Loading...
HomeMy WebLinkAboutCOLLEGE EIGHT THIRTY - FDP - FDP160002 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTELOPED RUNOFF SUMMARY T. LE DESIGN BASIN TOTAL 2-yr T� 10-yr 100-yr Qz Quo QIoo POINT ID AREA Cz CIO C,00 (min) T` Tc (cfs) (cfs) (cfs) (acres) min min A A 1 0.32 1 0.84 1 0.84 1 1.00 1 5.0 1 5.0 5.0 1 0.77 1 1.31 1 3.20 D:IProjects1574-0061DrainageWydrology1574-006 Rational-Calcs_Proposed.xlsxlSummary Table DEVELOPED RUNOFF COMPUTATIONS :eb2e 5-4 Rational Method Equation: aarfaaM N8l000 eSWJWMcz aosoaaMr ragas Project: College Eight Thirty Q — Cj (C,)(li)(lA) s= at® Period Frequency Feeto= Calculations By: A. Reese l r9"='� G Date: January 13, 2016 From Section 3.2.1 of the CFCSDDC 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 1.25 Rainfall lntenSitV: Note: The product of C time Cr shell not exceed 1.00 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 2-yr 30-yr 100-yr i Intensity, Intensity, Intensity, Flow, Flow, Flow, Design Basin(s) Area, A T` T` T° C2 CIO C1oo i2 i10 iloo Q2 Q10 Q1oo Point (acres) (min) (min) (min) (in/hr) (in/hr) (in/hr) (cfs) (efs) (cfs) A A 0.32 5.0 5.0 5.0 0.84 0.84 1.00 2.85 4.87 9.95 0.77 1.31 3.20 D:VlrojectsZ74-0061DrainageViydrology1574-006 Rational-CaICs Proposed.xlsxorect-Runoff T. 1.87(1.1-C*Cf)� = V/ I t = L / 60V '� = TI + T, (Equation RO-2) I 'elocity (Gutter Flow), V = 208v (Equation RO-4) 'elocity (Swale Flow), V = 155� TOTE: C,alue for Overland flwrs over grassy wdaces; C = 0.25 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Table 3-4 AASSDEGL MZ=W s=QU=LT AD=Md=2 FACTOna storm Retorn Pariod FreQaancy Factor Isears) C. 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times Cf shall not exceed 1.00 Project: College Eight Thirty Calculations By: A. Reese Date: January 13, 2016 Overland Flow Gutter Flow Swale Flow Time Of concentration Design C*C C*C, C*C Length, Slope, T, T, T, Length, Slope, Velocity, Tt Length, Slope, Velocity, T, 2-yr 10-yr 100-yr Point Basin Is Length (2-yr (10-yr (100-yr L S 2-y7 10•y� 100-y7 L S V (min) L S V (r"I") T. T, T, >500'? Cf(2- O) Ca1.00) C,=1.25) (ft) (%) (min) (min) (min) (ft) (%) (ft/s) (ft) (%) (ft/s) (min) (min) (min) D:IProjectsl574-0061DrainageViydmlogyt574-006 Rational-Calcs Proposed.XIUITc-2-N_&_100-yv DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS CHARACTER OF SURFACE: Streets, Parking Lots, Roofs, Alleys, and Drives: Asphalt............................................................................................... Concrete............................................................................................. Gravel................................................................................................ Roofs................................................................................................. Concrete Pavers .................................................................................... Lawns and Landscaping SandySoil.......................................................................................... Clayey Soil.......................................................................................... Runoff Coefficient Percentage Impervious Project: College Eight Thirty Calculations By: A. Reese Date: January 13, 2016 2-year Ct = 1.00 10-year C, = 1.00 100-year C, = 1.25 0.95 100 0.95 90 0.50 40 0.95 90 0.40 22 0.15 0 0.25 0 Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Desi n Criteria and Construction Standards, Table 3-3. % Im ervious taken from UDFCD USDCM, Volume I. Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite Po �� Imp erv. A 13,997 0.32 0.00 0.03 0.23 0.00 0.05 0.02 0.84 0.84 1.00 75.7 TOTAL ONSITE 13,997 0.32 0.00 0.03 0.23 0.00 1 0.05 0.02 0.84 0.84 1.00 75.7 D.,Wrojectsl574-0061DrainagetHydrology1574-006 Rational-Calcs Pmposed.xlsxlc-Values "ISTING RUNOFF SUMMARY TAP' DESIGN BASIN TOTAL 2-yr T` 10-yr 100-yr Q2 Q+o Q+oo AREA C z C +o C ciao T` T` POINT ID (min) (cfs) (cfs) (cfs) (acres) (min) (min) A A 0.32 1 0.95 1 0.95 1 1.00 5.0 5.0 5.0 0.87 1 1.49 3.20 D:IProjectsl574-0061DrainageWydrology1574-006 Rational-Calcs_Existing.xlsxlSummaryTable EXISTING RUNOFF SUMMARY TABLE Sable 3-4 Rational Method Equation: w.:sacmm =Ta0o Fla QM= xoaoaTNM: VACT= Project: College Eight Thirty Q— Cf a Period ►reGoenoS Feet= Calculations By: A. Reese lC/lZ/l`4/ Date: January 13, 2016 From Section 3.2.1 of the CFCSDDC 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 L.25 Rainfall Intensity: Note: The product of C time CZ ahall not erteed 1.00 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDQ, Figure 3.1 2-yr 10-yr 100-yr Intensity, Intensity, Intensity, Flow, Flow, Flow, Design Basin(s) Area, A T, T. Tc Cz CIO Ctoo iz i10 iloo Qz 410 4100 Point (acres) (min) (min) (min) (in/hr) (in/hr) (in/hr) (cfs) (Cfs) (cfs) A A 0.32 5.0 5.0 5.0 0.95 0.95 1 1.00 2.85 4.87 9.95 0.87 1.49 3.20 cv D:Vc�rojectst674-0061DrainageViydrologyl574-006 Rational-Calcs_Exisfing.xlsxlDirect-Runoff EXISTING RUNOFF SUMMARY TABLE Overland Flow. Time of Concentration: 1.87(1.1 — C * Cf ) 'V /T Table 3-4 Project: College Eight Thirty T — PAXTOM aISx� Calculations : Reese I � VMQUMWT nwWMZNT FACIMe Date: January 13, 2016 Gutter/Swale Flow. Time of Concentration: atom Re Period rzaqizency hector Tf = L / 60V Isaare) C. T, = T, + TI (Equation RO-2) 2 to 10 1.00 11 to 25 1.10 Velocity (Gutter Flow), V = 20•S'4 (Equation RO-4) 26 to 50 1.20 Velocity (Swale Flow), V = 15S 51 to 100 1.25 Note: The product of C times Cf shall not exceed 1.00 NOTE: C-value for wetland flows suer grassy surfaces: C = 0.25 Overland Flow Gutter Flow Swale Flow Time of Concentration Design Basin C*Cf C*Cf C* Len Length, Slope, TI TI TI Length, Slope, Velocity, Tf Length, Slope, Velocity, Ti 2-yrT(min) -yr Point Is Length (2•yr (10-yr (100-yr L S 2-yr 10-yr 100-yr L S V L S V T�I F(m!n)r >500'7 Cf=1.00) Cf=1.00) Cf=1.25) (ft) (%) (min) (min) (min) M (%) (Ws) (mini (f) (%) (ft/s) (min) (min) A A No 0.25 1 0.25 1 0.31 1 26 5.0 4.7 1 4.7 1 4.4 1 0 0.0 0.00 N/A 0 0.0 0.00 N/A 5.0 1 5.0 1 5.0 D:IPrgwst574-0O61D2inagevbdrology1574-006_Rabonal-Calm Ecisfing.x1v%Tc-2-yr 8 100-yr EXISTING RUNOFF SUMMARY TABLE CHARACTER OF SURFACE: Sheets, Parking Lots, Roofs, Alleys, and Drives: Asphalt............................................................................................... Concrete............................................................................................. Gravel................................................................................................ Roofs................................................................................................. Concrete Pavers .................................................................................... Lawns and Landscaping SandySoil.......................................................................................... Clayey Soil.......................................................................................... Runoff Coefficient Percentage Impervious Project: College Eight Thirty Calculations By: A. Reese Date: January 13, 2016 2-year G = 1.00 10-year C, = 1.00 100-year c, = 1.25 0.95 100 0.95 90 0.50 40 0.95 90 0.40 22 0.15 0 0.25 0 Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A 13,997 0.32 0.00 0.24 0.08 0.00 0.00 0.00 0.95 0.95 1.00 90.0 TOTAL ONSITEI 13,997 1 0.32 0.00 1 0.24 0.08 1 0.00 0.00 1 0.00 0.95 0.95 1.00 90.0 D:IProjects1574-0061Drainageftdrology1574-006 RatfonalCalcs Existing. xlsxlGValues EXISTING PROPOSED o � d • 4 • . • / . I .. iT (UTi'��� • I � p p p fI}[ r -r�.�, Ilppp��� a ll • rI}3f .l II • I • D o - c , � o a w f 1 z � --- I Z D r 0 z w� ° < o, LLj a w uj (7 i' I6 J , _ _�• J J_,. .a •.� �__ _. O Ab - d Dr j e • • .4 ad • ♦ >� . as LOCUST STREET LOCUST STREET SURFACE AREA (SF) %IMPERV IMPERV. AREA (SF) ROOFTOP -;�� 3,438 100% 3,438 CONCRETE 10,559 100% 10,559 ASPHALT 0 100% 0 LANDSCAPE 0 0% 0 SURFACE AREA (SF) %IMPERV. IMPERV. AREA (SF) ROOFTOP 9,879 100% 9,879 CONCRETE 1,385 100% 1,385 ASPHALT 0 100% 0 PAVERS 2.076 40% 630 LANDSCAPE 657 0% 0 TOTALS 13,997 TOTAL= 13,997 TOTALS 13.997 TOTAL= 12,094 DEsa:iPrroN EXISTING VS. PROPOSED NORTHERN COLLEGE EIGHT THIRTY IMPERVIOUS AREA ENGINEERING FORT COLLINS of ,� sU- DRAWING COLORADO A. REESE 1 =3a S K-C 1 OnsE PHOJEcr 301 N. !boas Wed. Suite 100 PHONE: 970.221.4158 JANUARY 13,2016 574-006 Fart Wlins, Col a 80521 w .na ii,wrginwnrgc ■V NORTHERN ENGINEERING Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since more than 10,000 sf of the project site will be disturbed, a comprehensive Stormwater Management Plan will be prepared for this project at Final Design. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. There are no existing stormwater BMP's currently on -site. In order to bring the site into compliance with the Low Impact Development Standards adopted by the city, water quality mitigation and permeable pavers will be provided on -site. Water quality treatment will occur through a variety of methods. The first method is the use of a raised bio-retention area (Stormwater Planter Boxes) along the west side of the building that intercepts runoff from rooftop downspouts on the west side. These planter beds will have an engineered section designed to remove particulates and contaminants from the runoff. While most minor events are expected to infiltrate into the ground, a subdrain is provided to drain the Planter Boxes should it become overburdened. The underdrain will outfall directly into the existing inlet located at Locust Street and College Avenue. There will also be an area of permeable pavers installed on the northeast corner of the project site. This area of pavers will treat not only the exposed parking areas, but also the rooftop drainage by routing runoff into the paver subbase. A subdrain and monitoring basins will be provided for the paver subbase that ties into the same system as the Planter Boxes. The subdrain will have a water quality control structure that will slow the release of stormwater from the paver subbase and promote infiltration as well as to increase contact time across the surface area of the subbase. The City LID requirements specify that no less than 25% of all new paving shall be treated using permeable paving technique. In the case of this project, 2,076 sf of permeable pavers will be provided, which is 100% of the total 2,076 sf of new paving in parking areas, which far exceeds the requirement. The City LID requirements also specify that no less than 50% of any new impervious areas must be treated using LID techniques. The combination of treatment provided by the Permeable Pavers and Stormwater Planter will treat 11,068 sf of impervious area on the site, which is 82.67% of the new impervious areas proposed with the project, which again far exceeds the amount required by city code. A separate LID Conformance Report and Exhibit have been provided to document LID compliance. To summarize, the proposed grading concept closely matches existing elevations and drainage patterns. Existing site imperviousness has decreased from the existing condition, and a variance to the requirement to provide onsite detention using a 2-year historic release rate will be requested. Stormwater quality has been provided, and exceeds the city requirements for Low Impact Development paving and treatment. Therefore, it is my professional opinion that College Eight Thirty satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Andrew Reese Project Engineer Nicholas W. Haws, PE LEED Project Manager AP enc. W INORTHERN ENGINEERING Drainage Letter Report Date: January 13, 2016 Project: College Eight Thirty Fort Collins, Colorado Attn: Stormwater Staff City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Staff: Project No. 574-006 This letter serves to address the stormwater impacts of the College Eight Thirty project. The project is a redevelopment of the Schrader's Country Store located on the northeast corner of College and Locust Street. The site currently consists of rooftop, concrete walks, and asphalt parking areas. On -site drainage currently flows out from the building to the adjacent streets. Once it reaches the streets, water flows south on College, then is directed east along Locust. The total impervious area of the existing site is approximately 13,997 square -feet. The existing percent impervious for the entire site is 90.0%. The proposed redevelopment will remove the existing structures from the site and replace them with a mixed -use building. In addition to the new building, the parkways will be modified to meet current Land Use Code requirements, including sidewalks and landscaping that is not currently present or poorly defined. An area of pavers is also proposed at the northeast corner of the site, which is the only area of exposed pavement within the property line. Existing drainage patterns will generally be followed. The total impervious area of the proposed redevelopment is roughly 13,340 square -feet. When the impervious value of 40% for pavers is considered, the effective impervious area decreases to 12,094 square feet and the proposed percent impervious for the entire site decreases to 75.7%. An exhibit depicting existing and proposed impervious areas has been provided. The site is located in the Old Town Drainage Basin. Historically, on -site detention has not been required so long as there is no increase in impervious area. Since the redevelopment does not propose an increase in runoff, detention would not have been required. However, changes to City policy now require that a project that is being completely redeveloped must provide onsite detention with a 2-yr historic release rate. However, a variance may be justified if the site has been paying fees for the higher imperviousness. Verification of the fees paid to date is underway, however the current assumption is that the site has been paying the higher fees, and will therefore be exempt from the 2-year release and onsite detention requirements. There are no regulatory floodplains associated with the project. 301 N. Howes Street, Suite 100, Fort Collins, CO 80521 1 970.221.4158 1 www.northernengineering.com