Loading...
HomeMy WebLinkAboutMANSION PARK - PDP - 24-00B - CORRESPONDENCE - TRAFFIC STUDYTro Jones Mansion Park From: Eric Bracke To: Dave Stringer; Troy Jones; Ward Stanford Date: 10/31 /02 2:41 PM Subject: Mansion Park A couple of comments on Mansion Park 1. We should try to get the SIB right turn lane on Timberline at the signalized intersection. Timberline is a major arterial and we should try to keep as much capacity as possible. We can't get it under LUCASS Figure 8-04, but we should buy it. 2. Drake Road along the site has too many directional maneauvers heading westbound. This was done under last summers construction. We should do whatever we can to straighten it out with this project. 3. The roundabout has problems. Please have the developer follow LUCASS standard found in drawing 8-09A of LUCASS. The tri-center curves are not acceptable and it is much too large. Have them use an inscribed circle of 135 feet, entry width at 14' and circulating roadway at 19'. R4 should not exceed 45'. Thanks ELB