HomeMy WebLinkAboutKMART PLAZA, FULLER'S TEXACO - PDP - 38-97A - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: rLAlcr's Te-rMo
Planner: L&M Wer4cr Traf iic Operations:
Engineer: Mi iz bean
-I- s Requested
Site land Plat Uti ity Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
✓
,/
�'
t�A�cv ?*—T CMVr ow
Stormwater
,�
,�
✓
a,
Water/Wastewate
✓
✓
✓
TraM( Operations
Trans. Planning
✓
Transfort
Natural Resour(es
Park Planning
Totals
A
3
3
a
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Z/u
Revisions Routing Sheet
. I' ..
PLANNERFILE: PROJECT
ENGINEERING: PAVEMENT
0BUILDING
�.
�...
INSPECTION
POWER
R.O.W. PLANNING
CONSERVATIONLIGHT&
WATER
...o........�
............
PUBLIC
............�
SCHOOLS:, ,'
o�::::::::::�
STATE
............m
t
............m
RAILROAD: . ;
............m
............
............
............
............
Rev. 5-07-97