r I .
a) The street oversizing fee is $19,443/acre.
b) A TIS (Transportation Impact Study) is required. Please call Eric
Bracke to schedule a scoping meeting to determine the nature of the
TIS.
c) We will require the submittal of utility plans. A development
agreement may be required.
d) The requirement for the Transportation Impact Study would probably
be waived. Please contact Eric Bracke.
Please contact Mike Dean at 221-6750 if you have questions about these
comments.
6. The Poudre Fire Authority offered the following comments:
a) We will need a report as to the existing condition of the underground
storage tanks.
b) You will be required to take out a permit for the piping (for plan
review/fees).
c) A Hazardous Materials Management Plan and Hazardous Materials
Impact Analysis will be required.
d) Please contact the Larimer County Health Department for specifics on
the type of ventilation equipment that will be required.
Please contact Roger Frasco at 221-6570 if you have questions about
these comments.
7. The Current Planning Department offered the following comments:
a) I've left a message with Matt Baker regarding the changes to the street
oversizing fee. I recommend that you try to contact him as well at 221-
6605.
b) We will look closely at the setback of the canopy from the street and
how it relates to the requirements of the Land Use Code.
c) The lights should be located so that they are flush with the
underdecking, and additional lighting is down -directional, cut off.
d) You will be required to provide street trees, screen the trash
dumpsters, define the areas of circulation on the site plan, and provide
pedestrian connections.
e) Please refer to Articles 3 and 4 of the Land Use Code for the specific
requirements of the Land Use Code.
f) An area of notification map has been included with this letter.
Please contact Leanne Harter at 221-6750 if you have questions about
these comments.
Please contact Peter Barnes 221-6760 if you have questions about these
comments.
2. The Water/Wastewater Utility offered the following comments:
a) There is an existing 24" water in Drake, a 6" and 16" water main down
the east edge of the property. No trees may be planted in the
easements.
b) There is an existing 18" sanitary sewer in Drake, and an 8" sanitary
sewer running diagonal adjacent to the property.
c) A sand -oil interceptor will be required for the car wash.
d) PIF's and water rights are due at time of building permit.
e) Water conservation standards for landscaping and irrigation will apply.
f) A grease interceptor may be required depending on .the type of food
preparation that occurs on the site.
Please contact Jeff Hill at 221-6854 if you have questions about these
comments.
3. The Stormwater Utility offered the following comments:
a) This site is located within the Spring Creek basin where the fees are
$2,175/acre and that is based on amount of added imperviousness, if
any.
b) If the site is already impervious, then no detention would be required.
c) The standard drainage and erosion control reports and plans are
required and they must be prepared by a professional engineer
registered in Colorado.
Please contact Basil Hamdan at 221-6589 if you have questions about
these comments.
4. Light and Power offered the following comments:
a) We are currently serving the Jiffy Lube from a vault in Drake. To sere
the Texaco c-store, an easement would be needed, however, the vault
may not be large enough for the load from both uses.
b) You will be required to submit a C1 Commercial Service Form.
c) The normal development charges and policies will apply.
d) We will need a site plan to determine the location of the transformer
(we would like to see it within 10' of a paved area.)
Please contact Rob Irish at 221-6700 if you have questions about these
comments.
5. The Engineering Department offered the following comments:
Titm
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: December 15, 1997
ITEM: Proposed Jiffy Lube convenience store
APPLICANT: Carr Bieker
The Architects' Studio
117 East Mountain Avenue
Suite 200
Fort Collins, Colorado 80524
LAND USE DATA:
Request for a Texaco and convenience store to be located at the northwest
corner of Drake and College Avenue (next to the existing Jiffy Lube). The car
wash associated with the Jiffy Lube is proposed to be relocated to the site of the
Texaco. The square footage is approximately 2,000 square feet for the c-store
and 500 square feet for the car wash.
COMMENTS:
1. The Zoning Department offered the following comments:
a) The use will be considered to be a convenience retail store with fuel
sales and is a Type 1 review (Administrative Hearing Officer).
b) The mixed use and commercial building standards are applicable.
This includes the build -to line which requires that at least 30% of the
building is adjacent to the street. If this standard cannot be satisfied, a
modification may be requested which takes the project to a Type 2
review (Planning and Zoning Board).
c) Eight parking spaces would be allowed for the building itself (a
maximum of 4 parking spaces for 1,000 square feet.) A recent change
to the Land Use Code has been the addition of the Alternative
Compliance section for the parking spaces and design. Alternative
compliance allows you to request additional parking spaces (explaining
why the additional are required, nature of the customer, etc.), without
seeking a modification to the standard.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT
Commui Planning and Environmental ✓Aces
Current Planning
Llty oI rort L onins
December 22, 1997
Carr Bieker
The Architects' Studio
117 East Mountain Avenue
Suite 200
Fort Collins, Colorado 80524
RE: Conceptual Review Comments
Dear Carr:
For your information, attached is a copy of the Staff's comments concerning the
proposed Jiffy Lube convenience store that was proposed to the conceptual
review team on December 15, 1997.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Leanne Harter, AICP
City Planner
xc: Eric Bracke
Stormwater Utility/Glen Schlueter
Project Planner
File
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020