HomeMy WebLinkAboutMANSION PARK - PDP - 24-00B - CORRESPONDENCE - REVISIONSSEAR BROWN
Utilities.
We have addressed the majority of comments. The items that we will address at the FCP
level are:
❑ The detail of lowerings.
❑ The potholing of the water line.
❑ The locations of the firelines
❑ The locations of the irrigation Taps
❑ The detail of the cathodic protection.
We have completed the drawings to what we feel is a PDP level. If you find that there is
any information that is needed to clarify the thought behind the design please feel free to
call us.
Yours Sincerely
Jim Allen -Morley
Project Manager
ARCFIITFCTVRE 209 South Meldrum
ENGINEERING Fort Collins, CO 80521
SEAR BROWN
Review Staff
City of Fort Collins Engineering
281 N. College
Fort Collins, CO 80521
RE: Mansion Park Resubmittal
Dear Review Staff.
PLANNING 970.482.5922 phone
CONSTRL/CTION 970.482.6368 fax
www.searbrown.com
Please find attached responses to review comments. We have addressed the majority of
the comments leaving details to be addressed at the FCP level. If staff feels that they
need supplemental information that is not provided please contact us and we will provide
it for your review.
Plat:
We have addressed the majority of the issues. Finalizing reception numbers of offsite
easements and ROW will be left until the FCP submittal.
Engineering:
We have addressed the majority of the comments. Items that are left are:
❑ Final curb return profiles.
❑ Detailed Striping plans to a larger Scale.
❑ Stationing of Drives on Sage Brush.
❑ Final Signing and Striping of the Roundabout.
❑ Showing inlets and valley pans in the Street Plan and profile.
Storm Drainage.
We have addressed the need for detail and the cover issue on the pipe. We would expect
that a thorough review of the drawings and report would be appropriate. The only detail
not provided is in the actual WQCV and orifice Structures. This will be addressed at the
FCP level.