P
X
A A
6.0 10.0 49.0
0.0 0.0 4.0
0.0 0.0 2.0
Cycle Length: 100.0
secs
Intersection Performance Summary_
Appr/ Lane Adj Sat Ratios Lane Group
Lane Group Flow Rate
rrn Capacity (s) v/c g/C Delay LOS
Eastbound
Approach
Delay LOS
L 400
1251
0.09
0.32
23.9
C
,
TR 520
1679
0.06
0.31
24.3
C
24.1
C
Westbound
LT 428
1382
0.17
0.31
25.3
C
21.9
C
R 697
1583
0.53
0.44
21.2
C
Northbound
L 379
1770
0.08
0.59
9.2
A
TR 2530
5060
0.69
0.50
16.2
B
16.0
B
Southbound
L 269
1770
0.74
0.59
32.0
C
TR 2518
5036
0.42
0.50
12.6
B
15.7
B
Intersection
Delay
= 16.8
(sec/veh)
Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 34,16101
Analysis Time Period: am pm
Intersection: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short lon bkgrd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1a
Analyst: Michael
Agency: Matthew J. Delich, P.E
Date: 2/16/01
Period: pm
Project D: 0106
E/W St: Fossil Creek/Cameron
No. Lanes
LGConfig
Volume
Lane Width
RTOR Vol
Eastbound
L T R
I
1 1 1 0
L TR
135 10 .20
112.0 12.0
1 0
'Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year recent short ong bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
Westbound I Northbound
L T R I L T R
I I _
1 0 1 1 1 1 3 0
LT R I L TR
165 5 350 130 1600 55
1 12.0 12.0 112.0 12.0
1 0 1 0
Southbound I
L T R I
I I
1 1 3 0 I
1 L TR I
1190 935 65
112.0 12.0 I
1 0 i
Duration 0.25
Area
Type: All
other areas
Signal
Operations
_
Phase Combination
1 2
3
4 1
5
6 7 8
EB Left
A
1 NB Left
A
P
Thru
A
I Thru
P
Right
A
I Right
P
Peds
X
I Peds
X
WB Left
A
1 SB Left
A
P
Thru
A
I Thru
P
Right
A
I Right
P
Peds
X
I Peds
X
NB Right
i EB Right
SB Right
( WB Right
A
Green
31.0
8.0
50.0
Yellow
3.0
0.0
4.0
All Red
2.0
0.0
2.0
Cycle Length: 100.0 secs
APPENDIX.D
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 12/�17/O1
Analysis Time Period: am �m
Intersection: College/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short long bkgr .total
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
1700
15
Peak -Hour Factor, PHF
0.95
0.95
Hourly Flow Rate, HFR
1789
15
Percent Heavy Vehicles -- --
--
--
Median Type Undivided
RT Channelized?
No
Lanes
2 1
Configuration
T R
Upstream Signal? No
No
Minor Street: Approach
Westbound
Eastbound
Movement
7 8 9
I 10 11
12
L T R
I L T
R
Volume
5
Peak Hour Factor, PHF
0.95
Hourly Flow Rate, HFR
5
Percent Heavy Vehicles
2
Percent Grade M
0
0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
No
Lanes
1
Configuration
R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config I I R
v (vph) 5
C(m) (vph) 752
v/c 0.01
95% queue length 0.02
Control Delay 9.8
LOS A
Approach Delay 9.8
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 12/17/01
Analysis Time Period pm
Intersection: College/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short long bkgr total
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 980 5
Peak -Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 1031 5
Percent Heavy Vehicles -- -- -- --
Median Type Undivided
RT Channelized? No
Lanes, 2 1
,Configuration T R
',Upstream Signal? No No
Minor Street: Approach
Westbound
Eastbound
Movement
7 8 9
1 10 11
12
L T R
I L T
R-
Volume
10
Peak Hour Factor, PHF
0.95
Hourly Flow Rate, HFR
10
Percent Heavy Vehicles
2
Percent Grade M
0
0
Median Storage
Flared.Approach: Exists?
Storage
RT Channelized? No
Lanes 1
Configuration R
Delay,
Approach NB
Movement 1
Lane Config
Queue Length, and Level of Service
SB Westbound Eastbound
4 i 7 8 9 1 10 11 12
I I R
v (vph)
10
C(m) (vph)
884
v/c
0.01
95% queue length
0.03
Control Delay
9.1
LOS
A
Approach Delay
9.1
Approach LOS
A
HCS2000: Unsignalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst: matt
Agency/Co.: mjdpe
Date Performed: 17/01
Analysis Time Period: tlege/fairway
pm
Intersection:
Jurisdiction: fort Collins
Units: U. S. Customary
Analysis Year: 2005 2020 bakgrd
Project.ID: 0106
East/West Street: fairway lane
North/South Street: college
Intersection Orientation: NS
Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound . Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
10
1620
30
30
965
15
Peak -Hour Factor, PHF
0.95
0.95
0.95
0.95
0.95
0.95
Hourly Flow Rate, HFR
10
1705
31
31
1015
15
Percent Heavy Vehicles
0
--
--
0
--
--
Median Type TWLTL
RT Channelized?
No
No
Lanes
1
2 1
1
2 1
Configuration
L
T R
L
T R
Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9
1 10
11
12
L
T
R
I L
T
R
Volume
15
0
25
35 0
5
Peak Hour Factor,
PHF
0.95 0.95
0.95
0.95 0.95
0.95
Hourly Flow Rate,
HFR
15
0
26
36 0
5
Percent Heavy Vehicles
0
0
0
0 0
0
Percent Grade M
0
0
Median Storage
1
Flared Approach:
-Exists?
Storage
RT Channelized?
No
No
Lanes
0 1
1
1 1
1
Configuration
LT
R
L T
R
Delay,
Queue
Length,
and Level
of Service
Approach
NB
SB
Westbound
Eastbound
Movement
1
4
1 7
8
9 1 10
11 12
Lane Config
L
L
I LT
R I L
T R
v (vph)
10
31
15
26
36
0
5
C(m) (vph)
682
368
75
307
122
76
515
v/c
0.01
0.08
0.20
0.08
0.30
0.00
0.01
95% queue length
0.04
0.27
0.69
0.28
1.14
0.00
0.03
Control Delay
10.4
15.7
64.6
17.8
46.4
52.4
12.1
LOS
B
C
F
C
E
F
B
Approach Delay
34.9
42.2
Approach LOS
D
E
HCS2000: Unsignalized Intersections Release 4.1a
Intersection Performance Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 350
1296
0.25
.0.27
29.0
C
TR 419
1613
0.11
0.26
28.3
C
28.8
C
Westbound
LT 381
1464
0.14
0.26
28.6
C
20.1
C
R 712
1583
0.36
0.45
18.3
B
Northbound
L 344
1770
0.05
0.57
10.0+
B
T 1734
3539
0.75
0.49
19.0
B
18.7
B
R 776
1583
0.07
0.49
13.7
B
Southbound
L 382
1770
0.85
0.64
43.6
D
T 2017
3539
0.71
0.57
11.2
B
17.0
B
R 902
1583
0.05
0.57
._9.6
A
Intersection
Delay
= 18.3
(sec/veh) Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16/01
Analysis Time Period: am
Intersection: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent shor long bkgrd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1a
Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
Period: am pm
Project ID: 106
E/W St: Fossil Creek/Cameron
Eastbound
L T R
I
No. Lanes 1 1 1
LGConfig 1 L TR
Volume 185 5
Lane Width 112.0 12.0
RTOR Vol I
Duration 0.25
Phase Combination
1
EB Left
A
Thru
A
Right
A
Peds
X
WB Left
A
Thru
A
Right
A
Peds
X
NB Right
SB Right
Green
26.0
Yellow
3.0
All Red
2.0
40
A
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Coll.Las
Year : recent hort long bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
Westbound I Northbound I Southbound
L T R I L T R I L T R
I I - I
— 1 0 1 1 I 1 2 1 I 1 2 1
LT R I L T R I L T R
140 10 240 115 1230 55 1310 1365 45
1 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0
I 0 1 0 1 0
Area Type: All other
areas
Signal Operations_
2 3 4 1
1 NB
Left
1
Thru
1
Right
1
Peds
1 SB
Left
i
Thru
1
Right
1
Peds
1 EB
Right
I WB
Right
5
6
7 8
A
P
P
P
X
A
A
P
A
P
A
P
X
A A
6.0 8.0 49.0
0.0 0.0 4.0
0.0 0.0 2.0
Cycle Length: 100.0
secs
Intersection Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 383
1277
0.10
0.30
25.3
C
TR 487
1679
0.07
0.29
25.8
C
25.5
C
Westbound
LT 406
1401
0.16
0.29
26.6
C
24.2
C
R 633
1583
0.53
0.40
23.7
C
Northbound
L 434
1770
0.07
0.61
8.3
A
T 1911
3539
0.72
0.54
14.5
B
14.3
B
R 855
1583
0.05
0.54
11.0
B
Southbound
L 260
1770
0.67
0.61
20.6
C
T 1911
3539
0.42
0.54
10.3.
B
12.1
B
R 855
1583
0.08
0.54
11.2
B
Intersection
Delay
= 15.1
(sec/veh) Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1a
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16/01
Analysis Time Period: pm.
Intersection: ollege/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent (!Er;)
short long bkgrd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
I
HCS2000: Signalized Intersections Release 4.1a
Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2101
Period: am
p pm
Project 0106
E/W St: Fossil Creek/Cameron
Eastbound
L T R
I
No. Lanes I 1 1 0
LGConfig I L TR
Volume 135 10 20
Lane Width 112.0 12.0
RTOR Vol 1 0
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year : recent OEort long bkgrd total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
I Westbound I Northbound I Southbound I
L T R I L T R I L T R I
1 0 1 1 I 1 2 1 I 1 2 1 1
LT R I L T R I L T R I
155 5 320 130 1310 40 1165 765 65
1 12.0 12.0 112.0 12.0 12.0 112.0 12.0 12.0 i
1 0 1 0 1 0 i
Duration 0.25
Area
Type: All other
areas
_Signal Operations_
Phase Combination
1 2
3 4 1
EB Left
A
I NB
Left
Thru
A
I
Thru
Right
A
i
Right
Peds
X
I
Peds
WB Left
A
( SB
Left
Thru
A
I
Thru
Right
A
I
Right
Peds
X
I
Peds
NB Right
I EB
Right
SB Right
1 WB
Right
Green
29.0
Yellow
3.0
All Red
2.0
5 6 7
A P
P
P
X
A P
P
P
X
A
6.0 54.0
0.0 4.0
0.0 2.0
Cycle Length: 100.0
secs
APPENDIX C
Intersection Performance
Summary_
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 379
1149
0.53
0.33
28.6
C
T 627
1900
0.03
0.33
22.7
C
27.1
C
R 533
1615
0.12
0.33
23.5
C
Westbound
L 468
1419
0.22
0.33
24.5
C
TR 542
1641
0.32
0.33
25.4
C
25.1
C
Northbound
L 275
1805
0.19
0.57
18.5
B
.TR 2319
5154
0.81
0.45,
27.0
C
26.8
C
Southbound
L 275
1805
0.38
0.57
17.6
B
TR 2312
5138
0.91
0.45
32.1
C
31.4
C
Intersection Delay
= 28.8
(sec/veh) Intersection
LOS = C
HCS2000: Signalized Intersections Release 4.1a
Phone:
E-Mail:
Analyst:
Agency/Co.:
Date Performed:
.Analysis Time Period:
Intersection:
Area Type:
Jurisdiction:
Analysis Year:
Project ID: 0106
fairway
Fax:
OPERATIONAL ANALYSIS
matt
mjdpe
12/17/01
am (�
college/fairway
All other areas
f t Collins
20
East/West Street
North/South Street
college
HCS2000: Signalized Intersections Release 4.1a
Analyst: matt
Agency: mjdpe
Date: 12/17/01
Period:. am p
Project ID: 0106
E/W St: fairway
Inter.: college/fairway
Area Type: All other areas
Jurisd: fort collins
Year cZT2--'O f
N/S St: college
SIGNALIZED INTERSECTION SUMMARY
Eastbound
I Westbound
I Northbound
L T R
I L T R
I L T R
No. Lanes
I 1 1 0
I 1 3 0
I 1 1 1
LGConfig.
I L T R
I L TR
1 L TR
Volume
1190 15 60
1100 15 150
150 1710 75
Lane Width
112.0 12.0 12.0
112.0 12.0
112.0 12.0
RTOR Vol
1 0
1 0
1 0
Duration 0.25
Area
Type: All other
areas
Signal Operations___
Phase Combination
1 2
3 4 1
EB Left
A
I NB
Left
Thru
A
I
Thru
Right
A
I
Right
Peds
X
(
Peds
WB Left
A
I SB
Left
Thru
A
I
Thru
Right
A
I
Right
Peds
X
1
Peds
NB Right
I EB
Right
SB Right
i WB
Right
Green
33.0
Yellow
3.0.
All Red
2.0
Southbound
I L T R
1 3 0
I L TR
1100 1865 125
112.0 12.0
1 0
5 6
7 8
A P
P
P
X
A P
P
P
X
12.0 45.0
3.0
0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Capacity
Flow Rate
(s)
g/C
_
Delay
LOS
Delay
LOS
v/c
Grp
Eastbound
L 322
1288
0.28
0.25
30.7
C
T 475
1900
0.02
0.25
28.3
C
30.0
C
R 404
1615
0.08
0.25
28.8
C
Westbound
L 357
1426
0.12
0.25
29.1
C
TR 411
1642
0.28
0.25
30.6
C
30.2
C
Northbound
L 346
1805
0.15
0.65
8.1
A
.TR 2728
5148
0.77
0.53
20.8
C
20.4
C
Southbound
L 275
1805
0.38
0.65
15.7
B
TR 2708
5110
0.47
0.53
15.3
B
15.3
B
Intersection Delay
= 19.3
(sec/veh) Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1a
Phone: Fax:
E-Mail:
OPERATIONAL ANALYSIS
Analyst:
Agency/Co.:
Date Performed:
Analysis Time Period
Intersection:
Area Type:
Jurisdiction:
Analysis Year:
Project ID: 0106
fairway
matt
mj dpe
12/17/01
am pm
ollege/fairway
All other areas
fort collins
East/West Street
North/South Street
college
Intersection Performance Summary_
Appr/ Lane Adj Sat Ratios. Lane Group
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS
Eastbound
L 344
1322
0.22
0.26
29.3
TR 389
1621
0.10
0.24
29.7
Westbound
LT 334
1391
0.17
0.24
30.4
R. 712
1583
0.41
0.45
18.9
Northbound
L 380
1770
0.01
0.59
8.4
TR 2476
5054
0.66
0.49
16.5
Southbound
L 429
1770
0.87
0.67
45.1
TR 2995
5076
0.59
0.59
8.0
Intersection
Delay
= 16.2
(sec/veh)
C
C
C
B
A
B
Approach
Delay LOS
29.4 C
20.8 C
16.5 B
D
A 14.5 B
Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16 O1
Analysis Time Period: a pm
Intersection: Co ege/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long bkgrd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1
Analyst: Michael
Agency: Matthew J. Delich, P.E.
Date: 2/16/01
Period:�pm
Project TD: 0106
E/W St: Fossil Creek/Cameron
No. Lanes
LGConfig
Volume
Lane Width
RTOR Vol
1 Eastbound
L T R
I 1 1 0
I L TR
I10 5 10
112.0 12.0
1 0
Duration 0.25
Phase Combination
1
EB Left
A
Thru
A
Right
A
Peds
X
WB Left
A
Thru
A
Right
A
Peds
X
NB Right
SB Right
Green
31.0
Yellow
3.0
All Red
2.0
Inter.: College/Fossil Creek/Cameron
Area Type: All other areas
Jurisd: Fort Collins
Year recent short lon bkgr total
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
I Westbound I Northbound
I L T R I L T R
I I
1 0 1 1 I 1 3 0
1 LT R I L TR
165 5 350 125 1595 55
I 12.0 12.0 112.0 12.0
I 0 1 0
Area Type: All other areas
Signal Operations_
2 3 4 I
I NB Left
I Thru
I Right
I Peds
I SB Left
I Thru
I Right
I Peds
EB Right
I WB Right
5 6
A P
P
P
X
A P
P
P
X
I Southbound I
I L T R I
I _ I
I 1 3 0 I
I L TR I
1185 925 55 1
112.0 12.0 i
1 0 I
A
8.0 50.0
0.0 4.0
0.0 2.0
Cycle Length
7 ,8
100.0 secs
APPENDIX B
-;
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst: matt
Agency/Co.: mjdpe
Date Performed: 12/11
Analysis Time Period: am pm
Intersection: col ege/fairway
Jurisdiction: fort collins
Units: U. S. Customary
Analysis Year: 2005 2020 bakgrd
Project ID: 0106
East/West Street: fairway lane
North/South Street: college
Intersection Orientation: NS
total
Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6'
L T R i L T R
Volume
10
1500
15
30
1615
25
Peak -Hour Factor, PHF
0.95
0.95
0.95
0.95
0.95
0.95
Hourly Flow Rate, HFR
10
1578
15
31
1700
26
Percent Heavy Vehicles
0
--
--
0
--
--
Median Type TWLTL
RT Channelized?
No
No
Lanes
1
2 1
1
2 1
Configuration
L
T R
L
T R
Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9
I 10
11
12
L
T
R
I L
T
R
Volume
35
0
40
25
0
25
Peak Hour Factor, PHF
0.95 0.95
0.95
0.95
0.95
0.95
Hourly Flow Rate, HFR
36
0
42
26
0
26
Percent Heavy Vehicles
0
0
0
0
0
0
Percent Grade (%)
0
0
Median Storage 1
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
Configuration
0 1 1
LT R
No
1 1 1
L T R
No
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 i 10 11 12
Lane Config L L I LT R I L T R
v (vph)
10
31
36
42
26
0
26
C(m) (vph)
371
417
74
338
61
62
308
v/c
0.03
0.07
0.49
0.12
0.43
0.00
0.08
95% queue length
0.08
0.24
2.00
0.42
1.63
0.00
0.27
Control Delay
15.0-
14.3
93.0
17.2
102.2
63.1
17.8
LOS
B
B
F
C
F
F
C
Approach Delay
52.2
60.0
Approach LOS
F
F
HCS2000: Unsignalized Intersections Release 4.1a
HCS2000: Unsignalized Intersections Release 4.1a
TWO-WAY STOP CONTROL SUMMARY
Analyst:
matt
Agency/Co.:
mjdpe
Date Performed:
17/01
Analysis Time Period:
a pm
Intersection:
college/fairway
Jurisdiction:
fort collins
Units: U. S. Customar
Analysis Year: 2005 2020 Dgrdtotal
Project ID: 0106
East/West Street: fairway lane
North/South Street: college
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
5
1595
30
30
945
15
Peak -Hour Factor, PHF
0.95
0.95
0.95
0.95
0.95
0.95
Hourly Flow Rate, HFR
5
1678
31
31
994
15
Percent Heavy Vehicles
0
--
--
0
--
--
Median Type TWLTL
RT Channelized?
No
No.
Lanes
1 2 1
1
2 1
Configuration
L T R
L
T R
Upstream Signal?
No
No
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9
I 10
11
12
L
T
R
I L
T
R
Volume
15
0
25
15
0
5
Peak Hour Factor,
PHF
0.95
0.95
0.95
0.95
0.95
0.95
Hourly Flow Rate,
HFR
15
0
26
15
0
5
Percent Heavy Vehicles
0
0
0
0
0
0
Percent Grade M
0
0
Median Storage
1
Flared Approach:
Exists?
Storage
RT Channelized?
No
No
Lanes
0
1 1
1
1 1
Configuration
LT
R
L
T R
Delay, Queue Length, and Level of Service
Approach
Movement
Lane Config
NB
1
L
SB
4 17
L I
Westbound
8
LT
9 1
R I
Eastbound
10 11
L T
12
R
v (vph)
5
31
15
26
15
0
5
C(m) (vph)
695
377
78
313
128
80
524
v/c
0.01
0.08
0.19
0.08
0.12
0.00
0.01
95% queue length
0.02
0.27
0.66
0.27
0.39
0.00
0.03'
Control Delay
10.2
15.4,
61.8
17.5
36.8
50.0
11.9
LOS
B
C
F
C
E
E
B
Approach Delay
33.7
30.6
Approach LOS
D
D
HCS2000: Unsignalized Intersections Release 4.1a
Intersection Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 365
1353
0.20
0.27
28.5
C
TR 421
1621
0.09
0.26
28.1
C
28.3
C
Westbound
LT 374
1439
0.13
0.26
28.5
C
19.9
B
R 712
1583
0.36
0.45
18.3
B
Northbound
L 367
1770
0.01
0.57
9.7
A
T 1734
3539
0.74
0.49
18.8
B
18.6
B
R 776
1583
0.07
0.49
13.7
B
Southbound
L 385
1770
0.85
0.64
42.1
D
T 2017
3539
0.'71
0.57
11.2
B
16.8
B
R 902
1583
0.02
0.57
9.4
A
Intersection Delay
= 18.1
(sec/veh) Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2/16/01
Analysis'Time Period: p
Intersection: o ege/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Collins
Analysis Year: recent short long <EEd total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period:
2/16/01
am m
Jurisd:
Year
Fort Coll' s
recent short long bkgrd total
Project
ID: 0106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
Eastbound
I Westbound
I Northbound
I Southbound I
L
T R
I L T
R
I L
T
R
I L T
R 1
No. Lanes
I 1
1 0
i 0 1
1
I 1
2
1
I 1 2
1 I
LGConfig
I L
TR
I LT
R
I L
T
R
i L T
R I
Volume
170
5 30
140 5
240
15
1220
55
1310 1360
20 1
Lane Width
112.0
12.0
I 12.0
12.0
112.0
12.0
12.0
112.0 12.0
12.0 1
RTOR Vol
I
0
I
0
I
0
I
0 1
Duration
0.25
Area
Type: All
other
areas
Signal
Operations
Phase Combination
1 2
3 4
1
5
6
7 8
EB Left
A
I NB
Left
A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
1
Peds
X
WB Left
A
I SB
Left
A
A
P
Thru
A
1
Thru
A
P
Right
A
1
Right
A
P
Peds
X
1
Peds
X
NB Right
I EB
Right
'
SB Right
I WB
Right
A
A
Green
26.0
6.0
8.0
49.0
Yellow
3.0
0.0
0.0
4.0
All Red
2.0
0.0
0.0
2.0
Cycle Length: 100.0
secs
Intersection Performance
Summary
_
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay
LOS
Eastbound
L 396
1321
0.03
0.30
24.7
C
TR 485
1671
0.03
0.29
25.5
C
25.2
C
Westbound
LT 412
1421
0.15
0.29
26.5
C
24.2
C
R 633
1583
0.53
0.40
23.7
C
Northbound
L 437
1770
0.06
0.61
8.2
A
T 1911
3539
0.72
0.54
14.5
B
14.3
B
R 855
1583
0.05
0.54
11.0
B
Southbound
L 261
1770
0.64
0.61
19.2
B
T 1911
3539
0.42
0.54
10.2
B
11.7
B
R 855
1583
0.07
0.54
11.1
B
Intersection Delay
= 14.8
(sec/veh) Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: .(970) 669-2061 Fax: (970) 66975034
E-Mail: mdelich@frii-com
OPERATIONAL ANALYSIS
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 2 16/01
Analysis Time Period: am m
Intersection: ollege/Fossil Creek/Cameron
Area Type: All other areas
Jurisdiction: Fort Col s
Analysis Year: recent hort long bkgr total
Project ID: 0106
East/West Street North/South Street
Fossil Creek/Cameron College
HCS2000: Signalized Intersections Release 4.1
Inter.: College/Fossil Creek/Cameron
Analyst: Michael
Matthew J. Delich, P.E.
Area Type: All other areas
Agency:
2/16/O1
Date: 2/
Jurisd: Fort Collins
Year recent or long bkgr total
Period Campm
Project ID: 0106
E/W St: Fossil Creek/Cameron
N/S St: College
SIGNALIZED INTERSECTION SUMMARY
► Eastbound I Westbound I Northbound I Southbound I
L T R I L
T R I L T R I L T R I
I I
I I
No. Lanes I 1 1 0 ► 0
-►
1 1 ► 1 2 1 I 1 2 1 I
L T R I L T R I
LGConfig 1 L TR I
- 5 10 155
LT R I
5 320 125 1.305 40 1160 755 55 1
Volume 110
Width 112.0 12.0 I
12.0 12.0 112.0 12.0 12.0 112.0 12.0 102A
Lane
0 I
0 I 0 I
RTOR Vol I
Duration 0.25
Phase Combination
1
EB Left
A
Thru
A
Right
A
Peds
X
WB Left
A
Thru
A
Right
A
Peds
X
NB Right
SB Right
Green
29.0
Yellow
3.0
All Red
2.0
Area Type: All other areas
Signal Operations 7 8
2 3 4 i 5 6
1 NB Left A P
1 Thru P
► Right P
► Peds X
1 SB Left A P
1 Thru P
i Right P
I Peds x
1 EB Right .
WB Right A
6.0 54.0
0.0 4.0
0..0 2.0
Cycle Length: 100.0
secs
APPENDIX A
105/200
10/15 —m-
30/60
T T.
JU')
10/5
o �
(D Lo
') = M
U) M O
CO a T
f 1
100/150
10/15
40/100
r
o Ln Ln
C1e N tz
Ln ti O
Lo oLO
� T
T
350/275
+ 5/10
65/50
Cameron `
35/85
10/5 Ln ,n LO
20/40 0 T- to
M O to
O
T
Fairway
f- AM/PM
Rounded to Nearest
5 Vehicles
Fossil Creek
LONG RANGE (2020) TOTAL
PEAK HOUR TRAFFIC
Figure 8
Fairway
J!!
-.a— -Denotes Lane
Fossil Creek
N
SHORT RANGE (2005) GEOMETRY
Figure 7
TABLE
Short Range (2006) Total Peak Hour Operation
College/Fossil Creek/Cameron
(signal)
OVERALL
B
B
College/Fairway
(stop sign)
WB LTIT
F
F
WB RT
C
C
WB APPROACH
D
F
EB LT
E
F.
EBT
F
F
EB RT
B
C
EB APPROACH
E
F
NB LT
B
C
SB LT
C
B
College/RT-in/RT-out
(stop sign)
EB RT
A
A
TABLE 6
Long Range (2020) Total Peak Hour Operation
Az. IM M
M
Nat
PIR i
M -- 9 --
I NO
College/Fossil Creek/Cameron
OVERALL
B
B
(signal)
College/Fairway
OVERALL
B
C
(signal)
College/RT-in/RT-out
EB RT
A
A
(stop sign)
Cameron
N
c
0
� U
O
O CC) O
co
LO
o 25/40
T CD M -00— 0/0
+ � � 15/35
35/35
010 i 0 LO LO
5/25 o �' o
T ('7
O N
co
81- T
T
O
CO
O O1
10/5
co 0
320/240
5/10
+ � � 55/40
35/85 T
10/5 —► Ul) o LO
20/40 o N o
T
M
T
Fairway
�— AM/PM
Rounded to Nearest
5 Vehicles
Fossil Creek
SHORT RANGE (2005) TOTAL
PEAK HOUR TRAFFIC
Figure 6
TABLE 2
Short Range (2005) Background Peak Hour Operation
Lq
College/Fossil Creek/Cameron
(signal)
OVERALL
B
B
WB LT/T
F
F
WB RT
C
C
WB APPROACH
D
F
EB LT
E
F
College/Fairway
(stop sign)
EB T
E
F
EB RT
B
C
EB APPROACH
D
F
NB LT
B
B
SB LT
C
B
TABLE 3
Long Range (2020) Background Peak Hour Operation
�ffi
yGiMMZ
OVERALL
B
B
College/Fossil Creek/Cameron
(signal)
College/Fairway
OVERALL
B
C
(signal)
I
I
85/190
10/15 —►
30/60
LO
o Lo
to LO
N;M
LO Ul)
0 N Co
f 1
a>
d
0
100/150
=-10/15
40/100
r
O O Un
L
0 o
LO o 0
M
00
350/275
—�— 5/5
65/50
Cameron
10170
`
5/5 —_
Ul)
LO
u.,
10/30
N
v
LO
rn
LO
rai way
AM/PM
Rounded to Nearest
5 Vehicles
Fossil Creek
14
N
LONG RANGE (2020) BACKGROUND Figure 5
PEAK HOUR TRAFFIC
c
0
Cameron
�n o
L0 v o
JT.- lrn c�L
/ f i
N
N
N
25/40
f 0/0
15/35
Fairway
15/25 T
0/0 0 0 Ln
5/25 U o
toCO
rn
UM)
r-
0
(o 0
0 e—
N \ Co
U) tU)CD
(O
Ju') i
—
10170
515 —►
10/30
320/240
—m-- 5/5
55/40
f r
Ln 0 (n
LO N t`
N
N � �O
O
M
--w— AM/PM
Rounded to Nearest
5 Vehicles
Fossil Creek
SHORT RANGE (2005) BACKGROUND Figure 4
PEAK HOUR TRAFFIC
TABLE I
Trip Generation
i?- m�ci-7
MfMx
e. M,R
North Area
220
Apartments
72 D.U.
6.63
1 477
1 0.08
6
0.43
31
0.42
30
0.20
14
South Area
220
Apartments
78 D.U.
6.63
517
0.08
6
0.43
34
0.42
33
0.20
16
710
Office
7.2 KSF
11-01
79
1.37
10
0.19
1
0.25
2
1.24
9
Subtotal
596
16
35
35
25
Total
1073
22
66
65
39
To Macon Street
Tnmpo�
�me+mvnr
meorwi
Link To Mawn
- k Cnerdnr
T
!9
to
Lr Te Flit v
NO SCALE
4
N
CREEK
SITE PLAN Figure 2
' N
N
N
L
W
m
N
O
U
Harmon
Redtail PDP
T
cc
E
d
J
Cameron
T
°ss,�
O,
rn
OD
N
cn
Trilby
SCALE: 1"=2000'
SITE LOCATION Figure 1
v
operation using the traffic forecasts shown in Figure 6. Calculation forms
are provided in Appendix C. The key intersections will operate similarly
to that shown with the background traffic. Figure 7 shows the short range
geometry at the key intersections.
Figure 8 shows the long range (2020) total peak hour traffic at the
key intersections. Table 5 shows the long range peak hour operation using
the traffic forecasts shown in Figure 8. Calculation forms are provided
in Appendix D. The key intersections will operate acceptably. Figure 9
shows the long range geometry at the key intersections.
In the staff comments, reference was made to the proximity of the
Cameron/Frontage Road intersection to College Avenue. This is an existing
situation. The close proximity does cause operational concerns regarding.
blockage of the Frontage Road by eastbound traffic on Cameron Drive
approaching College Avenue. This situation exists elsewhere in Fort
Collins. It is recommended that signs be placed stating "DO NOT BLOCK
INTERSECTION." Elimination of the Frontage Road does not appear to be an
option. The site plan for the Cameron Office Park shows a parking lot
connection between Cameron Drive and Coronado Court. This connection
provides an option of not using the Frontage Road by some of the traffic.
A comment was made regarding the consistency of traffic forecasts
with those in the "South College Avenue Access Control Plan." When
Kathleen Reavis was contacted in early 2001 regarding this document, she
provided information regarding the access points, but no information with
regard to traffic forecasts. Therefore, Mark Jackson was contacted to get
traffic forecasts. The peak hour forecasts in the transportation impact
study are consistent with those supplied by Mark Jackson.
Two additional pedestrian destinations were requested by Kathleen
Reavis. These are the Mason Street Corridor (park/ride station) and the
Werner Elementary School (east of College Avenue). Appendix E contains a
pedestrian level of service worksheet showing these two destinations. The
Mason Street Corridor will meet acceptable pedestrian level of service
criteria once the sidewalk system is built within Redtail and once the City
makes the necessary improvements related to the Mason Street Corridor
park/ride station. The pedestrian level of service cannot meet the minimum
criteria for all factors for the Werner Elementary School. This is
primarily due to street crossings and continuity. There are no sidewalks
in the Fossil Creek residential area east of College Avenue. This is a
county subdivision and sidewalks were not required, nor are they desired
by the residents. There is little that can be done to improve this.
Currently, bicycles use the shoulders along College Avenue as bike
lanes. Generally, this is considered to be safe for the few bicyclists
that use College Avenue. Where there are .striped acceleration or
deceleration lanes on College Avenue, the bicyclists share this area with
the motor vehicles. Since the bicycle traffic is low, this situation is
generally acceptable. When College Avenue is restriped to be a six -lane
facility, it is recommended that bicycles not be allowed to use College
Avenue. This recommendation is consistent with the "no bike" policy on
College Avenue north of Harmony Road.
MEMORANDUM
Co
REG/sr
Lo
PPpO
CD
o
TO: Jon Prouty, Lagunitas Companies o���-EWJ•Q�;c�`9
•
LO
Cathy Mathis, VF Ripley V� Q,
O
6
City of Fort Collins I� 152
o
O
FROM: Matt Delich
0
DATE: December 18, 2001 S/SAL
X
a
zu.
SUBJECT: Redtail PDP Transportation Impact Study Addendum
a
LU
(File: 0106ME01)
0
J
•
_
(D
The Redtail PDP, located east of the College/Fossil Creek/
w
>_
N
Cameron intersection, Figure 1, has been revised. Figure 2 shows the
0
�
new site plan. As indicated on Figure 2, access to the site has been
z
changed to include access to Fairway Lane to the north. In addition
W
to this, the proposed land uses have been changed. This addendum
S
addresses the staff comments contained in the Staff Project Review
Z
W
dated August 28, 2001. Contact. with Transportation Planning and
oTraffic
Operations indicated that a memorandum addressing the
n
comments and changes would be necessary.
N
r`
N
The new site plan shows that most of Redtail has been changed
to residential land uses. Table 1 shows the new trip generation
estimate for Redtail. There will be a reduction in the trip
generation compared to the previous Redtail plan. The peak hour trip
generation will be reduced by 20-30 percent. In addition to this,
the site plan shows that access to a portion of the site will be via
the College/Fairway intersection. This will reduce the amount of
traffic that will use the College/Fossil Creek/Cameron intersection.
Figure 3 shows the assignment of the site generated traffic at the
key intersections.
Figures 4 and 5 show the short range (2005) and long range
LU
(2020) background peak hour traffic at the key intersections. It is
expected that traffic signals would not be warranted at the College/
(L
z
Fairway intersection in the short range future. However, as further
¢
development occurs to the east and west, signals would likely be
Z
warranted at this intersection. The College/Fairway intersection is
"South
as a future signalized intersection on the College
Vshown
Z
Avenue Access Control Plan." The right-in/right-out access to
J
W
College Avenue is also shown on the "South College Avenue Access
W
o
Control Plan." Table 2 shows the operation of the key intersections
0
F
with the short range background peak hour traffic. Calculation forms
¢
are provided in Appendix A. The College/Fossil Creek/Cameron
'
0
intersection will operate acceptably. With the existing stop sign
a
y
control, the delays to the Fairway Lane legs of the College/Fairway
z
a
intersection will be commensurate with level of service D/E/F in the
H
peak hours. Table 3 shows the operation of the key intersections
W
as
with the long range background peak hour traffic. Calculation forms
V
are provided in Appendix B. With the warranted'signalization, the
akey
intersections will operate acceptably.
QFigure
6 shows the short range (2005) total peak hour traffic
at the key intersections. Table 4 shows the short range peak hour