HomeMy WebLinkAboutCITY OF FORT COLLINS COMMUNITY RECYCLE CENTER - FDP - FDP150047 - CORRESPONDENCE -Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/28/2015
12/28/2015: No Comment as all comments were resolved with materials submitted
on 4/29/2015. If you need clarification concerning this section, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountyCaifcgov.com
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 01/12/2016
01/12/2016: There are spelling issues with some text on sheet 2. See redlines.
Topic: Landscape Plans
Comment Number: 2
01/12/2016: No comments.
Topic: Lighting Plan
Comment Number: 3
01/12/2016: No comments.
Topic: Site Plan
Comment Number: 1
01/12/2016: No comments.
Comment Originated: 01/12/2016
Comment Originated: 01/12/2016
Comment Originated: 01/12/2016
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/13/2016
01/13/2016: any final red lines on signing and striping will be provided by Friday.
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom(a)fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/13/2016
01/13/2016: 26 parking spaces would require 2 handicap spaces be provided. One
of these will need to be a van -accessible space. Please label these clearly on the
site plan.
Page 4 of 4
Comment Number: 2 Comment Originated: 01/08/2016
01/08/2016: Transformer and meter locations will need to be coordinated with Light
& Power Engineering. Transformer location needs to be within 10' of an asphalt
surface accessible by a line truck. A minimum clearance of 8' must be maintained
in front of the transformer doors and a minimum of 3' on the sides and back.
Certain building materials and or building design may require more clearance.
Please click on the following link for Electric Construction, Policies, Practices and
Procedures.
http://www.fcgov. com/utilities/business/builders-and-developers/development-forms
-guidelines-regulations
Comment Number: 3 Comment Originated: 01/08/2016
01/08/2016: A C-1 Form and a One -line diagram will need to be submitted to Light
& Power Engineering for review. Please click on the following link for the C-1 Form.
http://www.fcgov.com/uti lities/business/builders-and-developers/development-forms
-guidelines-regulations
Comment Number: 4 Comment Originated: 01/08/2016
01/08/2016: Electric Capacity Fee and Building Site charges will apply to this
development. Please click on the following link for Estimated Light & Power charges
and the Light & Power Fee calculator.
http://www.fcgov. com/util ities/business/builders-and-developers/plant-investment-de
velopment-fees
Comment Number: 5
Comment Originated: 01/08/2016
01/08/2016: Please contact Light & Power Engineering if you have any questions at
221-6700. Please reference our policies, development charge processes, and use
our fee estimator at
http://www.fcgov.com/uti lities/business/bu ilders-and-developers.
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen(cDfcgov.com
Topic: General
Comment Number: 2
Comment Originated: 01/12/2016
01/12/2016: Completed and signed variance form is required for paver variance.
The variance submitted will be accepted but needs to include signature from the
owner.
Comment Number: 3 Comment Originated: 01/12/2016
01/12/2016: Please hatch the area of the rain garden.
Comment Number: 4 Comment Originated: 01/12/2016
01/12/2016: Please extend riprap to the toe of the spillway per redline.
Comment Number: 5
Comment Originated: 01/12/2016
01/12/2016: Please provide evidence that the detention basin is in compliance with
drain times per Colorado Revised Statute 37-92-602(8). More information on this
statute is available at http://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to
show compliance is available for download at
http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at
(970)224-6192 or dmogen@fcgov.com with any questions about this requirement or
for assistance with the spreadsheet.
Comment Number: 6
Comment Originated: 01/12/2016
01/12/2016: Please hatch the area that would be inundated if the forebay were to be
full.
Contact: Jesse Schlam, 970-218-2932, jschlam(cDfcgov.com
Page 3 of 4
Comment Number: 2 Comment Originated: 01/12/2016
01/12/2016: the ODP mylar needs to be updated.
The northern most access point - this needs to be labeled as 'right -in/ right -out'
The access point to the substation - An arrow needs to be provided here to show
that access is to remain. This arrow needs to be labeled 'Limited volume access'.
The southern access point into the Recycle center - the label for this access needs
to be changed to identify that this is to be a 3/4 access, so '3/4 access point
(right -in/ right -out/ left in).
I'll hold onto the sheet that has the signature block and that does not need to be
redone - just provide me with a new mylar for the 2nd sheet.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette(cDfcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/11/2016
01/11/2016: Please add the gravel areas to the legend on the landscape plan.
Topic: Lighting Plan
Comment Number: 2 Comment Originated: 01/11/2016
01/11/2016: It does not appear that the lighting is meeting the requirements in LUC
Section 3.2.4 in some places. Please update the lighting to ensure the following
requirement is met:
"Light levels measured twenty (20) feet beyond the property line of the development
site (adjacent to residential uses or public rights -of -way) shall not exceed one -tenth
(0.1) foot-candle as a direct result of the on -site lighting."
Comment Number: 3 Comment Originated: 01/11/2016
01/11/2016: Please select a warmer color temperature for the LED light fixtures.
Cooler color temperatures are harsher at night and cause more disruption to
circadian rhythms for both humans and wildlife. Kelvin temperatures closer to
2700K would be preferred - though the 3000K versions of the light fixtures currently
proposed would work.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, ririshna.fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/08/2016
01 /08/2016: Light & Power has existing electric facilities adjacent to the site along
Timberline Rd. and also running along the South edge of the proposed site. Light &
Power will have to cut into the existing facilities at the Southeast corner of the site to
bring in power.
Any existing electric infrastructure that is located within the limits of the project that
needs to be relocated will be at the expense of the developer. If the City's existing
electric facilities are to remain then they must be located within a utility easement.
Page 2 of 4
0
Fort Collins
January 13, 2016
Daman Holland
Ripley Design, Inc.
401 W. Mountain Ave. #100
Fort Collins, CO 80525
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221,6750
970.224.6134 - fax
fcgov. com/developmentreview
RE: City of Fort Collins Community Recycle Center, FDP150047, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at
970-224-6045 or cfrickey@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey(cDfcgov.com
Topic: General
Comment Number: 3 Comment Originated: 01/13/2016
01/13/2016: What type offence are you proposing to construct? Please note that
chain -link fencing is not allowed for screening purposes.
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 01/12/2016
01/12/2016: The landscape plan shows tree #21 as being transplanted but the tree
disposition table shows 2.5 mitigation trees for its transplant. Since tree #21 is not
being removed, you do not need to show mitigation trees for this specific tree.
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/11/2016
01/11/2016: Please add the bicycle parking count to the parking table.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, siangenberger(aUcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/12/2016
01/12/2016: 1 have no comments on the site and utility plans.
Page 1 of 4