HomeMy WebLinkAboutKMART PLAZA - PDP/FDP - 38-97 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTNo Text I 1 Appendix B — Hydraulic Calculations 1 1 II tJ 11 I 1 1 11 1 1 1 1 ' FLOW CALCULATIONS 10-year EXISTING DP 1 Sub -Basin Area C tc C"A I Q A 0.83 0.76 5.0 0.63 5.6 3.5 2 B 1.87 0.84 8.5 1.57 4.6 7.2 3-a C-1 1.10 0.80 11.4 0.88 4.2 3.7 3-b C-2 0.37 0.70 9.3 0.26 4.5 1.2 4 D 1.53 0.88 5.3 1.35 5.5 7.4 5 E 1.22 0.83 9.2 1.01 4.5 4.6 ' 6 F 1.80 0.89 5.0 1.60 5.6 9.0 7 G 0.71 0.87 5.5 0.62 5.5 3.4 8 H 0.43 0.86 5.2 0.37 5.6 2.1 TOTALS 9.86 42.02 100-year EXISTING DP Sub -Basin Area C tc C'A I Q 1 A 0.83 0.82 5.0 0.68 7.0 4.8 2 B 1.87 0.88 8.5 1.65 7.0 11.5 3-a C-1 1.10 0.85 11.4 0.94 6.8 6.4 ' 3-b C-2 0.37 0.78 9.3 0.29 7.0 2.0 4 D 1.53 0.91 5.3 1.39 7.0 9.7 5 E 1.22 0.88 9.2 1.07 7.0 7.5 ' 6 F 1.80 0.91 5.0 1.64 7.0 11.5 7 G 0.71 0.91 5.5 0.65 7.0 4.5 8 H 0.43 0.89 5.2 0.38 7.0 2.7 TOTALS 9.86 60.59 10-year PROPOSED DP Sub -Basin Area C tc C"A I Q 1 A 0.83 0.76 5.0 0.63 5.6 3.5 2 8 1.87 0.84 8.5 1.57 4.6 7.2 3-a C-1 1.10 0.80 11.4 0.88 4.2 3.7 ' 3-b C-2 0.37 0.70 9.3 0.26 4.5 1.2 4 D 1.53 0.88 5.3 1.35 5.5 7.4 5 E 1.22 0.82 9.3 1.00 4.5 4.5 ' 6 F 1.80 0.89 5.0 1.60 5.6 9.0 7 G 0.71 0.87 5.5 0.62 5.5 3.4 8 H 0.43 0.86 5.2 0.37 5.6 2.1 ' TOTALS 9.86 41.97 100-year PROPOSED DP Sub -Basin Area C tc C"A I Q 1 A 0.83 0.82 5.0 0.68 7.0 4.8 2 B 1.87 0.88 8.5 1.65 7.0 11.5 3-a C-1 1.10 0.85 11.4 0.94 6.8 6.4 3-b C-2 0.37 0.78 9.3 0.29 7.0 2.0 4 D 1.53 0.91 5.3 1.39 7.0 9.7 5 E 1.22 0.86 9.3 1.05 7.0 7.3 6 F 1.80 0.91 5.0 1.64 7.0 11.5 7 G 0.71 0.91 5.5 0.65 7.0 4.5 8 H 0.43 0.89 5.2 0.38 7.0 2.7 TOTALS 9.86 60.42 DRAINAGE CRITERIA MANUAL RUNOFF 50 30 t- 20 Z to U a 10 Z ILI C- C) Cn 5 Lil 3 Q U 2 C IS.I r.. C 1 fHy I 0 4.0 Oy Cl I IQ.� I I LT ?mil U 4� C ;r I T aT 1 1ti 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I F I I I I I I III I I I I I !III I III Figure 3-3 .2 .3 .5 I 1' I ,'5 2 3 5 VELOCITY IN FEET PER SECOND ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. 10 20 MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE:: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5-1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT No Text TIME OF CONCENTRATION - EXISTING SUB -BASIN DATA Ti / To Tt Tc CHECK LENGTH, SLOPE, Ti, LENGTH, SLOPE, VEL, Tt, LENGTH, Tc=(L/180)+10 Tc, Desi nation C5 Area ft % min ft % fps min FT min min A 0.72 0.83 60 3.3 3.6 160 2.6 3.3 0.8 220 11.2 5.0 B 0.81 1.87 380 1.7 8.5 380 12.1 8.5 C-1 0.77 1.10 310 1.0 10.5 50 2.7 1.2 0.7 20 0.6 1.5 0.2 380 12.1 11.4 C-2 0.67 0.37 210 1.9 9.1 30 1.5 2.4 0.2 240 11.3 9.3 D 0.85 1.53 110 2.0 3.7 240 1.7 2.5 1.6 350 11.9 5.3 E 0.81 1.22 150 1.0 6.4 235 0.5 1.4 2.8 385 12.1 9.2 F 0.86 1.80 110 2.0 3.6 195 1.9 2.9 1.1 305 11.7 5.0 G 0.85 0.71 110 2.0 3.7 265 1.6 2.5 1.8 375 12.1 5.5 H 0.83 0.43 180 2.0 5.2 1 1 1 1 180 11.0 5.2 TIME OF CONCENTRATION - PROPOSED SUB -BASIN DATA Ti/To Tt Tc CHECK LENGTH, SLOPE, Ti, LENGTH, SLOPE, VEL, Tt, TOJAL LENGTH, Tc=(L/180)+10 Tc, Designation C5 Area ft % min ft % fps min FT min min A 0.72 0.83 60 3.3 3.6 160 2.6 3.3 0.8 220 11.2 5.0 B 0.81 1.87 380 1.7 8.5 380 12.1 8.5 C-1 0.77 1.10 310 1.0 10.5 50 2.7 1.2 0.7 20 0.6 1.5 0.2 380 12.1 11.4 C-2 0.67 0.37 210 1.9 9.1 30 1.5 2.4 0.2 240 11.3 9.3 D 0.85 1.53 110 2.0 3.7 240 1.7 2.5 1.6 350 11.9 5.3 E 0.79 1.22 150 1.0 6.8 120 0.5 1.4 1.4 115 0.8 1.8 1.1 385 12.1 9.3 F 0.86 1.80 110 2.0 3.6 195 1.9 2.9 1.1 305 11.7 5.0 G 0.85 0.71 110 2.0 3.7 265 1.6 2.5 1.8 375 12.1 5.5 H 0.83 0.43 180 2.0 5.2 180 11.0 5.2 I 1 1 1 1 SUB -BASIN "E" - PROPOSED DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building 6,500 0.15 0.85 0.90 0.90 90% Asphalt 34,338 0.79 0.88 0.90 0.93 100% Landscaping 6,381 0.15 0.18 0.25 0.45 7% Concrete 6,124 0.14 0.87 0.88 0.89 96% Totals / Average Values 53,343 1.22 0.79 0.82 0.86 87% M:M=L'I►91i A DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building 30,800 0.71 0.85 0.90 0.90 90% Asphalt 43,560 1.00 0.88 0.90 0.93 100% Landscaping 800 0.02 0.18 0.25 0.45 7% Concrete 3,360 0.08 0.87 0.88 0.89 96% Totals / Average Values 78,520 1.80 0.86 0.89 0.91 95% SUB -BASIN "G" DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building 3,400 0.08 0.85 0.90 0.90 90% Asphalt 25,866 0.59 0.88 0.90 0.93 100% Landscaping 1,300 0.03 0.18 0.25 0.45 7% Concrete 480 0.01 0.87 0.88 0.89 96% Totals / Average Values 31,046 0.71 0.85 0.87 0.91 95% SUB -BASIN "H" DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building 3,839 0.09 0.85 0.90 0.90 90% Asphalt 13,276 0.30 0.88 0.90 0.93 100% Landscaping 1,100 0.03 0.18 0.25 0.45 7% Concrete 700 0.02 0.87 0.88 0.89 96% Totals / Average Values 18,915 0.43 0.83 0.86 0.89 92% I rSUB "A" -BASIN DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building 3,485 0.08 0.85 0.90 0.90 90% Asphalt 20,473 0.47 0.88 0.90 0.93 100% Landscaping 7,841 0.18 0.18 0.25 0.45 7% Concrete 4,356 0.10 0.87 0.88 0.89 96% Totals / Average Values 36,155 0.83 0.72 0.76 0.82 78% ' SUB -BASIN "B" DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building Asphalt 6,600 64,411 0.15 1.48 0.85 0.88 0.90 0.90 0.90 0.93 90% 100% Landscaping 7,301 0.17 0.18 0.25 0.45 7% Concrete 3,145 0.07 0.87 0.88 0.89 96% Totals / Average Values 81,457 1.87 0.81 0.84 0.88 91% SUB -BASIN "C-1" DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building 7,075 0.16 0.85 0.90 0.90 90% Asphalt 32,527 0.75 0.88 0.90 0.93 100% ' Landscaping 7,289 0.17 0.18 0.25 0.45 7% Concrete 1,025 0.02 0.87 0.88 0.89 96% ' Totals / Average Values 47,916 1.10 0.77 0.80 0.85 84% SUB -BASIN "C-2" DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Asphalt 8,337 0.19 0.88 0.90 0.93 100% Landscaping 4,835 0.11 0.18 0.25 0.45 7% Concrete 2,945 0.07 0.87 0.88 0.89 96% Totals / Average Values 16,117 0.37 0.67 0.70 0.78 71 % ' "D" SUB -BASIN DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Building 17,825 0.41 0.85 0.90 0.90 90% ' Asphalt 44,922 1.03 0.88 0.90 0.93 100% Landscaping 2,040 0.05 0.18 0.25 0.45 7% ' Concrete 1,860 0.04 0.87 0.88 0.89 96% Totals / Average Values 66,647 1.53 0.85 0.88 0.91 94% ' SUB -BASIN "E" - EXISTING DESCRIPTION AREA (SF) AREA (AC) C5 C10 C100 I Asphalt 45,393 1.04 0.88 0.90 0.93 100% Landscaping 5,270 0.12 0.18 0.25 0.45 7% Concrete 2,480 0.06 0.87 0.88 0.89 96% ' Totals / Average Values 53,143 1.22 0.81 0.83 0.88 91% I 1 DRAINAGE CRITERIA MANUAL RUNOFF TABLE 3-1 (42) RECOMMENDED -RUNOFF COEFFICIENTS AND PERCENT IMPERVIOUS LAND USE OR PERCENT FREQUENCY SURFACE CHARACTERISTICS IMPERVIOUS 2 5 10 100 Business: Commercial Areas 95 .87 .87 .88 .89 Neighborhood Areas 70 .60 .65 .70 .80 Residential: Single -Family * .40 .45 .50 .60 Multi -Unit (detached) 50 .45 .50 .60 .70 Multi -Unit (attached) 70 .60 .65 .70 .80 1/2 Acre Lot or Larger * .30 .35 .40 .60 Apartments 70 .65 .70 .70 .80 Industrial: Light Areas 80 .71 .72 .76 .82 Heavy Acres 90 .80 .80 .85 .90 Parks, Cemetaries: 7 .10 .18 .25 .45 Playgrounds: 13 .15 .20 .30 .50 Schools: 50 .45 .50 .60 .70 Railroad Yard Areas 20 .20 .25 .35 .45 Undeveloped Areas: Historic Flow Analysis- 2 (See "Lawns") Greenbelts, Agricultural Offsite Flow Analysis 45 (when land use not defined) Streets: Paved 100 Gravel (Packed) 40 nriva and Walkc- 96 Roofs: Lawns, Sandy Soil Lawns, Clayey Soil 90 0 0 .43 .47 .55 .65 .87 .88 .90 .93 .40 .45 .50 .60 .87 .87 .88 .89 .80 .85 .90 .90 .00 .01 .05 .20 .05 .15 .25 .50 NOTE: These Rational Formula coefficients may not be valid for large basins. *See Figure 2-1 for percent impervious. 11-1-90 URBAN DRAINAGE AND FLOOD CONTROL DISTRICT SECTION VI - APPENDICES ' Appendix A - Hydrologic Calculations 1 1 1 II II II II 1 U I 11 11 1 ' December 3, 1997 Kmart Plaza Retail Drainage Investigation 97-017 and additional landscaping. The present site drainage patterns of this sub -basin will not be affected by the improvements, except to redirect 3.5 cfs (100-year runoff) behind the retail space into the existing inlet via ' a 1.8-foot-wide concrete trickle channel. In fact, the proposed shops would actually decrease the amount of direct runoff from this sub -basin by 0.1 cfs and 0.2 cfs for the 10-year and 100-year storms, respectively. SECTION IV - DRAINAGE FACILITY DESIGN A. DRAINAGE STRUCTURES DESCRIPTION AND DESIGN ' As previously mentioned, the project site will require the construction of approximately 1101f of concrete trickle channel located on the east side of the proposed retail shops. This channel will be constructed to convey a portion of the sub -basin direct runoff to the existing inlet which presently accepts this runoff. The ' channel will be constructed in order to allow for the service ramp and screen wall to be constructed on the southeast corner and along the east side of the building. The channel has been designed to convey 100-year storm flows, and will have physical dimensions of 6" deep and 1.8' wide, and will slope to the inlet at 0.5% grade. ' SECTION V - CONCLUSIONS AND RECOMMENDATIONS A. CONCLUSIONS The proposed site improvements for the Kmart Plaza Retail Shops will not impact the project site nor surrounding properties, but will in fact slightly decrease the amount of direct runoff received at the existing inlet near the site access from South College Avenue (Design Point 5 on the map). No facilities are proposed for detention purposes since the site is fully developed and again, will not be negatively impacted by the proposed improvements. A small concrete trickle channel is however, proposed and will be the only drainage structure improvement proposed for the site. B. CONFORMANCE WITH DESIGN STANDARDS This drainage investigation was prepared according to the criteria set forth in the Fort Collins Storm Drainage Design Criteria and Construction Standards, as well as criteria established in Volume 1 of the Urban Drainage and Flood Control District Drainage Criteria Manuals. ' This project does not impact nor is impacted by any major drainageways nor modifies any major drainageway study. ' SECTION VI - REFERENCES 1. Storm Drainage Design Criteria and Construction Standards. City of Fort Collins, May 1984 (FCSDC) 2. Drainage Criteria Manual, Vol. 1, Urban Drainage and Flood Control District, March 1969 (UDTCM) I k J 1 I I 1 December 3, 1997 Kmart Plaza Retail Drainage Investigation 97-017 SECTION I — INTRODUCTION A. Purpose and Intent The purpose of this drainage investigation is to determine the extent of drainage impacts upon the Kmart Plaza Retail Center due to the addition of 6500 sf of retail space. This investigation is intended to provide the best drainage management plan possible given the confining developed conditions of the subject site and to assure the at minimum, no increase in the impacts of the site drainage upon neighboring properties and public facilities. B. Location and Description The site is located on the northwest corner of the intersection of South College Avenue and Drake Road in Fort Collins, Colorado in the Kmart Plaza shopping center. The site and surrounding properties are presently developed, and therefore present little flexibility in structure and facility modification and/or adaptation. Alternately, however, since there is little modification proposed to the site, drainage impacts upon the project site and surrounding properties will be negligible. On -site there is presently a Kmart discount store, a Jiffy Lube auto service center, and 4500 sf of independent retail. Adjacent to the site is a bank to the north across the site access, and South College Avenue to the east. A Denny's restaurant is also located north of the bank near the project location. SECTION II - DRAINAGE DESIGN AND CRITERIA A. GENERAL CONCEPT Site flows will continue to flow according to the current drainage patterns. The only alteration in drainage pattern will be the slight redirection of runoff generated in Sub -basin "E" as shown on the drainage plan, behind the proposed retail shops; this redirection will not, however, result in concentration of these flows to any other design point. B. DESIGN CRITERIA Drainage calculations and design for this project were based upon criteria set forth in the City of Fort Collins Storm Drainage Design and Construction Standards (FCSDC), and Vol. 1 of the Urban Drainage and Flood Control District Drainage Criteria Manuals (UDTCM). SECTION III - DRAINAGE BASINS A. SUB -BASIN DESCRIPTIONS Although the Kmart Plaza site contains more sub -basins than those evaluated in this report, some were eliminated due to their proximity to the project and because those sub -basins would have no impact upon nor be impacted by the proposed improvements to the Plaza. Specifically, only those sub -basins which drain toward the project site or into inlets proximal to the project site were evaluated. ' In all, eight sub -basins were delineated to describe the drainage situation at the Plaza. They range in size from 0.37 acres to 1.87 acres in size, and slope gently, from 3.3% to 1.1 %. All of the basins are presently developed and contain differing combinations of buildings, concrete walks and landscape areas in addition to the predominant asphalt pavement throughout the site. ' The sub -basin "E" which contains the proposed retail shop improvements is approximately 1.22 acres in size, slopes to the northeast at 1.0%, and currently contains only asphalt parking with minimal landscaping. tThe proposed improvements would include the addition of 6500 sf of retail space, concrete patio and walk, TABLE OF CONTENTS Item Description Page SECTION I - INTRODUCTION 1 A. Purpose and Intent B. Location and Description SECTION II - DRAINAGE DESIGN AND CRITERIA 1 A. General Concept B. Design Criteria SECTION III - DRAINAGE BASINS I B. Sub -Basin Descriptions SECTION IV - DRAINAGE FACILITY DESIGN 2 A. Drainage Structures Description and Design SECTION V - CONCLUSIONS AND RECOMMENDATIONS 2 A. Conclusions B. Conformance with Design Standards SECTION VI - REFERENCES 2 SECTION VI - APPENDICES Appendix A - Hydrologic Calculations Appendix B - Hydraulic Calculations II II II ENGINEER'S CERTIFICATION I hereby certify that this report (plan) for the Drainage Investigation for the Kmart Plaza Retail Shopsnts was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Ft. Collins Storm Drainage Design and Technical Criteria for the owners thereof. I understand that the City of FT. Collins does not and will not assume liability for drainage facilities designed by others. 1 (Affix Seal) 1 1 DIRANVAGE ]AIVESTIGATION FOR WART PLAZA RETAIL SHOPS FT. COLLINS, COLORADO FHP Job No.: 97-017 PREPARED FOR: Southwestern Production Corporation 1675 Larimer Street Suite 720 Denver, CO 80202 Attn: Thomas Oldenburg PREPARED BY: CONSULTING ( ENGINEERING 'LC x7ut Yates Drives Sune 220 Phone: 303- 87-0696 W cstininster_ CO 801)30 FAX 30 3-387-0685 Attn: Aaron Thompson December 3, 1997