HomeMy WebLinkAboutREDTAIL RESIDENTIAL - PDP - 26-01 - REPORTS - TRAFFIC STUDY (4)HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
7L18/02
Jurisd:
Fort Colli s
long bkgrd total
Period:
pm
Year
recent short
lam
Project
0106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
Eastbound
1 Westbound
I Northbound
I Southbound I
I L
T R
I L T R
I L T R
I L T R I
1 1
I
No. Lanes I 1
I
I
1 1 2 1 I
1 0
1 0 1 1
I 1 2 1
LGConfig I L
TR
I LT R
I L T
R I L TR I
Volume I10
5 10
155 5 320
125 1305 40
1160 755 55 1
Lane Width 112.0
12.0
I 12.0 12.0
112.0 12.0 12.0
112.0 12.0 12.0 I
RTOR Vol I
0
I 0
1 0
I 0 I
Duration 0.25
Area
Type: All other
areas
Signal Operations
Phase Combination
1 2
3 4 1
5
6 7 8
EB Left
A
I NB
Left A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
WB Left
A
I SB
Left A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
NB Right
I EB
Right
SB Right
I WB
Right A
Green
28.0
7.0
54.0
Yellow
3.0
0.0
4.0
All Red
2.0
0.0
2.0
Cycle
Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane
Adj Sat
Ratios
Lane Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c g/C
Delay LOS
Delay LOS
L 363
TR 469
Westbound
1251 0.03
1676 0.04
LT
395
1410
R
633
1583
Northbound
L
428
1770
T
1911
3539
R
855
1583
Southbound
L
251
1770
T
1911
3539
R
855
1583
Intersection Delay
0.29 25.5 C
0.28 26.2 C 25.9 C
0.17 0.28
0.57 0.40
0.07 0.62
0:80 0.54
0.05 0.54
27.4 C
24.5 C
25.0 C
8.0 A
16.8 B 16.4 B
11.0 B
0.73 0.62 33.0 C
0.45 0.54 10.6 B 14.3 B
0.07 0.54 11.2 B
16.9 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061
E-Mail: mdelich@frii.com
Fax: (970) 669-5034
OPERATIONAL ANALYSIS
4)
rn
m
0
100/150
--10/15
40/100
100/200
f
10/15 —■►
O
0
to
30/60
�
eo
LO10
o
L
rn
y
a `n
0
JI
10/5
or to
(0 LO
MLO
0 c` e) 00
(D )
f 1
350/275
f- 5/5
65/50
Cameron
25/80
`
5/5 —
U)
LO
LO
20/35
t
LO
N
0
Lo
O
CO
LONG RANGE (2020) TOTAL
PEAK HOUR TRAFFIC
Fairway
-• AM/PM
Rounded to Nearest
5 Vehicles
Fossil Creek
N
Figure 8
a HCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 7/18/02
Analysis Time Period: am pm
Intersection: ollege/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short long bkgrd total
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R L T R
Volume
980
5
Peak -Hour Factor, PHF
0.87
0.87
Hourly Flow Rate, HFR
1126
5
Percent Heavy Vehicles -- --
--
--
Median Type Undivided
RT Channelized?
No
Lanes
2 1
Configuration
T R
Upstream Signal? No
No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R I L T R
Peak Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade (�)
Median Storage
Flared Approach: Exists?
Storage
RT Channelized?
Lanes
Configuration
Approach
Movement
Lane Config
v (vph)
C(m) (vph)
v/c
95% queue length
Control Delay
LOS
Approach Delay
Approach LOS
0 0
1
R
0.85
11
2
No
lay, Queue Length, and Level of Service
NB SB Westbound Eastbound
1 4 1 7 8 9 1 10 11 12
I 1 R
HCS2000: Unsignalized Intersections Release 4.1b
9.2
A
867
0.01
0.04
9.2
A
Matthew J. Delich
Matthew J. Delich, P.E.
TABLE S.
Long Range (2020) Total Peak Hour Operation
M 94
EMO,- S.-mMM-A mlcihl
'Mli
College/Fossil Creek/Cameron
OVERALL
B
B
(signal)
College/Fairway
OVERALL
B
B
(signal)
College/Fossil Boulevard
EB RT
A
A
-(RT-in/RT-out)
Multimodal Transportation Level of Service Manual
LOS Standards for Development Review - Pedestrian
Figure 6. Pedestrian LOS Worksheet
P.
l 8
—
i
TA1JS(t F1 CU-"ry
)I . Gi /J0 7- C� (G r
City of Fort Collins Transportation Master Plan
r'
APPENDIX E
4 HCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 7/1�8/02
Analysis Time Period: am p Intersection: Col ege/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short ong bkgrd total
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 1.1/U 1D
Peak -Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 1442 15
Percent Heavy Vehicles -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 2 0
Configuration T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R I L T R
Volume
li
Peak Hour Factor,
PHF
0.95
Hourly Flow Rate,
HFR
15
Percent Heavy Vehicles
2 .
Percent Grade M
0 0
Median Storage
Flared Approach:
Exists?
Storage
RT Channelized?
No
Lanes
1
Configuration
R
Delay, Queue
Length, and Level of Service
Approach
NB SB
Westbound Eastbound
Movement
1 4
1 7 8 9 1 10 11
12
Lane Config
I
R
v (vph)
15
C(m) (vph)
809
v/c
0.02
95% queue length
0.06
Control Delay
9.5
LOS
A
Approach Delay
9.5
Approach LOS
A
HCS2000:.Unsignalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
•. HCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 7/18/02
Analysis Time Period: m
Intersection: ollege/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short ong bkgrd otal
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume 783 5
Peak -Hour Factor, PHF 0.95 0.95
Hourly Flow Rate, HFR 824 5
Percent Heavy Vehicles -- -- -- --
Median Type Undivided
RT Channelized?
Lanes 2 0
Configuration T TR
Upstream Signal? No No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 10
Peak Hour Factor, PHF 0.95
Hourly Flow Rate, HFR 10
Percent Heavy Vehicles 2
Percent Grade (o) 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1
Configuration R
Delay, Queue Length, and Level of Service
Approach. NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config I I R
v (vph) 10
C (m) (vph) 922
v/c 0.01
95% queue length 0.03
Control Delay 8.9
LOS A
Approach Delay 8.9
Approach LOS A
HCS2000: Unsignalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
HCS2000: Signalized Intersections Release 4.1b
i
Analyst: Michael Inter.: College/Fairway
Agency: Matthew J. Delich, P.E. Area Type: All other areas
Date: 7/1,�8/�02 Jurisd: Fort Collins
Period: am(*Year recent short En bkgrd tota
Project ID: 0106
E/W St: Fairway N/S St: College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound I
L T R I L T R I L T R I L T R I
I I I I I
No. Lanes I 1 1 1 I 1 1 0 I 1 3 0 I 1 3 0 I
LGConfig I L T R I L TR I L TR I L TR I
Volume 1200 15 60 1100 15 150 160 1720 75 I100 1895 130 1
Lane Width 112.0 12.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 1
RTOR Vol 1 0 I 0 1 0 1 0 1
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A P
Thru A I Thru P
Right A I Right P
Peds X I Peds X
WB Left A SB Left A P
Thru A Thru P
Right A Right P
Peds X I Peds X
NB Right I EB Right A
SB Right WB Right
Green 30.0 6.0 53.0
Yellow 3.0 0.0 4.0
All Red 2.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 323
T 559
R 649
Westbound
L 417
TR 483
Northbound
L 233
TR 2678
Southbound
L 233
TR 2669
1042 0.69 0.31 36.3 D
1863 0.03 0.30 24.7 C 31.7 C
1583 0.10 0.41 18.2 B
1345 0.27 0.31 26.3 C
1609 0.38 0.30 28.2 C 27.5
1770 0.27 0.60
5053 0.71 0.53
1770 0.45 0.60
5036 0.80 0.53
14.5 B
14.3 B 14.3
Le
B
14.3 B
16.4 B 16.3 B
Intersection Delay = 17.1 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fairway
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period:
am pm
718/02
Jurisd:
Year
Fort Collins
recent short ong bkgr total
Project
D- 0106
E/W St:
Fairway
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound I Westbound I Northbound I Southbound I
L T R I L T R I L T R I L T R I
I I I I I
No. Lanes I 1 1 1 I 1 1 0 I 1 3 0 I 1 3 0 1
LGConfig I L T R I L TR I L TR I L TR I
Volume 1100 10 30 140 10 100 155 1905 100 1100 1100 120 1
Lane Width 112.0 12.0 12.0 112.0 12.0 112.0 12.0 112.0 12.0 I
RTOR Vol 1 0 1 0 1 0 1 0 I
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A P
Thru A 1 Thru P
Right A I Right P
Peds X I Peds X
WB Left A I SB Left A P
Thru A I Thru P
Right A Right P
Peds X I Peds X
NB Right I EB Right A
SB Right I WB Right
Green 26.0 8.0 55.0
Yellow 3.0 0.0 4.0
All Red 2.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L
324
1200
0.34
0.27
30.0
C
T
484
1863
0.02
0.26
27.6
C 27.5 C
R
617
1583
0.05
0.39
19.0
B
Westbound
L
363
1346
0.12
0.27
27.7
C
TR
418
1609
0.29
0.26
30.0
C 29.4 C
Northbound
L 356 1770 0.16 0.64 7.6 A
TR 2776 5047 0.76 0.55 13.9 B 13.7 B
Southbound
L 270 1770 0.39 0.64 13.5 B
TR 2756 5010 0.47 0.55 9.8 A 10.1 B
Intersection Delay = 13.6 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period:
7/18 2
am
Jurisd:
Year
Fort Collins
recent short on bkgr tota
Project
ID: 0106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
Eastbound
I Westbound
I Northbound
I Southbound I
I L T R
I L T R
I L T R
I L T R I
No. Lanes
I
1 1 1 0
I
1 0 1 1
I
I 1 3 0
I I
1 1 3 0 I
LGConfig
I L TR
I LT R
I L TR
I L TR I
Volume
180 5 35
150 5 275
115 1505 65
1355 1670 35 1
Lane Width
112.0 12.0
1 12.0 12.0
112.0 12.0
112.0 12.0 1
RTOR Vol
1 0
1 0
1 0
1 0 1
Duration 0.25
Area Type: All other
areas
Signal Operations
Phase Combination
1
2 3 4 1
5
6
7 8
EB Left
A
I NB
Left
A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
WB Left
A
I SB
Left
A
A
P
Thru
A
I
Thru
A
P
Right
A
I
Right
A
P
Peds
X
I
Peds
X
NB Right
I EB
Right
SB Right
I WB
Right
A
A
Green
24.0
6.0
10.0
50.0
Yellow
3.0
0.0
0.0
3.0
All Red'
2.0
0.0
0.0
2.0
Cycle
Length: 100.0
Intersection
Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay LOS
Eastbound
L 313
1250
0.28
0.25
30.8
C
TR 389
1621
0.12
0.24
29.8
C
30.5 C
Westbound
LT 331
1378
0.19
0.24
30.5
C
21.1 C
R 712
1583
0.43
0.45
19.2
B
Northbound
L 310
1770
0.05
0.58
9.0
A
TR 2527
5054
0.65
0.50
15.6
B
15.5 B
Southbound
L 410 1770 0.91 0.67 52.8 D
TR 3042 5070 0.59 0.60 7.4 A 15.3 B
Intersection Delay = 16.3 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
secs
OPERATIONAL ANALYSIS
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date: 7/18/02
Period ai pm
Jurisd:
Year :
Fort Collins
recent short ong bkgr tota
Project
ID: 0106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
1 .L T R
No. Lanes I 1 1 0
LGConfig I L TR
Volume 125 5 20
Lane Width 112.0 12.0
RTOR Vol 1 0
I Westbound
I L T R
1
1 0 1 1
I LT R
165 5 350
I 12.0 12.0
I 0
I Northbound
I L T R
I
I 1 3 0
I L TR
125 1600 55
112.0 12.0
I 0
I Southbound I
I L T R I
I I
1 1 3 0 I
I L TR I
1185 935 60 1
112.0 12.0 I
I 0 I
Duration 0.25
Area
Type: All other
areas
Signal Operations
Phase Combination
1 2
3 4 1
5
6 7 8
EB Left
A
I NB
Left A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
WB Left
A
I SB
Left A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
NB Right
I EB
Right
SB Right
I WB
Right A
Green
30.0
8.0
51.0
Yellow
3.0
0.0
4.0
All Red
2.0
0.0
2.0
Cycle
Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane
Adj Sat
Ratios
Lane Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c g/C
Delay LOS
Delay LOS
Eastbound
L 380
1226
0.07 0.31
24.4 C
TR 493
1643
0.06 0.30
25.0 C
24.7 C
Westbound
LT 414
1380
0.19
0.30
26.2
C 23.3
C
R 681
1583
0.57
0.43
22.7
C
Northbound
L 387
1770
0.07
0.60
8.7
A
TR 2581
5060
0.67
0.51
15.2
B 15.1
B
Southbound
L 269
1770
0.72
0.60
30.0
C
TR 2570
5039
0.41
0.51
11.9
B 14.7
B
Intersection
Delay
= 16.2
(sec/veh)
Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich; P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
APPENDIX D
HCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 7/18/02
Analysis Time Period: am �pm�
Intersection: Col ege/RT-in/RT-out
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: hort long bkgrd total
Project ID: 0106
East/West Street: RT-in/RT-out
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R L T R
Volume 1
1705
15
Peak -Hour Factor, PHF
0.90
0.90
Hourly Flow Rate, HFR
1894
16
Percent Heavy Vehicles -- --
--
--
Median Type Undivided
RT Channelized?
No
Lanes
2 1
Configuration
T R
Upstream Signal? No
No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume 5
Peak Hour Factor, PHF 0.85
Hourly Flow Rate, HFR 5
Percent Heavy Vehicles 2
Percent Grade M 0 0
Median Storage
Flared Approach: Exists?
Storage
RT Channelized? No
Lanes 1
Configuration R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 1 10 11 12
Lane Config I 1 R
v tvpn/
i
C(m) (vph)
735
v/c
0.01
95% queue length
0.02
Control Delay
9.9
LOS
A
Approach Delay
9.9
Approach LOS
A
HCS2000: Unsignalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
HCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 7/1 2
Analysis Time Period: am
Intersection: College/Fairway
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: shor long bkgrd otal
Project ID: 0106
East/West Street: Fairway
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
20
1510
15
30
1645
30
Peak -Hour Factor, PHF
0.92
0.92
0.92,
0.90
0.90
0.90
Hourly Flow Rate, HFR
21
1641
16
33
1827
33
Percent Heavy Vehicles
2
--
--
2
--
--
Median Type TWLTL
RT Channelized?
No
No
Lanes
1
2 1
1
2 1
Configuration
L
T R
L
T R
Upstream Signal?
Yes
No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume
35
0
40
35
0
25
Peak Hour Factor,
PHF
0.85
0.85
0.85
0.85
0.85
0.85
Hourly Flow Rate,
HFR
41
0
47
41
0
29
Percent Heavy Vehicles
2
2
2
2
2
2
Percent Grade (%)
0
0
Median Storage
1
Flared Approach:
Exists?
Storage
RT Channelized?
No
No
Lanes
0 1 1
1 1
1
Configuration
LT R
L T
R
Delay,
Queue
Length, and Level
of
Service
Approach
NB
SB
Westbound
Eastbound
Movement
1
4
1 7 8
9
I 10
11
12
Lane Config
L
L
I LT
R
I L
T
R
v (vph)
21
33
41
47
41
0
29
C(m) (vph)
321
474
92
828
57
64
276
v/c
0.07
0.07
0.45
0.06
0.72
0.00
0.11
95% queue length
0.21
0.22
1.87
0.18
3.05
0.00
0.35
Control Delay
17.0
13.2
72.4
9.6
161.3
61.3
19.6
LOS
C
B
F
A
F
F
C
Approach Delay
38.9
102.6
Approach LOS
E
F
HCS2000: Unsignalized Intersections Release 4.1b
Michael P. Delich
Matthew J. Delich, P.E.
tHCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 7/18/02
Analysis Time Period: m)pm
Intersection: ollege/Fairway
Jurisdiction: Fort Collins
Units: U. S.,Customary
Analysis Year: short long bkgrd total'
Project ID: 0106
East/West Street: Fairway
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
10
1610
30
30
955
15
Peak -Hour Factor, PHF
0.85
0.85
0.85
0.87 0.87
0.87
Hourly Flow Rate, HFR
11
1894
35
34
1097
17
Percent Heavy Vehicles
2
--
--
2
--
--
Median Type TWLTL
RT Channelized?
No
No
Lanes
1
2 1
1 2 1
Configuration
L
T R
L T R
Upstream Signal?
Yes
No
Minor Street: Approach
Westbound
Eastbound
Movement
7
8
9
1 10
11
12
L
T
R
I L
T
R
Volume
15
0
25
30
0
5
Peak Hour Factor,
PHF
0.85
0.85
0.85
0.85
0.85
- 0.85
Hourly Flow Rate,
HFR
17
0
29
35
0
5
Percent Heavy Vehicles
2
2
2
2
2
2
Percent Grade M
0
0
Median Storage
1
Flared Approach:
Exists?
Storage
RT Channelized?
Lanes
Configuration
0
No
1 1
LT R
1 1
L T
No
1
R
Delay,
Queue Length, and Level
of
Service
Approach
NB
SB
Westbound
Eastbound
Movement
1
4 1
7 8
9
I 10
11
12
Lane Config
L
L I
LT
R
L
T
R
v (vph)
11
34
17
29
35
0
5 .
C(m) (vph)
623
353
96
807
145
81
480
v/c
0.02
0.10
0.18
0.04
0.24
0.00
0.01
95% queue length
0.05
0.32
0.61
0.11
0.90
0.00
0.03
Control Delay
10.9
16.3
50.4
9.6
37.6
49.4
12.6
LOS
B
C
F
A
E
E
B
Approach Delay
24.7
34.4
Approach LOS
C
D
HCS2000: Unsignalized Intersections Release 4.1b
Michael P. Delich
Matthew J. Delich, P.E.
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period:
7/18 02
am
Jurisd:
Year
Fort Coll' s
recent hort long bkgr otal
Project
ID: 0106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound
I L T R
I L T R
I L T
R
I L T
I
R 1
I
No. Lanes
I
I 1 1 0
I
1 0 1 1
I
I 1 2
1
I 1 2
1 1
LGConfig
I L TR
I LT R
I L T
R
I L T
R I
Volume
180 5 35
140 5 240
115 1230
55
1310 1365
35 1
Lane Width
112.0 12.0
I 12.0 12.0
112.0 12.0
12.0
112.0 12.0
12.0 1
RTOR Vol
1 0
I 0
1
0
1
0 1
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A P
Thru A I Thru P
Right A I Right P
Peds X I Peds X
WB Left A I SB Left A A P
Thru A I Thru A P
Right A I Right A P
Peds X I Peds X
NB Right I EB Right
SB Right I WB Right A A
Green 25.0 6.0 10.0 48.0
Yellow 3.0 0.0 0.0 4.0
All Red 2.0 0.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L
336
1294
0.28
0.26
30.0
C
TR
405
1619
0.12
0.25
29.1
C
29.7
C
Westbound
LT
353
1411
0.15
0.25
29.4
C
19.9
B
R
728
1583
0.39
0.46
18.1
B
Northbound
L
333
1770
0.05
0.56
10.4
B
T
1699
3539
0.79
0.48
21.1
C
20.7
C
R
760
1583
0.08
0.48
14.3
B
Southbound
L
411
1770
0.84
0.65
41.7
D
T
2053
3539
0.74
0.58
11.0
B
16.6
B
R
918
1583
0.04
0.58
9.1
A
Intersection
Delay
= 18.9
(sec/veh)
Intersection
LOS = B
HCS2000: Signalized
Intersections
Release
4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period:
7/18/02
Opm
Jurisd:
Year
Fort Col s
recent short long bkgrd otal
Project
ID: 0106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
1 Eastbound
I Westbound
I Northbound
I Southbound I
1 L
T R
I L T R
I L
T
R
I L T
I
R I
I
No. Lanes
1
1
1
I
1 1
2
1
1 2
I 0 1 1
1 1
1 0
LGConfig
I L
TR
I LT R
I L
T
R
I L T
R I
Volume
125
5 20
155 5 320
125
1310
40
1160 765
60 1
Lane Width
112.0
12.0
I 12.0 12.0
112.0
12.0
12.0
112.0 12.0
12.0 1
RTOR Vol
1
0
I 0
I
0
I
0 I
Duration
0.25
Area
Type: All other
areas
Signal Operations
Phase Combination
1 2
3 4 1
5
6 7
8
EB Left
A
I NB
Left
A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
1
Peds
X
WB Left
A
I SB
Left
A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
NB Right
I EB
Right
SB Right
I WB
Right
A
Green
28.0
7.0
54.0
Yellow
3.0
0.0
4.0
All Red
2.0
M
2.0
Cycle
Length: 100.0 secs
Intersection
Performance
Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay LOS
Eastbound
L 363
1251
0.08
0.29
25.9
C
TR 459
1639
0.07
0.28
26.5
C
26.2 C
Westbound
LT 391
1395
0.17
0.28
27.5
C
25.0 C
R 633
1583
0.57
0.40
24.5
C
Northbound
L 424
1770
0.07
0.62
8.0
A
T 1911
3539
0.81
0.54
16.9
B
16.6 B
R 855
1583
0.05
0.54
11.0
B
Southbound
L 251
1770
0.73
0.62
33.0
C
T 1911
3539
0.46
0.54
10.7
B
14.3 B
R 855
1583
0.08
0.54
11.2
B
Intersection Delay
= 17.1
(sec/veh)
Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
APPENDIX C
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fairway
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
7/11 /02
Jurisd:
Fort Collins
Period:
am
Year
recent short(En bkgr total
Project
ID: 0106
E/W St:
Fairway
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound I
L T R
I L T R
I L T R
I L T R I
I I
No. Lanes
I
I
I
1 1 3 0
I 1 1 1
I 1 1 0
1 17 3 0
LGConfig
I L T R
I L TR
I L TR
I L TR
Volume
1190 15 60
I100 15 150
150 1710 75
I100 1865 125 1
Lane Width
112.0 12.0 12.0
112.0 12.0
112.0 12.0
112.0 12.0 I
RTOR Vol
1 0
1 0
1 0
1 0 I
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A P
Thru A Thru P
Right A I Right P
Peds X I Peds X
WB Left A I SB Left A P
Thru A I Thru P
Right A I Right P
Peds X I Peds X
NB Right I EB Right A
SB Right I WB Right
Green 30.0 6.0 53.0
Yellow 3.0 0.0 4.0
All Red 2.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 323
T 559
R 649
Westbound
L 417
TR 483
Northbound
L 233
TR 2678
1042 0.65 0.31 34.5 C
1863 0.03 0.30 24.7 C
1583 0.10 0.41 18.2 B
1345 0.27 0.31 26.3 C
1609 0.38 0.30 28.2 C
30.3 C
27.5 C
1770 0.23 0.60 13.7 B
5053 0.70 0.53 14.2 B 14.2 B
Southbound
L 233 1770 0.45 0.60 14.2 B
TR 2670 5037 0.78 0.53 16.0 B 15.9 B
Intersection Delay = 16.8 (sec/veh) Intersection LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland,.CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fairway
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period:
7 18/02
am m
Jurisd:.Fort
Year
Collins
recent short lon kgrd total
Project
ID: 0106
E/W St:
Fairway
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
I Eastbound
I Westbound
I Northbound
I Southbound I
I L
T R
I L T,
R
I L
T R
I L T R I
I I
I
No. Lanes I 1
I
I
1 1
I 1 1
0
I 1
3 0
I 1 3 0 I
LGConfig I L
T R
I L TR
I L
TR
I L TR I
Volume 185
10 30
140 10
100
150 1890 100 1100 1090 120 1
Lane Width 112.0
12.0 12.0
112.0 12.0
112.0 12.0
112.0 12.0 1
RTOR Vol 1
0
1
0
1
0
0 1
Duration 0.25
Area
Type: All
other
areas
Signal
Operations
Phase Combination
1 2
3
4 1
5
6 7 8
EB Left
A
I NB
Left
A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
WB Left
A
I SB
Left
A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
I
Peds
X
NB Right
I EB
Right
A
SB Right
I WB
Right
Green
26.0
8.0
55.0
Yellow
3.0
0.0
4.0
All Red
2.0
0.0
2.0
Cycle
Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane
Adj Sat
Ratios
Lane
Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c
g/C
Delay
LOS
Delay LOS
Eastbound
L 324
1200
0.29
0.27
29.4
C
T 484
1863
0.02
0.26
27.6
C
26.8 C
R 617
1583
0.05
0.39
19.0
B
Westbound
L 363
1346
0.12
0.27
27.7
C
TR 418
1609
0.29
0.26
30.0
C
29.4 C
Northbound
L 358
1770
0.15
0.64
7.5
A
TR 2776
5047
0.75
0.55
13.7
B
13.6 B
Southbound
L 270
1770
0.39
0.64
13.4
B
TR 2756
5010
0.46
0.55
9.8
A
10.1 B
Intersection Delay
= 13.5
(sec/veh)
Intersection LOS = B
HCS2000: Signalized
Intersections
Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
HCS2000: Signalized Intersections Release 4.1b
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
7/18 02
Jurisd:
Fort Collins
Period:
am pm
Year
recent short ong kgrd total
Project
ID: 106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
I' Eastbound
I Westbound
I Northbound
I Sbuthbound I
I L T R
I L T R
I L T R
I L T R I
No. Lanes
I
I 1 1 0
I
1 0 1 1
I
I 1 3 0
I I
I 1 3 0 1
LGConfig
I L TR
I LT R
I L TR
I L TR I
Volume
170 5 30
150 5 275
15 1495 65
1355 1665 20 1
Lane Width
112.0 12.0
1 12.0 12.0
112.0 12.0
112.0 12.0 I
RTOR Vol
1 0
1 0
1 0
1 0 I
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A P
Thru A I Thru P
Right A I Right P
Peds X I Peds X
WB Left A I SB Left A A P
Thru A I Thru A P
Right A I Right A P
Peds X I Peds X
NB Right I EB Right
SB Right I WB Right A A
Green 24.0 6.0 10.0 50.0
Yellow 3.0 0.0 0.0 3.0
All Red 2.0 0.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay LOS
Eastbound
L 313 1250 0.25 0.25 30.4 C
TR 390 1626 0.10 0.24 29.7 C 30.2 C
Westbound
LT 332
1385
0.19
0.24
30.5
C 21.1
C
R 712
1583
0.43
0.45
19.2
B
Northbound
L 314
1770
0.02
0.58
8.9
A
TR 2527
5054
0.65'
0.50
15.5
B 15.5
B
Southbound
L 410
1770
0.91
0.67
52.8
D
TR 3046
5076
0.58
0.60
7.4
A 15.3
B
Intersection
Delay
= 16.3
(sec/veh)
Intersection
LOS = B
HCS2000: Signalized Intersections Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
HCS2000: Signalized Intersections Release 4.1b
Analyst: Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period
718/02
a pm
Jurisd:
Year :
Fort Collins
recent short on kgrd total
Project
D• 0106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
1 Eastbound
I Westbound
I Northbound
I Southbound I
L T R
I L T R
I L T R
I L T R I
I I
No. Lanes
I
1 1 1 0
I
I 0 1 1
I
1 1 3 0
1 1 3 0 I
LGConfig
I L TR
I LT R
I L TR
I L TR I
Volume
I10 5 10
165 5 350
125 1595 55
1185 925 55 I
Lane Width
112.0 12.0
1 12.0 12.0
112.0 12.0
112.0 12.0 I
RTOR Vol
1 0
1 0
1 " 0
1 0 I
Duration 0.25 Area Type: All other areas
Signal Operations
Phase Combination 1 2 3 4 1 5 6 7 8
EB Left A I NB Left A P
Thru A I Thru P
Right A I Right P
Peds X I Peds X
WB Left A I SB Left A P
Thru A I Thru P
Right A I Right P
Peds X I Peds X
NB Right I EB Right
SB Right I WB Right A
Green 30.0 8.0 51.0
Yellow 3.0 0.0 4.0
All Red 2.0 0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane Adj Sat Ratios Lane Group Approach
Lane Group Flow Rate
Grp Capacity (s) v/c g/C Delay LOS Delay.LOS
Eastbound
L 380 1226 0.03 0.31 24.1 C
TR 505 1682 0.03 0.30 24.8 C 24.5 C
Westbound
LT
418
1394
0.19
0.30
26.2
C 23.3 C
R
681
1583
0.57
0.43
22.7
C
Northbound
L
391
1770
0.07
0.60
8.7
A
TR
2581
5060
0.67
0.51
15.1
B 15.1 B
Southbound
L
269
1770
0.72
0.60
30.0
C
TR
2571
5042
0.40
0.51
11.8
B 14.7 B
Intersection
Delay = 16.1
(sec/veh)
Intersection LOS = B
HCS2000:
Signalized
Intersections
Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
APPENDIX B
Table 4-3
Fort C;oiitns motor vehicle LOU stanciarcis (intersections
Commercial, Other corridors within
lntersecUon type Mixed use Low density mixed; All other.
districts I use residential areas
Stop sign control
(arteriat/local�—any
Stop sign control.
(collectorflocal--
mitigating measures required
considered normal in an urban environment
Page 4-22 Larimer County Urban Area Street Standard
January 2,2001
HCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst: Michael
Agency/Co.: Matthew J. Delich, P.E.
Date Performed: 7/18/02
Analysis Time Period: an tpm
Intersection: Co ege/Fairway
Jurisdiction: Fort Collins
Units: U. S. Customary
Analysis Year: short long bkgrd otal
Project ID: 0106
East/West Street: Fairway
North/South Street: College
Intersection Orientation: NS Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
10
1500
15
30
1615
25
Peak -Hour Factor, PHF
0.92
0.92
0.92
0.90
0.90
0.90
Hourly Flow Rate, HFR
10
1630
16
33
1794
27
Percent Heavy Vehicles
2
--
--
2
--
--
Median Type TWLTL
RT Channelized?
No
No
Lanes
1
2 1
1
2 1
Configuration
L
T R
L
T R
Upstream Signal?
Yes
No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 1 10 11 12
L T R I L T R
Volume
35
0
40
25
0
25
Peak Hour Factor,
PHF
0.85
0.85
0.85
0.85
0.85
0.85
Hourly Flow Rate,
HFR
41
0
47
29
0
29
Percent Heavy Vehicles
2
2
2
2
2
2
Percent Grade (%)
0
0
Median Storage
1
Flared Approach:
Exists?
Storage
RT Channelized?
No
No
Lanes
0
1 1
1
1 1
Configuration
LT
R
L
T R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 10 11 12
Lane Config L L I LT R I L T R
v (vph)
10
33
41
47
29
0
29
C(m) (vph)
332
478
101
831
60
68
283
v/c
0.03
0.07
0.41
0.06
0.48
0.00
0.10
95% queue length
0.09
0.22
1.68
0.18
1.89
0.00
0.34
Control Delay
16.2
13.1
63.1
9.6
111.7
57.9
19.2
LOS
C
B
F
A
F
F
C
Approach Delay
34.5
65.5
Approach LOS
D
F
HCS2000: Unsignalized Intersections Release 4.1b
Michael P. Delich
Matthew J. Delich, P.E.
HCS2000: Unsignalized Intersections Release 4.1b
TWO-WAY STOP CONTROL SUMMARY
Analyst:
Michael
Agency/Co.:
Matthew J. Delich, P.E.
Date Performed:
7 18/02
Analysis Time Period:
am m
Intersection:
ollege/Fairway
Jurisdiction:
Fort Collins
Units: U. S. Customary
Analysis Year: short long bkgrd total
Project ID: 0106
East/West Street:
Fairway
North/South Street: College
Intersection Orientation: NS
Study period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street: Approach Northbound Southbound
Movement 1 2 3 1 4 5 6
L T R I L T R
Volume
5
1595
30
30
945
15
Peak -Hour Factor,'PHF
0.85
0.85
0.85
0.87
0.87
0.87
Hourly Flow Rate, HFR
5
1876
35
34
1086
17
Percent Heavy Vehicles
2
--
--
2
--
--
Median Type TWLTL
RT Channelized?
No
No
Lanes
1
2 1
1
2 1
Configuration
L
T R
L
T R
Upstream Signal?
Yes
No
Minor Street: Approach Westbound Eastbound
Movement 7 8 9 I 10 11 12
L T R I L T R
Volume
Peak Hour Factor, PHF
Hourly Flow Rate, HFR
Percent Heavy Vehicles
Percent Grade M
Median Storage 1
Flared Approach: Exists?
Storage
15
0
25
15
0
5
0.85
0.85
0.85
0.85
0.85
0.85
17
0
29
17
0
5
2
2
2
2
2
2
0
0
RT Channelized? No No
Lanes 0 1 1 1 1 1
Configuration LT R L T R
Delay, Queue Length, and Level of Service
Approach NB SB Westbound Eastbound
Movement 1 4 1 7 8 9 I 10 11 12
Lane Config L L I LT R I L T R
v (vph)
5
34
17
29
17
0
5
C(m) (vph)
629
360
102
807
149
85
484
v/c
0.01
0.09
0.17
0.04
0.11
0.00
0.01
95% queue length
0.02
0.31
0.57
0.11
0.38
0.00
0.03
Control Delay
10.8
16.0
47.2
9.6
32.2
47.4
12.5
LOS
B
C
E
A
D
E
B
Approach Delay
23.5
27.8
Approach LOS
C
D
HCS2000
Unsignalized Intersections Release 4.1b
Michael P. Delich
Matthew J. Delich, P.E.
HCS2000: Signalized Inte=sections Release 4.1b
Analyst:
Michael
Inter.:
College/Fossil Creek/Cameron
Agency:
Matthew J. Delich, P.E.
Area Type: All other areas
Date:
Period:
7/18/02
am m
Jurisd:
Year
Fort Coll' s
recent hor.lon bkgr total
Project
ID�"O106
E/W St:
Fossil Creek/Cameron
N/S St:
College
SIGNALIZED INTERSECTION SUMMARY
Eastbound
L T. R
I
I Westbound
I L T R
I
1 Northbound
I L T R
1
I Southbound I
I L T R I
I I
No. Lanes I 1
1 0
1 0 1 1
1 1 2 1
1 1 2 1 1
LGConfig I L
TR
I LT R
I L T
R I L T R I
Volume 170
5 30
140 5 240
15 1220 55
1310 1360 20 1
Lane Width 112.0
12.0
I 12.0 12.0
112.0 12.0 12.0
112.0 12.0 12.0 1
RTOR Vol I
0
I 0
1 0
I 0 I
Duration 0.25
Area
Type: All other
areas
Signal Operations
Phase Combination
1 2
3 4 1
5
6 7 8
EB Left
A
I NB
Left A
P
Thru
A
I
Thru
P
Right
A
I
Right
P
Peds
X
1
Peds
X
WB Left
A
I SB
Left A
A P
Thru
A
I
Thru
A P
Right
A
I
Right
A P
Peds
X
I
Peds
X
NB Right
1 EB
Right
SB Right
I WB
Right A
A
Green
25.0
6.0
10.0 48.0
Yellow
3.0
0.0
0.0 4.0
All Red
2.0
0.0
0.0 2.0
Cycle Length: 100.0 secs
Intersection Performance Summary
Appr/ Lane
Adj Sat
Ratios
Lane Group
Approach
Lane Group
Flow Rate
Grp Capacity
(s)
v/c g/C
Delay LOS
Delay LOS
Eastbound
L 336 1294 0.24 0.26 29.6 C
TR 406 1624 0.10 0.25 29.0 C 29.4 C
Westbound
LT
354
1417
0.15
0.25
29.4
C 19.9 B
R
728
1583
0.39
0.46
18.1
B
Northbound
L
334
1770
0.01
0.56
10.3
B
T
1699
3539
0.78
0.48
20.8
C 20.5 C
R
760
1583
0.08
0.48
14.3
B
Southbound
L
411
1770
0.84
0.65
41.7
D
T
2053
3539
0.74
0.58
11.0
B 16.6 B
R
918
1583
0.02
0.58
9.0
A
Intersection
Delay = 18.8
(sec/veh)
Intersection LOS = B
HCS2000:
Signalized
Intersections
Release 4.1b
Matthew J. Delich
Matthew J. Delich, P.E.
2272 Glen Haven Drive
Loveland, CO 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
E-Mail: mdelich@frii.com
OPERATIONAL ANALYSIS
APPENDIX A
Cameron
Fairway
� - Denotes Lane
Fossil Creek
N
LONG RANGE (2020) GEOMETRY Figure 9
Jll�
Cameron
4)
rn
m
0
U
111
Fairway
- 0 - Denotes Lane
Fossil Creek
SHORT RANGE (2005) GEOMETRY . Figure 7
TABLE 4
Short Range (2005) Total Peak Hour Operation
R N� M
......... . . . . .
IN
College/Fossil Creek/Cameron
(signal)
OVERALL
B
B
College/Fairway
(stop sign)
WB LT/T
F
F
WB RT
A
A
WB APPROACH
C
E
EB LT
E
F
EBT
E
F
EB RT
B
C
EB APPROACH
D
F
NB LT
B
C
SB LT
C
B
College/Fossil Boulevard
(RT-in/RT-out)
EB RT
A
A
rn
A&
m
LO U
N
Ir
O O
Q L o 25/40
0) M �— 0/0
+ � � 15/35
r Fairway
30/35 --)� I}
0/0 o O_ U')
5/25 o to o
M.
O
LO CO
C)
O
Co
LO O
f- AM/PM
Rounded to Nearest
10/5
5 Vehicles
L
co O
LO CO
o LO �
320/240
c° h
+ �
�-- 5/10
55/40
�
Cameron /
25/80
` / Fossil Creek
5/5
20/35
,n O ,n
, � N o
N '4f
M
SHORT RANGE (2005) TOTAL Figure 6
PEAK HOUR TRAFFIC
TABLE 2
Short Range (2005) Background Peak Hour Operation
p-, �p
'4
College/Fossil Creek/Cameron
(signal)
OVERALL
B
B
College/Fairway
(stop sign)
WB LT/T
E
F
WB RT
A
A
WB APPROACH
C
D
EB LT
D
F
EBT
E
F
EB RT
B
C
EB APPROACH
D
F
NB LT
B
C
SB LT
C
B
TABLE 3
Long Range (2020) Background Peak Hour Operation
yp
TWIN
211
WIT �TA,
-=��- '. -
College/Fossil Creek/Cameron
OVERALL
B B
(signal)
College/Fairway
OVERALL
B B
(signal)
I
LO
0
LO N o
CV O
N 0) O
f 1
85/190
10/15 —�
30/60
0
(0 LO
0 LO
N M
LO LO
LO N O
LO )
f 1
rn
0
100/150
10/15
40/100
t r
0 0 0
o � o
Lo 0
o -
rn
co
350/275
5/5
65/50
Cameron
10170
`
5/5 —;
0
0
10/30
N
v
LO
�.
LLo
M
0
LONG RANGE (2020) BACKGROUND
PEAK HOUR TRAFFIC
Fairway
AM/PM
Rounded to Nearest
5 Vehicles
Fossil Creek
N
Figure 5
L0
Ln C
LO v o
rJ- ) c)
f i
m416. rn
N
25/40
0/0
15/35
15/25
Fairway
010
0
C
Ln
5/25
�
o
to
01
LO
0
cmcf) C
C
to
320/240
�
`IO r-
5/5
55/40
Cameron
10R0
5/5 —
10/30
Ir
LO0LO
N N 0
C
co
SHORT RANGE (2005) BACKGROUND
PEAK HOUR TRAFFIC
�— AM/PM
Rounded to Nearest
5 Vehicles
Fossil Creek
Figure 4
l
Site
� 1
Cameron
—ow— AM/PM
Fairway
Fossil Creek
N
SITE GENERATED PEAK HOUR TRAFFIC Figure 3
TABLE I
Trip Generation
, - IHE'"gt4z
A�RR
VA gggr
North Area
230
Townhome
68 D.U.
5.86
1 398
1 0.07
5
0.37
25
0.36
25
0.18
12
South Area
230
Townhome
64 D.U.
5.86
375
0.07
4
0.37
24
0.36
23
0.18
12
Total
M
9
49
48
24
L .
�FAI
ii
O
I iml IrFr*lh---C
-
SITE PLAN
C
F
H
N
NO SCALE
20�c
Tj B
F
c
A
v MgWn I
FOSSIL BM"ARD Rig -Out
I
j
1
13 2
FOSS"EEK OFFICE PARK COftONADOCOURT
0
8 0
CAMERON PK OFFICE AK
2 ......
Figure 2
N
N
V
N
L
N
N
O
U
Harmon
Redtail PIDIP
w
E
4)
J
Cameron
os,
/
co
N
Trilby
SCALE: 1 "=2000'
SITE LOCATION Figure 1
A comment was made regarding the consistency of traffic forecasts
with those in the "South College Avenue (US287) Access Control Plan Update
Report." When Kathleen Reavis was contacted in early 2001 regarding this
document, she provided information regarding the access points, but no
information with regard to traffic forecasts. Therefore, Mark Jackson was
contacted to get traffic forecasts. The peak hour forecasts in the
transportation impact study are consistent with those supplied by Mark
Jackson.
Two additional pedestrian destinations were requested by City staff.
These are the Mason Street Corridor (park/ride station) and the Werner
Elementary School (east of College Avenue). Appendix E contains a
pedestrian level of service worksheet showing these two destinations. The
Mason Street Corridor will meet acceptable pedestrian level of service
criteria once the sidewalk system is built within Redtail and once the City
makes the necessary improvements related to the Mason Street Corridor
park/ride station. The pedestrian level of service cannot meet the minimum
criteria for all factors for the Werner Elementary School. This is
primarily due to street crossings and continuity. There are no sidewalks
in the Fossil Creek residential area east of College Avenue. This is a
county subdivision and sidewalks were not required, nor are they desired
by the residents. There is little that can be done to improve this. When
the raised median is built by the City/CDOT in South College Avenue, the
street crossing factor will be acceptable.
Currently, bicycles use the shoulders along College Avenue as bike
lanes. Generally, this is considered to be safe for the few bicyclists
that use College Avenue. Where there are striped acceleration or
deceleration lanes on College Avenue, the bicyclists share this area with
the motor vehicles. Since the bicycle traffic is low, this situation is
generally acceptable. When College Avenue is restriped to be a six -lane
facility, it is recommended that bicycles not'be allowed to use College
Avenue. This recommendation is consistent with the "no bike" policy on
College Avenue north of Harmony Road.
Traffic volumes on Fossil Boulevard (RT-in/RT-out) will be less than
1000 vehicles per day. This indicates that Fossil Boulevard should be
classified as a residential, local street. Traffic volumes on Cameron
Drive, just west of South College Avenue, will be 1500-2000 vehicles per
day. These volumes are commensurate with that of a connector, local
street. Traffic volumes will progressively decrease on Cameron Drive, to
the west, toward the south portion of Redtail. In the new segment of
Cameron Drive (to be.constructed with this development), traffic volumes
will be less than 1000 vehicles per day. This indicates that the new
segment of Cameron Drive should be classified as a residential, local
street.
0
intersection will be commensurate with level of service D/E/F in the peak
hours. This intersection is in a commercial corridor. The Fort Collins
Motor vehicle LOS Standards (Intersections), also provided in Appendix A,
indicates that the level of service at a stop sign controlled intersection
is N/A (not applicable). It is assumed that, when signal warrants are met,
this intersection will be signalized. Until that. .occurs, the
calculated/actual operation is deemed to be acceptable. Table 3 shows the
operation of the key intersections with the long range background peak hour
traffic. Calculation forms are provided in Appendix B. With the warranted
signalization, the key intersections will operate acceptably.
Figure 6 shows the short range (2005) total peak hour traffic at the
key intersections. Table 4 shows the short range peak hour operation using
the traffic forecasts shown in Figure 6. Calculation forms are provided
in Appendix C. The key intersections will operate similarly to that shown
with the background traffic. Figure 7 shows the short range geometry at
the key intersections.
Figure 8 shows the long range (2020) total peak hour traffic at the
key intersections. Table 5 shows the long range peak hour operation using
the traffic forecasts shown in Figure 8. Calculation forms are provided
in Appendix D_ The key intersections will operate acceptably. Figure 9
shows the long range geometry at the key intersections.
In .the staff comments, reference was made to the proximity of the
Cameron/Frontage Road intersection to College Avenue. This is an existing
situation. The close proximity does cause operational concerns regarding
blockage of the Frontage Road by eastbound traffic on Cameron Drive
approaching College Avenue. This situation exists elsewhere in Fort
Collins. It is recommended that signs be placed stating "DO NOT BLOCK
INTERSECTION. Elimination of the Frontage Road does not appear to be an
option, since it serves the parking lot for Cameron Office Park, Parcel 1
on the south leg of the frontage road, and the Fossil Creek Office Park
(Coronado Court) on the north leg of the frontage road. The site plan for
the Cameron Office Park shows a parking lot connection between Cameron
Drive and Coronado Court. This connection provides an option of not using
the Frontage Road by some of the traffic. If the existing median on
Cameron Drive is extended to the east, it will cover the frontage road.
This will force U-turns at the west end of the existing median. These U-
turns will be difficult, if not impossible, for most vehicle types. While
the median treatment may be perceived as an ideal solution, it does not
deal with the reality of accessing certain properties in an established
business park.
Staff indicated the potential need for a center median in South
College Avenue from Cameron Drive to Fairway Lane. This median is
mentioned in the "South College Avenue (US287) Access Control Plan Update
Report" as an element of the Long Range Access Plan. It is not mentioned
as part of the Short -Term Access Plan. Therefore, the median treatment is
part of the 20-year plan. It is appropriate that the medianization of
South College Avenue proceed in an orderly fashion from north to south, as
it has in the past. Construction of isolated medians is not recommended.
It is more appropriate that this median be built when South College Avenue
is widened to the major arterial (6 through lanes) cross section. The
suggested treatment at the Fossil Boulevard (RT-in/RT-out) intersection
with South College Avenue is that of a channelization island that will
discourage left -in and left -out movements. This design has been prepared
by J.R. Engineering.
co
co
L0
0
•
0
0
a
O
J
U
0
z
a
J
w
O
J
w'
0
z
w
a
z
w
lJR
V
N
r
N
N
Uj
a
7
W
MEMORANDUM P S)
V J. T
cr)o TO: Jon Prouty, Lagunitas Companies
CD Cathy Mathis, VF Ripley p•
rn City of Fort Collins
CD
o FROM: Matt Delich
r
X DATE: July 23, 2002
a
u_
SUBJECT: Redtail PDP Transportation Impact Study Addendum
(File: 0106ME02)
cn 0 The Redtail PDP, located east of the College/Fossil Creek/
N Cameron intersection, Figure 1, has been revised. Figure 2 shows the
CD new site plan. As indicated on Figure 2, access to the site has been
ochanged to include access to Fairway Lane to the north. Also,
r Cameron Drive will not connect with Fossil Boulevard to the north.
rn With this street configuration, the northern portion of the site will
w have access to Fairway Lane and Fossil Boulevard only. In addition
o to this, the proposed land uses have been changed. This addendum
d addresses the staff comments contained in the Staff Project Review
dated April 23, 2002. Contact with Transportation Planning and
Traffic Operations indicated that a memorandum addressing the
comments and changes would be necessary.
The new site plan shows that all of Redtail has been changed to
all residential land uses. Table 1 shows the new trip generation
estimate for Redtail. There will be a reduction in the trip
generation compared to the previous Redtail plan. The peak hour trip
generation will be reduced by 25-35 percent. In addition to this,
the site plan shows that access to the northern portion of the site
will be via the College/Fairway and College/Fossil Boulevard (RT-
in/RT-out) intersections, and access to the southern portion of the
site will be via the College/Fossil Creek/Cameron intersection. The
College/Fossil Boulevard (RT-in/RT-out) intersection is shown on the
"South College Avenue (US287) Access Control Plan Update Report,"
Z February 2002, at a conceptual location just north of where it is
FE w shown on the site plan. Figure 3 shows the assignment of the site
w generated traffic at the key intersections.
z
Z Figures 4 and 5 show the short range (2005) and long range
LU (2020) background peak hour traffic at the key intersections. It is
O expected that traffic signals would not be warranted at the College/
a Fairway intersection in the short range future. However, as further
cc development occurs to the east and west, signals would likely be
O warranted at this intersection. The College/Fairway intersection is
a
Z z shown as a future signalized intersection on the "South College
a Avenue (US287) Access Control Plan Update Report." The right-
¢
f- in/right-out access (Fossil Boulevard) to College Avenue is also
shown on the "South College Avenue (US287) Access Control Plan Update
Report." Table 2 shows the operation of the key intersections with
U. the short range background peak hour traffic. Calculation forms are
¢ provided in Appendix A. The College/Fossil Creek/Cameron
intersection will operate acceptably. With the existing stop sign
control, the delays to the Fairway Lane legs of the College/Fairway