HomeMy WebLinkAboutRAW URTH DESIGNS - FDP - FDP160001 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT2.10 Runoff Coefficient Adiustment for Infrequent Storms The runoff coefficients provided in tables RO-10 and RO-I 1 are appropriate for use with the 2-year storm event. For storms with higher intensities, an adjustment of the runoff coefficient is required due to the lessening amount of infiltration, depression retention, evapo-transpiration and other losses that have a proportionally smaller effect on storm runoff. This adjustment is applied to the composite runoff coefficient. RO-12. Table RO-12 Rational Method Runoff Coefficients for Composite Analysis Storm Return Period Frequency Factor Years C 2 to 10 1.00 1 I to 25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times Cf cannot exceed the value of 1, in the cases where it does a value of I must be used (6) Section 3.1 is deleted in its entirety. (7) Section 3.2 is deleted in its entirety. (8) Section 3.3 is deleted in its entirety. (9) Anew Section 4.3 is added, to read as follows: 4.3 Computer Modeling Practices (a) For circumstances requiring computer modeling, the design storm hydrographs must be determined using the Stormwater Management Model (SWMM). Basin and conveyance element parameters must be computed based on the physical characteristics of the site. (b) Refer to the SWMM Users' Manual for appropriate modeling methodology, practices and development. The Users' Manual can be found on the Environmental Protection Agency (EPA) website (htto://www.eya.gov/ednnmirl/models/swmm/index.htm). (c) It is the responsibility of the design engineer to verify that all of the models used in the design meet all current City criteria and regulations. 4.3.1 Surface Storage, Resistance Factors, and Infiltration Table RO-13 provides values for surface storage for pervious and impervious surfaces and the infiltration rates to be used with SWMM. Table RO-13 also lists the appropriate infiltration decay rate, zero detention depth and resistance factors, or Manning's "n" values, for pervious and impervious surfaces to be used for SWMM modeling in the city of Fort Collins. 42 Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt 0.95 Concrete 0.95. Gravel 0.5 Roofs 0.95 Recycled Asphalt 0.8 Lawns, Sandy Soil: Flat <2% 0.1 Average 2 to 7% 0.15 Steep >7% 0.2 Lawns, Heavy Soil: Flat <2% 0.2 Average 2 to 7% 0.25 Steep >7% 0.35 (4) A new Section 2.9 is added, to read as tollows: 2.9 Composite Runoff Coefficient Drainage sub -basins are frequently composed of land that has multiple surfaces or zoning classifications. In such cases a composite runoff coefficient must be calculated for any given drainage sub -basin. The composite runoff coefficient is obtained using the following formula: R Y,(C, * A, ) At Where: C = Composite Runoff Coefficient C; = Runoff Coefficient for Specific Area (A;) A; = Area of Surface with Runoff Coefficient of C;, acres or feet-- n = Number of different surfaces to be considered A,= Total Area over which C is applicable, acres or feet? (5) Anew Section 2.10 is added, to read as follows: 41 (RO-8) Table RO-10 t Rational Method Minor Storm Runoff Coefficients for Zoning Classifications Description of Area or Zoning Coefficient R-F 0.3 U-E 0.3 L-M-In 0.55 R-L, N-C-L 0.6 M-M-N, N-C-M 0.65 N-C-B 0.7 Business: C-C-N, C-C-R, C-N, N-C, C-S 0.95 R-D-R, C-C, C-L 0.95 D, C 0.95 H-C 0.95 C-S 0.95 Industrial: E 0.85 I 0.95 Undeveloped: R-C, T 0.2 P-O-L 0.25 For guidance regarding zoning districts and classifications of such districts please refer to Article Four of the City Land Use Code, as amended. 40 10.00 9.00 e.00 2 r 7.00 a m r 5.00 i 5.00 w 4.00 J Q i 3.00 9 RAINFALL INTENSITY -DURATION -FREQUENCY CURVE 2.00 1.00 0.00 0.00 10.00 20.00 30.00 40.00 50.00 STORM DURATION (minutes) -2-Year Storm - - - 10-Year storm -100-Year Storm Figure RA-16 City of Fort Collins Rainfall Intensity -Duration -Frequency Curves (13) Section 5.0 is deleted in its entirety. (14) Section 6.0 is deleted in its entirety. (15) Section 7.0 is deleted in its entirety. (16) Section 7.l is deleted in its entirety. (17) Section 7.2 is deleted in its entirety. (18) Section 7.3 is deleted in its entirety. (19) Section 8.0 is deleted in its entirety. (20) Table RA -I is deleted in its entirety. 36 Table RA-8 -- City of Fort Collins Rainfall intensity -Duration -Frequency Table for Use with the Rational Method (31 minutes to 60 minutes) Duration (min) 31 2-Year Intensity (in/hr) 1.27 l0-Year Intensity (in/hr) 2.16 100-Year Intensity (in/hr) 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.0 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.8 40 1.07 1.83 3.74 41 1.05 1.8 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1:69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.6 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.9 1.54 3.14 53 0.89 1.52 3.1 54 0.88 1.5 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.4 2.86 34 ' (1 1) Section 4.0 is amended to read as follows: 4.0 Intensity -Duration -Frequency Curves for Rational Method: The one -hour rainfall Intensity -Duration -Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins ' Rainfall Intensity -Duration -Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) Duration (min) 5 2-Year Intensity (in/hr) 2.85 10-Year Intensity (in/hr) 4.87 100-Year Intensity (in/hr) 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 j 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 33 APPENDIX E FIGURES AND TABLES Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins Project: Raw Urth Designs Disturbed Acres:0.90 BMP Amount Estimated Unit Total EROSION CONTROL BMPs Units Quantity Price Price Silt Fence L.F. 730 $3.00 $2,190.00 Rock Sock each 15 $85.00 $1,275.00 Vehicle Tracking Control Pad each 1 $1,500.00 $1,500.00 Concrete Washout each 1 $1,200.00 $1,200.00 (add all other BMPs for the site in this list) Sub -Total: $6,165.00 1.5 x Sub -Total: $9,247.50 Amount of security: $9,247.50 w- Reseeding Amount Total Acres x Price/acre: $1,080.00 Unit Price of Seeding per acre: $1,200.00 Sub -Total: $1,080.00 1.5 x Sub -Total: $1,620.00 Amount to Re -seed: $1,620.00 Miniumum Escrow Amount .. __. Minimum escrow amount: $3,000.00 Final I Escrow Amount Erosion Control Escrow: $9,247.50 ' `The amount of the .security must be based on one and one-half limes the estimate of the cost to install the approved measures, or one and one-half times the cost to re -vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. Its no instance, will the amount of security be less than one thousand five hundred dollars (81,500) for residential development or three thousand dollars ($3,000) for commercial development" II II 1 5/12/2015 3:13 PM N1177-M Raa Ufta2inegelExm ple Es .xh CONSTRUCTION SEQUENCE -• DESIGNS .8/10/15 CONSTRUCTION - eeeeeeeeeee® DETENTION/ WQ PONDS SAINITARY SEWER STORM SEWER POND OUTLET STRUCTURES CURB AND GUTTER PAVEMENT INSTALLTATION FINE GRADING / BASE COURSE- INSTALL BEST MANAGEMENT PRACTICES SILT FENCE BARRIERS CONTOUR FURROWS (RIPPING/DISKING) SEDIMENT TRAP / FILTER VEHICLE TRACKING PADS FLOW BARRIERS (WATTLES, ETC) CONCRETE WASHOUT BARE SOIL PREPARATION TEMPORARY SEED PLANTING PERMANENT SEED PLANTING SOD INSTALLATION II Raw Urth LID Table New Impervious Area 25689 sq. ft. Required Minimum Impervious Area to be Treated (50%) 12845 sq. ft. Impervious Area Treated by LID Treatment Method #1(LID swale with underdrain) 6368 sq. ft. Impervious Area Treated by Porous Pavement 5714 sq. ft. Total Impervious Area Treated (47%) 12082 sq. ft. New Pavement Area 12010 sq. ft. Required Minimum Area of Porous Pavement (25%) 3003 sq. ft. Area of Paver Section A 3047 sq. ft. Run-on area for Paver Section A 2667 sq. ft. Total Porous Pavement Area (25%) 3047 sq. ft. APPENDIX D BMP SCHEDULE & COST ESTIMATE L] Emergency Overflow Spillway Sizing LOCATION: Raw Urth Designs PROJECT NO: 177-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 5/24/2005 Equation for flow over a broad crested weir _ AGfb8lfll Q = CLH3/2 spill616VdOf1 where C = weir coefficient = 2.8 L 01 H = overflow height 7 1009rWS'EL L = length of the weir = The pond has a spill elevation 0 ft above the maximum water surface elevation in the pond Spillways will be designed with 0.25 ft flow depth, thus H = 0.25 ft Size the spillway assuming that the pond outlet is completely clogged. Q (100) = 6.2 cfs Spill elev = 4971.80 ft 100 yr WSEL = 4971.8 ft Top of berm elev.= 4972.30 Weir length required: L= 18 ft Use L = 20 ft v = 0.89 ft LOCATION: PROJECT NO: COMPUTATIONS BY SUBMITTED BY: DATE: Detention Pond Outlet Sizing (100 yr event) Raw Urth Designs 177-09 PPK North Star Design, Inc. 8/12/2015 Submerged Orifice Outlet: release rate is described by the orifice equation Q. = C.A. sgrt( 2g(h-E.)) where Q = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s k = effective area of the orifice (ft'`) E = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qo = 0.18 cfs outlet pipe dia = D = 12.0 in Invert elev. = 4768.80 ft E, = 4768.88 ft h = 4771.8 ft - 100 yr WSEL Co = 0.62 solve for effective area of orifice using the orifice equation Ao = 0.021 ftz 3.1 in'` orifice dia. = d = 1.97 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/D= 0.16 kinematic viscosity, u = 1.22E-05 ftZ/s Reynolds no. = Red = 4Q/(pdu) = 1.14E+05 Co = (K in figure) = 0.62 check Use d = 1.95 in A o = 0.021 ft' = 2.99 in ' O m= = 0.18 cfs LOCATION ' PROJECT NO: COMPUTATIONS BY: SUBMITTED BY: DATE: L 100 yr WSEL STAGE - STORAGE TABLE (100-YEAR) Raw Urth Designs 177-09 PPK North Star Design, Inc. 8/l/2008 100 yr Detention Volume Required = 0.200 Water Quality Volume Required = 0.000 Total Volume Required= 0.200 Stage 00 Surface Area (ft2) Incremental Storage (ac-ft) Total Storage (ac-ft) 4768.80 0 4769.0 761 0.001 0.001 4770.0 1,695 0.027 0.029 4771.0 4,321 0.067 0.095 4771.80 7,253 0.104 0.200 4772.0 8,009 0.139 0.235 4772.3 9,337 0.060 0.294 SPILLWAY ELEV MINIMUM DETENTION VOLUME REQUIRED FAA METHOD (100-YEAR) LOCATION: Raw Urth Designs PROJECT NO: 177-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 8/12/2015 Equations: A trib. To pond = 0.89 acre QD = CiA C100 = 0.87 Vi = T*CiA = T*QD Developed C*A = 0.8 acre V. =K*Qro*T Qvo = 0.18 cfs S=Vi -V. K= 1 (from fig 2.1) Rainfall intensity from City of Fort Collins IDF Curve Storm Duration, T (min) Rainfall Intensity, i (in/hr) QD ON Vol. In Vi (ft) Vol. Out V. (ft3) Storage S (ft) Storage S (ac-ft) 5 9.95 7.7 2311 55 2256 0.052 10 T72 6.0 3587 110 3476 0.080 20 5.60 4.3 5203 221 4982 0.114 30 4.52 3.5 6300 331 5969 0.137 40 3.74 2.9 6950 442 6509 0.149 50 3.23 2.5 7503 552 6951 0.160 60 2.86 2.2 7972 662 7310 0.168 70 2.62 2.0 8520 773 7748 0.178 80 2.38 1.8 8846 883 7962 0.183 90 2.22 1.7 9282 994 8289 0.190 100 2.05 1.6 9524 1104 8420 0.193 110 1.93 1.5 9863 1214 8649 0.199 120 1.80 1.4 10035 1325 8710 0.200 130 1.60 1.2 9663 1435 8228 0.189 140 1.40 1.1 9106 1546 7560 0.174 150 1.20 0.9 8362 1656 6706 0.154 160 1.15 0.9 8548 1766 6782 0.156 170 1.10 0.9 8688 1877 6811 0.156 180 1.05 0.8 8781 1987 6793 0.156 Required Storage Volume: 8710 ft3 0.200 acre -it APPENDIX C DETENTION POND SIZING CALCULATIONS C Weir Check of Channel Sizing LOCATION: Raw Urth PROJECT NO: 177-09 COMPUTATIONS BY: ppk SUBMITTED BY: North Star Design DATE: 12/29/2015 Solve for h using Weir Equation Q = CLH'/Z where C = weir coefficient H = overflow height L = length of the weir Sidewalk Culver in Basin 2 Q = 1.50 cfs C = 2.62 L = 4.50 ft Solve for H: 0.25 ft Normal Flow Analysis - Trapezoidal Channel Project: Raw birth Channel ID: Sidewalk Culvert in Basin 2 Fc----------- I------------ > Y ; 1 � 7YO 1 7 Zl E----- B------ > Z2 inel Invert Slope So = .................. . 0.0200 ft/ft ning's n n = 0.013 Dm Width B = 2.00 ft Side Slope Z1 = 0 00 Wit it Side Slope Z2 = 0.00 ft/ft aboard Height F = 0.32 ft gn Water Depth Y = 0.17 ft scharge Q = 1.52 cfs oude Number Fr = 1.91 ow Velocity V = 4.48 fps )w Area A = 0.34 sq ft ip Width T =' 2.00 ft etted Perimeter P 2.34`ft rdraulic Radius R = 0.15 ft (draulic Depth D =, 0.17`ft )ecific Energy Es =, 0.48'ft mtroid of Flow Area Yo = 0.09 ft )ecific Force Fs = 0.02 kip UD-Channels v1.04.xis, Basics 12/29/2015, 4:05 PM AREA INLET IN A TRAPEZOIDAL GRASS -LINED CHANNEL Raw Urth Inlet 1 Design Information (knout! of Inlet Inlet Type =1 Umr-Defined t of Inclined Grate (must be <= 30 degrees) of Grate th of Grate i Area Ratio 10 Inclined Grate prig Factor r Discharge Coefficient �^� r `""'-�- •" � �t a Coefficient Coefficient t....,,,�� .-,.. _y✓„,....-- �' MR r Depth at Inlet (for depressed Inlets, I foot is added for depression) it = II Inlet Interception Capacity (assumes clogged condition) Q = CePechy IS GOOD for Minor end Major Storms 1- O PEAK) Bypassed Flow, Q Capture Percentage a Q/De = C Warning 02: Depth (d) exceeds USDCM Volume I recommendation. 0.28 0.4g tna 2.a 0.00 0., 0Ao 100 100 is fa INlet i.xlsm, Area Inlet 8/12/2015, 1:17 PM AREA INLET IN A TRAPEZOIDAL GRASS -LINED CHANNEL I Raw UM Inlet t __..__.._._.....__.._ T ....._......_..._...__. GrassType Litniti Manni 's n MAX T -�-_ v_ f� Of 1d MAX A 0.06 B 0.04 C 0.033 D 0.03 E 0.024 tmily,l. of Trap... idal Gras,.Linqd Channel U.nno SC9 Method NRCS Vegetal Retardance (A, S. C, D. or E) A, B, C, D or E Awning's n (Leave cell D16 blank to manually enter an n value) n •MOO. hannel Invert Slaps So=Vft Bottom Width B = -eft Side Slope Zi =Vft Right Side Slope 72 •Rot heck one of the following soil Soil Twe: Mao V� Ma• Fran d N,� IF.•yt Q Sandy Sandy 5.0 fps 0.50 IS aw-sanev NonSaid 7.0 fps 0.811 Minor Stone Major Storm max. Nlowable Top Width of Chanel for Minor 8 Major Starer Taws -1 1o.e0 10.00 fast sX. Allowable Water Depth In Charnel for Minor b Major Storm cl. too 5.00 /eat STORM Allowable Capacity is based an Top Width Criterion STORM Allowable Capacity is based on Top Width Criterion i peak Flow Depth storm max, allowable capacity GOOD -greater than flow given on sheet'O-Peek' storm max, aibwablestorm max, capacity GOOD -create, than flow given on sheat'OBenkGOOD -create, than flow given on sheet'OBeak' Oaa.• t1A5 1i.45 cb cl a t.00 7.00 In Q. -1 cfs 0.40 1 1.70 d.1 0.28 1 0.49 fast INlet t.xlsm, Area Inlet 8112P2015, 1:17 PM North Star Design. Inc. 700 Automation Drive, Unit 1 Windsor, CO 80550 LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 8/12/2015 100-yr storm, C1= 1.25 RATIONAL METHOD PEAK RUNOFF (100-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Point Area Design. A (ac) C'Cf tc (min) i (new) (in/hr) Q (100) (cfs) from Design Point Q (100) (cfs) Q(100)tot (cfs) 1 1 0.19 0.95 5.8 9.41 1.7 1.7 To area inlet 1 2 0.15 1.00 5.0 9.95 1.5 1.5 to sidewalk culvert 1 1 3 0.51 0.81 9.9 7.74 3.2 3.2 ITo Det Pond 1 ALL 0.89 0.87 9.0 7.96 6.2 6.2 To Det Pond 1 OS 0.03 0.49 5.0 1 9.95 0.1 0.1 To Streets Q=CiA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow.xls 0100 M M M M M M M i M M M t M M M M = = M North Star Design, Inc. 700 Automation Drive, Unit 1 Windsor, CO 80550 LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DA77?: 8/12/2015 2-yr storm, Cf = 1.00 RATIONAL METHOD PEAK RUNOFF (2-YEAR) DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) C'Cf It;i (min) (new) (in/hr) Q (2) (CIS) from Design Point Q (2) (cfs) Q(2)tot (cfs) 1 1 1 1 2 3 0.19 0.15 0.51 0.76 0.87 0.65 7.6 5.0 11.9 2.45 2.85 2.05 0.4 0.4 0.7 0.4 0.4 0.7 To area inlet to sidewalk culvert To Det Pond 1 ALL 0.89 0.70 11.6 2.08 1.3 1.3 To Det Pond 1 OS 0.03 0.39 5.0 2.85 1 0.0 0.0 To Streets Q=CfCiA Q = peak discharge (cfs) C = runoff coefficient C1= frequency adjustment factor i = rainfall intensity (in/hr) from OF curve A = drainage area (acres) Flow.xls 02 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: PROD ECT NO: COMPUTATIONS BY: DATE: 100-yr storm Raw Urth Designs 177-06 ppk 8112/2015 Cf = 1.25 STANDARD FORM SF-2 TIME OF CONCENTRATION • 100 YR SUB -BASIN DATA INITIAL /OVERLAND TIME (ti) TRAVEL TIME I GUTTER OR CHANNEL FLOW 00 tc CHECK (URBANIZED BASIN) FINAL to REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) C'Cf Length (ft) (4) Slope (%) (5) it (min) (6) Length (ft) (7) Slope (%) (8) n Manning rough. Vel. (ft/s) (9) it (min) (10) tc = ti+It 01) Total (ft) (12) tc=(V180)+10 (min) (13) (min) (14) 1 1 0.19 0.76 0.95 35 1.5 1.4 204 0.5 0.030 0.8 4.49 5.8 239 11.3 5.8 1 2 0.15 0.87 1.00 24 1.5 0.8 146 0.6 0.016 1.6 1.56 2.3 170 %9 5.0 1 3 0.51 0.65 0.81 67 1.0 4.2 283 0.6 0.030 0.8 5,68 9.9 350 11.9 9.9 1 ALL 0.89 0.70 0.87 67 1 1.0 3.3 283 1 0.6 1 0.030 0.8 5.68 9.0 350 11.9 9.0 1 Os 0.03 0.39 0.49 13 1 3.5 2.6 0 0.6 1 0.030 0.8 0.00 2.6 13 10.1 5.0 Flow.xis EQUATIONS: tc=ti+tt ti=[1.87(1.1-CCi)Lo.s]lS113 tt = L/Vel. Velocity from Manning's Equation With R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check min. tc = 5 minutes TOC-100 M = M M North Star Design, Inc. 700 Automation Drive, Unit 1 Windsor, CO 80550 LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: 2-yr storm Raw Urth Designs 177-06 ppk 8/12/2015 Cf = 1.00 STANDARD FORM SF-2 TIME OF CONCENTRATION - 2 YEAR SUB -BASIN DATA INITIAL /OVERLAND TIME (tl) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) tc CHECK (URBANIZED BASIN) FINAL tc REMARKS DESIGN POINT SUBBASIN(s) (1) Area (ac) (2) C (3) Length (ft) (4) Slope (%) (5) ti (min) (6) Length (it) (7) Slope (%) (8) n Manning rough. Vel. (ft/s) (9) it (min) (10) tc ti+tt (11) Total L (ft) (12) tc=(1/180)+10 (min) (13) (min) (14) 1 1 0.19 0.76 35 1.5 3.1 0.5 0.030 0.8 4.49 7.6 239 11.3 T6 1 2 0.15 0,87 24 1.5 1.8 0.6 0,016 1.6 1.56 3.4 170 10.9 5.0 1 3 0.51 0.65 67 1.0 6.6 fl283 0.6 0.030 0.8 5.68 12.3 360 11.9 11.9 1 ALL 0.89 0.70 67 1.0 5.9 0.6 0.030 0.8 5.68 11.6 350 11.9 11.6 OS 0.03 0.39 13 3.5 3.0 0.6 0.030 0.8 0.00 3.0 13 10.1 6.0 EQUATIONS: tc; =ti+It ti=[1.87(1.1- CC, )Lo.5)fS1/3 It = Wel. Velocity from Manning's Equation With R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check min. tc = 5 minutes Flow.xls TOG-2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 FlowAs LOCATION: Raw Urth Desilms PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 8/12/2015 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks Gravel Roofs Lawns (flat <2%, heavy soil) % Runoff Impervious coefficient C 100% 0.95 96% 0.95 40% 0.50 90% 0.95 0% 0.20 SUBBASIN DESIGNATION TOTAL AREA ac. TOTAL AREA s .ft ROOF AREA s .ft PAVED AREA sq.k SIDEWALK AREA s .ft GRAVEL AREA s .ft LANDSCAPE AREA s .ft % Impervious RUNOFF COEFF. C 1 0.19 8474 0 6368 0 0 2.106 75% 0.76 2 0.15 6427 0 5,354 360 0 713 89"/° 0.87 3 0.51 22236 12415 0 904 0 8,917 54% 0.65 ALL I 0.89 38,584 12,415 12.010 1,264 0 12.895 63"% 0.70 OS 0.03 1,178 0 1 300 1 0 1 0 878 25% 0.39 Equations - Calculated C coefficients & % Impervious are area weighted C=F:(Ci Ai) /At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's Cval M = M M M M M APPENDIX B HYDROLOGIC COMPUTATIONS 10 ALLEY --._- u I I II r I ��# \ ••5 ��II S � I ISk{jjr ;' V • � ti } \, p ff r• / /.� MD CEDAR CIRCLE 0 qq QQ gg B � ArJ nn `/oo®®I • a yII!79 c g }3 9 s HIM g3 ------------ ------------ ------------ " o T RAW URTH DESIGNS LOT 20, BLOCK 3 E 1w "n.n q4 oue.. is/vu Na. REN9IX er D.rt 11North Star ,�- design, Inc. d.: r.io DeySnM by, PPK i ca ac REPLAT (NO.D of EVERGREEN PARK mF I wmauon N.., wni o oo A gM� 0 ,U o,a.n ba OK DRAINAGE & EROSION CONTROL PLAN �"�.«= .4 Plwrw: e}aeeea&se FPc B)O8B&11R8 ' PROJECT LOCATION I II 11 11 APPENDIX A VICINITY MAP 7. REFERENCES 1. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", 2001 Edition Volume 1 updated June 2001, January 2004 and April 2008; Volume 2 updated June 2001 and April 2008; and Volume 3 updated November and December 2010. 2. The Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual, adopted by the City Council of the City of Fort Collins, as referenced in Section 26-500 (c) of the Code of the City of Fort Collins. 3. ORDINANCE NO. 152, 2012 of the Council of the City of Fort Collins amending Chapter 26 of the Code of the City of Fort Collins and the Fort Collins Stormwater Criterial Manual to incorporate provisions implementing Low Impact Development (LID) Principles. 13 6. CONCLUSIONS 6.1 Comptiance with Standards All computations that have been completed within this report are in compliance with the "City of Fort Collins Erosion Control Reference Manual for Construction Sites", the "City of Fort Collins Storm Drainage Design Criteria Manual", and the "Urban Storm Drainage Criteria Manual". 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for the collection and conveyance of on -site runoff to the detention area. Conveyance elements exist to adequately convey detained runoff downstream. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. 12 5) Waste Management and Disposal: Portable toilets will be anchored & periodically maintained by waste management company. Dumpsters on site will be covered & periodically emptied by waste management company. Concrete waste will be allowed to harden and then will be removed from site. No washing activities will occur on site. Location of the concrete washout is shown on the site map. The washout will be suitably deep to accommodate all anticipated concrete truck wash water. Waste concrete will be allowed to harden & be removed from site periodically as the washout reaches 50% of capacity. Truck wash water will not be allowed to reach the curb & gutter or any other water course. 6) Groundwater and Stormwater Dewatering: No groundwater was encountered during soils exploration therefore ground water is not anticipated to be an issue. If groundwater is encountered a groundwater discharge permit shall be obtained and a detailed report shall be completed describing the location and the route of where pumped groundwater will be conveyed and the measures taken to prevent the transport of any pollutants to downstream waters. 7) Inspection & Maintenance: It is required that routine site inspections are performed to effectively address maintenance and repair of Best Management Practices (BMP's). The site inspections are to be performed by the contractor or an inspector designated by the administrator at a minimum of once every fourteen (14) calendar days on active construction sites and after any significant storm event (an event causing runoff). As part of the site inspections the inspector is required to keep documentation of all inspections and BMP maintenance, including an updated Site Map indicating new BMP's or the removal of BMP's since the previous inspection. Any maintenance, repair, or necessary installation of BMP's that are noted during the inspection must be completed within seven (7) calendar days from the date of the inspection 11 2) Materials Handling and Snill PrPvPntinn- Materials Handling & Spill BMP " ` "Applicable Approximate]ocation,on site to this. �Tieventton Project Portable toilets, anchored & Contractor to determine X located away from drainages Fuel storage located in bulk tanks with secondary containment & spill kit Mobile fueling performed at least 200 feet away from drainages & Contractor to determine X fully attended Fertilizers, form oil, solvents, cleaners, detergent stored in 55 gal Contractor to determine X or smaller containers, kept in storage units Dumpsters containing used chemicals containers & liquid Contractor to determine X wastes kept covered Equipment cleaning (on site) uses no detergents & flows to onsite retention basin In case of a release of fuel or other chemicals, absorbent booms or earthen berms will be immediately Location of spill X constructed to contain the spill & prevent runoff to adjacent surface waters MSDS sheets for onsite chemicals will be kept at the construction Contractor to determine }{ trailer to facilitate spill response & cleanup 3) Dedicated Asphalt or Concrete Batch Plant: Not proposed with this development 4) Vehicle Tracking Pad: Vehicle tracking control pad shall be installed wherever construction vehicle access routes ' intersect paved public roads. Vehicle tracking control pads shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Any mud ' tracked to public roads shall be removed on a daily basis and after any significant storm that causes sediment to be transported. It is unlawful to track sediment/mud onto public streets ' and may be enforced by the City of Fort Collins, by the State of Colorado or by the EPA. 10 ' 1 No area shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. Temporary & Permanent non-structural BMP's: Non -Structural BMP,,' . A roximate location on site PP � Applicable to this 'project Surface roughening Entire site X Soil stockpile height limit (less than 10') Perimeter vegetative buffer North boundary of site X Minimization of site disturbance Mulch Seed & mulch stockpiles after 30 days Stockpile toe protection (silt fence, wattles or ditch) Preservation & protection of existing vegetation & trees North boundary of site X Good site housekeeping (routine cleanup of trash & constr debris) Entire Site X Sweeping & scraping of hardscape areas On and off site pavements X Heavy equip staged on site, properly maintained & inspected daily (no onsite maintenance) Staging area X 1 5.5 BMP Implementation 1) Phased BMP Implementation BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. A construction sequence schedule has been included on the Drainage & Erosion Control Plan and included in the construction plans for this site. All BMP's shall be inspected and repaired or replaced as required to satisfy the conditions of the Stormwater Discharge Permit. All BMP's must be maintained and repaired as needed to assure continued performance of their intended function. Refer to Appendix D for the BMP schedule and estimated costs. 9 All BMP's shall be installed per the details shown on the construction plan set. Temporary & Permanent Structural BMP's: Structural BMP Approximate location on site Applicable to�this Project E Silt Fence Site perimeter, refer to site map X Straw bale dams Rock Socks At sidewalk culverts, in swales, at new inlet, in existing gutters, refer to site map X Earthen diversion dams Vegetated swales Sediment trap/pond Pipe slope drains Geogrid Inlet/outlet protection In the detention Pond X Culverts Riprap Erosion control mats Inlet protection Vehicle Tracking Control Pad At site entrance, refer to site map X Concrete Washout To be located by Contractor, near site entry X Non -Structural Practices for Erosion and Sediment Control: Soils exposed daring the earthwork phase and landscape prep phase shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No large amount of soils (in excess of 15 yards) will be allowed to be stock piled on site. Overburden from the utility pipe trenching will be piled adjacent to trenches upstream of sediment controls and will be replaced in the trenches within 72 hours. Excess excavated materials from the demolition and grading phases of the project that cannot be reused on site will be exported as it is excavated. This includes any asphalt pavement from the existing site that is to be removed. A vehicle tracking pad will be installed at a location most beneficial to the site construction as determined by the contractor. Vehicles will not be permitted in the excavated area if soil is muddy. Gravel. sub base will be placed and compacted in the areas indicated for pavement following excavation. In the current pre construction state the site enables tracking of silt onto the adjacent streets during wet conditions. During construction activities the street will be monitored for foreign debris tracked out of the site and mechanical sweeping and clean up will be performed as needed. 5.3 Identification and location of all potential pollution sources Potential Pollutant Source Activity Potential Pollutant Generated - Applicable to this project Disturbed Areas Sediment X Soil stockpiles Sediment X Travel to adjacent public streets Tracked sediment X Contaminated soils Sediment, chemicals Loading and unloading chemicals Chemicals Unloading of building materials Trash, debris X Outdoor storage of chemicals Chemicals On site equipment maintenance Oil, grease On site equipment fiieling Diesel, gasoline X Dust generating activities Particulates, sediment X Use of fertilizer, pesticides, herbicides Fertilizer, pesticides Use of detergents, solvents, oils Detergents, solvents, oil X Waste dumpsters, waste piles Chemicals, trash, debris X Concrete washout Concrete, sediment, wash water X On site equipment washing Detergents, oil On site asphalt batch plant Asphaltic cement, sediment On site concrete batch plant Cement, sediment Portable toilets Domestic sewage X 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention Structural Practices for Erosion and Sediment Control Structural practices for the site will consist mainly of silt fence and rock sock filters and are described in detail in the following paragraphs. These BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as ' needed to assure continued performance of their intended function. Silt fence and rock sock filters shall be in place prior to commencement of construction activities. During clearing and grubbing necessary for silt fence installation, all cleared material shall be placed on the uphill side so that if erosion occurs from the cleared material, the sediment will be trapped and not transported downstream. Rock socks shall be implemented in the existing ' curb line as shown on the Drainage & Erosion Control Plan. 7 Refer to Appendix D for the timing of the construction phases and the sequential installation of all BMW phasing for this site. Refer to the Appendix D for the Erosion Control Surety calculations. 5.2 SWMP contact information Permit holder: Name: Address: Phone Number: Email Address: Appointed agent: Name: Address: Phone Number: Email Address: 6 1 1 1 1 1 1 1 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis The soils on this site are classified by the USGS Soil Survey as Nunn Clay Loam and are classified in the hydrologic group C. The soils are described as having a slow runoff rate and the hazard of water erosion is moderate and the hazard of wind erosion is moderate. The site is surrounded by developed sites including streets and paved areas. The construction shall utilize silt fence around the perimeter to control sediment transport from rainfall and from wind. The silt fence that is located in the proposed pavement areas will be removed prior to placing new pavement. Rock socks will be utilized in the existing curb and the newly constructed swales to capture sediments that are not fully contained by the silt fence placement. The locations of the rock socks will be in the areas of concentrated flow such as in the existing curb, at the new swales and as needed. The site will also utilize a vehicle tracking control pad to minimize sediment from being tracked onto adjacent pavements. Sediment that is tracked will be removed and placed within the site or permanently disposed of offsite. A concrete washout will be used on site during the concrete placement. All hardened concrete will be disposed of offsite. These BMP's have not been located on the site map due to the fact that the site is very small and these BMP's will need to be placed by the contractor in locations that are most beneficial and will minimize disruption of adjacent traffic. Permanent erosion control consists of covering the soils with a building, concrete walks, concrete drives and sod. No soil will be left exposed to erosion after the construction is complete. Refer to the landscape plan for areas of and instructions for placement of sod and soil amendments required prior to placement of sod. Basin 3 is located in the southwest portion of the site and contains the building and the detention pond (landscape area). The roof of the storage building is sloped to drain to the south and the bottom of the detention area is sloped to drain east. This basin accepts runoff from Basins 1 and 2. The detained runoff will enter the existing storm system via a new storm pipe with an orifice to restrict flows to the 2 year historic rate (0.2cfs per acre). Basin OS is the site area that drains to the street undetained. A majority of the area that is draining to the street is a narrow landscape strip located between the detention pond wall and the sidewalk. The impervious area is a portion of the drive entry (approximately 300 square feet) that drains to Red Cedar. The amount of runoff is quantified as 0.0 cfs in the minor storm and 0.1cfs in the 100 year storm event. Drainage design for this site has been designed to convey on -site runoff to the proposed detention pond and incorporate the required LID enhancement features. On -site runoff will be conveyed to the detention pond via surface flow in the drive aisles, in the LID swale and subsurface in the perforated pipes. The detention pond will release the detained runoff from the site at the existing (historic) 2-year runoff rate of 0.2 cfs per acre. The developed 2-year runoff rate for this site is 1.3 cfs and the developed 100-year runoff rate is 6.2 cfs. 4.3 Drainage Summary This site has been designed to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual" specifications. The proposed drainage design for this site has been designed to convey on -site runoff to the detention pond while minimizing future maintenance. The site incorporates a LID (Low Impact Development) treatment areas including an LID Swale without underdrain along the north property line, and permeable interlocking pavers in the parking lot. Refer to the end of Appendix D for a table indicating the size of the LID treatment area and the area of the site that drains to that LID treatment area. All drainage facilities proposed with this project, including the detention pond, LID features, porous pavers and outlet structure are private and will be owned and maintained by the property owner. 4 3.4 Hydraulic Criteria Hydraulic elements have been designed per City of Fort Collins standards to adequately convey the 100-year storm runoff from this site to the proposed detention pond. A ' proposed 12" storm pipe will convey the detained runoff from the site to the existing manhole at the southeast corner of the site. 4. DRAINAGE FACILITY DESIGN r4.1 General Concept ' The runoff from this site will flow into the drive aisle and parking lot which will be constructed using conventional materials (asphalt or concrete) and permeable interlocking pavers. The runoff from the site will either flow on the surface or enter a storm pipe via the permeable interlocking pavers or inlet. In a situation where the permeable interlocking pavements are clogged, the runoff will flow on the surface and enter the detention pond through a metal sidewalk culvert. On -site runoff will also be conveyed to the detention pond via flows in LID swales along the north property boundary to an area inlet and storm pipe. The detained runoff will discharge into the existing storm pipe located at the southeast comer of the site. ' 4.2 Specific Flow Routing ' With this design, the site has been broken into 3 basins which correspond with the LID feature that the basin flows to. The basin are described in the following paragraphs. Basin 1 is located in the northmost portion of the site and contains a majority of the private drive and LID feature 41 which is an LID swale with an underdrain. The runoff I' from the paved area will flow to the swale and will be collected in an area inlet. The stonn pipe then conveys the flows to the south into the detention pond. ' Basin 2 is located in the eastmost portion of the site and contains a portion of the paved private drive and the parking lot which is surfaced with porous pavers. The runoff from ' this basin flows to a low point in the private drive then south into the parking lot porous pavers. The flow, if it exceeds the capacity of the pavers, will flow into the detention pond via a metal sidewalk culvert. 3 3. 2.2 Sub -basin Description Runoff from this site currently flows to the existing streets and alley. From there, the runoff enters an existing inlet near the intersection of Red Cedar and Conifer. With the proposed drainage concept for this site, the runoff from the site will flow to a proposed detention pond and be released at the 2 year historic runoff rate into the storm system near the intersection of Red Cedar and Conifer. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual" specifications except where variances are requested as noted in Section 4.2 of this report. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 2001, developed by the Denver Regional Council of Governments, has been used. 3.2 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the Dry Creek Drainage Basin and the City of Fort Collins Stormwater Department. Both stormwater runoff detention and water quality extended detention are required for this site with on -site detention and offsite water quality. The release rate from the site will be equal to the existing 2-year runoff (0.2 cfs per acre). 3.3 Hydrologic Criteria Runoff computations were prepared for the 10-year minor and 100-year major storm frequencies utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub -basins. Detention volume was calculated using the predetermined release rate of 0.2 cfs per acre. The FAA method for detention pond sizing was utilized to determine the required volume. Refer to the detention calculations included in Appendix C of this report. 2 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location This site is located on the north side of Conifer Street, west of Red Cedar Circle and east of the existing alley in the Northwest Quarter of Section 1, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the Vicinity Map in Appendix A of this report. This project is bounded on the north by an existing building, on the east by existing Red Cedar Circle, on the west by a paved alley, and on the south by existing Conifer Street. 1.2 Description of Property The entire project consists of approximately 0.9 acres. The site is currently undeveloped, with areas of existing volunteer weeds and grasses. The existing site is flat with existing slope to the southeast at approximately 0.5% to 1%. The site currently drains into the adjacent streets and alley. Proposed development on -site will include one building, a private drive along the north side of the building, a parking lot and sidewalks. Existing drainage patterns will be altered to direct flow to a proposed detention pond in the southeast corner of the site which will release into the existing storm system in this location. 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the Dry Creek Drainage Basin. Stormwater ' detention is required for this basin but water quality extended detention is not required because it is provided in the North East College Corridor Outfall (NECCO) detention ' pond. The City requirement for stormwater detention in the Dry Creek basin is a single - stage detention with a 100-year release rate equal to the existing 2-year runoff (0.2 cfs per acre). TABLE OF CONTENTS TABLEOF CONTENTS............................................................................................................... iii GENERAL LOCATION AND DESCRIPTION 1.1 Location...................................................................................................................1 1.2 Description of Property ............................................................................................I 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................1 2.2 Sub -Basin Description............................................................................................. I 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations..............................................................................................................2 3.2 Development Criteria Reference and Constraints...................................................2 3.3 Hydrologic Criteria..................................................................................................2 3.4 Hydraulic Criteria....................................................................................................3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept......................................................................................................3 4.2 Specific Flow Routing.............................................................................................3 4.3 Drainage Summary ..................................................................................................5 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis.....................................................................................................6 5.2 SWMP Contact Information...................................................................................7 5.3 Identification and location of all potential pollution sources..................................8 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention ........... 8 5.5 BMP Implementation.............................................................................................10 6. CONCLUSIONS 6.1 Compliance with Standards..................................................................................13 6.2 Drainage Concept..................................................................................................13 7. REFERENCES..................................................................................................................14 t APPENDICES A Vicinity Map B Hydrologic Computations C Detention Pond Sizing Calculations ' D BMP Schedule and Cost Estimate E Figures and Tables iii , North Star design 700 Automation Drive, Unit I Windsor, CO 80550 Phone:970-686-6939 Fax:970-686-1188 December 4, 2015 Dan Mogen City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Final Drainage and Erosion Control Report for Raw Urth Designs Dear Dan, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control Report for Raw Urth Designs (Lot 20, Block 3, Evergreen Replat 1). I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Patricia Kroetch, P.E. ii FINAL DRAINAGE AND EROSION CONTROL REPORT MOM RAW URTH DESIGNS (LOT 20, BLOCK 3, EVERGREEN REPLAT 1) Prepared for: Raw Urth Designs P.O. Box 369 Bellvue, CO 80537 Prepared by: North Star Design 700 Automation Drive, Unit I Windsor, Colorado 80550 (970)686-6939 December 4, 2015 Job Number 264-10 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR RAW URTH DESIGNS (LOT 20, BLOCK 3, EVERGREEN REPLAT 1)