Loading...
HomeMy WebLinkAboutKMART PLAZA, FULLER'S TEXACO - PDP - 38-97A - CORRESPONDENCE - REVISIONSe) Building envelopes have been delineated and dimensioned on the Site Plan. f) This Texaco sign location has been coordinated between Owner and Peter Barnes. 7. Current Planning a) Photometric plan is revised and resubmitted. b) The east foundation planting area has been increased to exceed 5 feet. The south area is revised to 5 feet, however, as discussed with staff, we propose to use numerous potted plantings, (refer to Landscape Plan), in lieu of a shrub bed. c) General notes have been added. d) Signature blocks have been revised. e) Parking spaces allowed per code are included on the Site Plan. f) The appropriate Legal Description is on the Site Plan. g) Plans have been adjusted to accommodate Drake Road setback requirements. h) Misspelled word is corrected. i) Katherine Avis approved location of bike rack. j) Patio / Courtyard is widened and additional green space is added. Picnic tables have been labeled. k) Interior parking exceeds 6% and is labeled. The Two trees have been added per staff request at increased landscape island thus bringing project into compliance wit full tree stocking. 1) Additional landscape screening has been added south of pumps at east / west entrances. m) The requested tree has been added on Drake Road, as well as, the two trees east of the car wash. n) The Owner is coordinating signage size with Peter Barnes, including the banded logo,and it appears that the banded logo is too large and will be eliminated or much reduced in size. o) We request that the black and red canopy be retained. We feel that similar to the Jiffy Lube project at Kensington and College done by the same owner, the black canopy actually appears neutral and does not detract visually from the overall effect of project uniformity. We ask that you view the aforementioned jiffy Lube project to determine if you agree. p) Additional landscape was added to the west wall of the trash enclosure. q) All reclined items have been addressed. Sincerely, i Carr Bieker Carr Bieker Glenn Konen Donald Bundy August 14, 1998 ♦ To: Leanne A. Harter, ACIP, City Planner From: The Architects' Studio Carr Bieker RE: Written response to Staff Comments on Kmart Plaza, Fuller Texaco Project Development Plan, 438-97 The following is in response to he items fisted in your July 16, 1998 letter: 1. Water Conservation Specialist The Landscape plan includes total areas for each landscape category. 2. Engineering Dept. See response by Stewart Engineering. 3. Stormwater Utility See response by Stewart Engineering. 4. Water / Wastewater Utility See response by Stewart Engineering 5. Light and Power Utility Transformer location will be finalized at the time size is determined. We plan to use or upsize the existing transformer shown on the plans. 6. Zoning Dept. a) Alternate compliance is not required, as discussed with planning staff, parking spaces are within allowable limits. b) Ground sign location on college Ave. has been coordinated between Owner and Peter Barnes. c)Two trees have been provided and landscape buffer has been increased to 5 feet. d) Signage has been removed4ftfacelmations. Planning 151 West Mountain Avenue Fort Collins, Colorado 80524 970-482-8125 FAX 970-482-8450