HomeMy WebLinkAboutBROOKVIEW APARTMENTS - PDP - PDP160003 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY• From: Martina Wilkinson [mailto:mwilkinson@fcgov.coml
Sent: Monday, August 24, 2015 12:53 PM
To: David Schmidt <david.schmidt@ripleydesigninc.com>
Subject: RE: Brookview Apartments - Preliminary Design Review, PDR150007 - Traffic Study
Hi David —given the trip generation and location, I don't think we need a study and it can be waived. We may need to
work to ensure the access points meets standards such as sight distance, etc.
Martina
Martina Wilkinson, P.E. PTOE
City of Fort Collins Traffic Operations
mwilkinson@fcgov.com
970-221-6887
From: David Schmidt [mailto:david.schmidt@ripleydesigninc.com]
Sent: Thursday, August 20, 2015 4:32 PM
To: Martina Wilkinson
Subject: Brookview Apartments - Preliminary Design Review, PDR150007 - Traffic Study
Martina,
I wanted to do a little fact checking and see if a traffic study would be required for our project. We are currently proposing
24 units.
Thanks,
David Schmidt
land planning/ landscape architecture
RIPLEY DESIGN, INC.
419 Canyon Ave., Suite 200
Fort Collins, CO 80521
office. 970.224.5828
direct. 970.498.2982
fax. 970.224.1662
david.schmidt@ripleydesigninc.com
www.ripleydesigninc.com
►`1 s
From: Matt Delich [mailto:matt@delichassoc.coml
Sent: Thursday, August 20, 2015 7:01 AM
To: David Schmidt <david.schmidt@ripleydesigninc.com>
Subject: Re: Brookview Apartments - Traffic Study
David,
I am not sure what my next step is. The trip generation points to 'No TIS Required'. What do you need from me?
Matt
2