Loading...
HomeMy WebLinkAboutBROOKVIEW APARTMENTS - PDP - PDP160003 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY• From: Martina Wilkinson [mailto:mwilkinson@fcgov.coml Sent: Monday, August 24, 2015 12:53 PM To: David Schmidt <david.schmidt@ripleydesigninc.com> Subject: RE: Brookview Apartments - Preliminary Design Review, PDR150007 - Traffic Study Hi David —given the trip generation and location, I don't think we need a study and it can be waived. We may need to work to ensure the access points meets standards such as sight distance, etc. Martina Martina Wilkinson, P.E. PTOE City of Fort Collins Traffic Operations mwilkinson@fcgov.com 970-221-6887 From: David Schmidt [mailto:david.schmidt@ripleydesigninc.com] Sent: Thursday, August 20, 2015 4:32 PM To: Martina Wilkinson Subject: Brookview Apartments - Preliminary Design Review, PDR150007 - Traffic Study Martina, I wanted to do a little fact checking and see if a traffic study would be required for our project. We are currently proposing 24 units. Thanks, David Schmidt land planning/ landscape architecture RIPLEY DESIGN, INC. 419 Canyon Ave., Suite 200 Fort Collins, CO 80521 office. 970.224.5828 direct. 970.498.2982 fax. 970.224.1662 david.schmidt@ripleydesigninc.com www.ripleydesigninc.com ►`1 s From: Matt Delich [mailto:matt@delichassoc.coml Sent: Thursday, August 20, 2015 7:01 AM To: David Schmidt <david.schmidt@ripleydesigninc.com> Subject: Re: Brookview Apartments - Traffic Study David, I am not sure what my next step is. The trip generation points to 'No TIS Required'. What do you need from me? Matt 2